way of using waste concrete to prewert sod! erosion and provide:
[Ths method & implemeted By Fitting pipes into the slopes to.carry
Op away whe the face of the slope is sprayed with waste concrete
Hosave on material cost
vetically pleasing, econemucal and prevents materials wastageoundation
=
>
Raft foundation
This seinforced foundation
Gistriutes the load over the whole
budding area reducing the toad per
unm ama, Raft foundations are
sed where bullgingloads are high
or when ground condoms are
peor
Pile foundation
This one takes the toad of the
bulding through made-up ground
or weak solltoload bearing strata,EE Ee ee
Pile foundation is wed at the
slopes of the hill x more
sutabie forthis terrain because
the soil here'ts quite soft and
weak. The load & sizowell
Gatnb uted and thus keeping the
Dutiding stable and well
balanced.dation construction process (from site visit)
oundaton 2. Borehole is drilled using 4. The reinforcement cages
anauger placed side the borehole and
‘then filled with concrete
Tw ot
the pile 5. Fommworks are placedaround, 6. The column ts alse finshed using
etpaet dnd 6 then filed wath coments in pas. hipaa ein che gleRalt FounGgation (trom site visit)GLIVET CUNSLIULLIUTT Prucesd |
‘The ground is excavated 40 cm
deep and then levelled
‘com pacted hardcore layer
(Used 25 solid working base) and
a biinding layer (Used to prevent
Wert con crete from reancing
dow nite hardcore} ie acted
side
Reinforcements are added. This
will give more strength to the
foundation
Wood is used 2s the formwork
to hold the concrete in shape
Conarete is then poured into the
formmork, levelled andi then left
to ary
‘Then the sollis added to fl =="
thegap between the om
Y i i a
UTTPSILe Vinilyore eee
‘The slope ts excavated into steps
which are then levelled. This is
done 1 as to get Mat surfaces
instead of a slope
The surface i then covered with "I
compacted hardcore and.a
binding layer
The reinforcements which
comets of steel meshes and
steel bars are added.
The wood formwork ave placed
and concrete is poured inside.