Clock Network Synthesis

Prof. Shiyan Hu
shiyan@mtu.edu
Office: EREC 731

07/27/16

Outline

Introduction
H-tree
Zero skew clock
DME and its extension
New trends

07/27/16

Introduction

For synchronized designs, data transfer between


functional elements are synchronized by clock signals
Clock signal are generated externally (e.g., by PLL)
Clock period equation

clock period td tskew tsu


td:
Longest path through combinational logic
tskew: Clock skew
tsu: Setup time of the synchronizing elements

07/27/16

Clock Skew
Clock skew is the maximum difference in the arrival
time of a clock signal at two different components.
Clock skew forces designers to use a large time period
between clock pulses. This makes the system slower.
So, in addition to other objectives, clock skew should
be minimized during clock routing.

07/27/16

Clock Design Problem


What are the main concerns for clock design?
Skew
No. 1 concern for clock networks
For increased clock frequency, skew may contribute over 10% of
the system cycle time

Power
very important, as clock is a major power consumer
It switches at every clock cycle

Noise
Clock is often a very strong aggressor
May need shielding

Delay
Not really important
But slew rate is important (sharp transition)
07/27/16

The Clock Routing Problem


Given a source and n sinks.
Connect all sinks to the source by an interconnect
tree so as to minimize:
Clock Skew = maxi,j |ti - tj|
Delay = maxi ti
Total wirelength
Noise and coupling effect

07/27/16

Clock Design Considerations


Clock signal is global in nature, so clock nets are
usually very long.
Significant interconnect capacitance and resistance

So what are the techniques?


Routing
Clock tree versus clock clock mesh (grid)
Balance skew and total wire length

Buffer insertion
Clock buffers to reduce clock skew, delay, and distortion in
waveform.

Wire sizing
To further tune the clock tree/mesh

07/27/16

Clock trees
A path from the clock source to clock sinks
Clock Source

FF

FF

FF

FF

FF

07/27/16

FF

FF

FF

FF

FF

Clock trees
A path from the clock source to clock sinks
Clock Source

FF

FF

FF

FF

FF
07/27/16

FF

FF

FF

FF

FF
9

H-tree Algorithm
Minimize skew by making interconnections to subunits
equal in length
Regular pattern

Can be used when terminals are evenly distributed

However, this is never the case in practice


So strict (pure) H-trees are rarely used
However, still popular for top-level clock network design
Cons: too costly is used everywhere

07/27/16

10

07/27/16

11

A Zero Skew Algorithm


Use Elmore delay model to compute delay
Try to minimize wire length, but not done very well
Lots of follow up works to minimize total wire length while
maintaining zero skew
DME and its extensions

07/27/16

12

An Exact Zero Skew Algorithm [Tsay93]

07/27/16

13

A Zero Skew Algorithm [Tsay91]


This paper built the foundation for zero skew
Its principal can also be used to do prescribed skew
(just solve a slightly different delay equation with nonzero skew)
However, its merging is kind of simple
May have too much total wire length

07/27/16

14

Deferred Merge Embedding


As its name implies, DME defers the merging as late
as possible, to make sure minimal wire length cost for
merging
Independently proposed by several groups
Edahiro, NEC Res Dev, 1991
Chao et al, DAC92
Boese and Kahng, ASIC92

DME needs an abstract routing topology as the input


It has a bottom-up phase followed by a top-down
process

07/27/16

15

Bottom Up Phase
Each node v has a merging segment ms(v).
A merging segment is a Manhattan arc
Manhattan arc: has slope +/- 1 or has zero length
(could be a point).
tiled rectangular region (TRR): The collection of
points within a fixed distance from a Manhattan arc.
The intersection of two TRRs is a TRR
Merging segments are always Manhattan arcs

07/27/16

16

07/27/16

17

07/27/16

18

DME Wrapup
[Boese and Kahng, ASIC92]
DME is guaranteed to find the minimum wire length
with zero skew under the linear delay model
Need to have an abstract routing graph to start with

07/27/16

19

Modification: Bounded Skew


Instead of choosing merging segments as in DME,
choose merging region of v, mr(v)
Maintains skew bound
Use boundary merging and embedding which
considers merging points lying on the nearest
boundary segments of mr(a) and mr(b)

07/27/16

20

Topology Generation
One common approach
Balanced and geometry guided
Top down-partitioning that recursively divide the set of sinks,
using alternating horizontal and vertical cuts
The balance bipartition heuristic generates a topology that
recursively divides the set of sinks into two subsets with equal
total loading capacitance

Balanced tree versus unbalanced tree?


Geometric versus capacitive load?
[Chaturvedi and Hu, ICCD03] has good survey of recent
works
Abstract topology not just geometric, but also capacitive load,
with prescribed skew
07/27/16

21

Trend
Clock skew scheduling together with clock tree
synthesis
Schedule the timing slack of a circuit to the individual
registers for optimal performance and as a second
criteria to increase the robustness of the
implementation w.r.t. process variation.

Variability is a major concern


Non-tree clock, mixed mesh/tree?

How to analyze it?


The task is to investigate a combined optimization for (P. Restle)
clock skew scheduling and clock tree synthesis such
that any unintentional clock skew is maximally
compensated by a corresponding slack at the registers.
07/27/16

22