Content
Feed Properties
Feed Inlet and Distribution
Dam Ring Modifications
Operation
HGRS
Tikaria_Mill
2
SEPT-07
Content
Feed Properties
Feed Inlet and Distribution
Dam Ring Modifications
Operation
HGRS
Tikaria_Mill
3
SEPT-07
[%]
HGRS
Tikaria_Mill
4
SEPT-07
HGRS
Material aeration
Tikaria_Mill
5
SEPT-07
HGRS
Tikaria_Mill
6
SEPT-07
Measures:
Modify cooler crusher or install a crusher
Sieving of crusher product
Try to work with higher hydraulic pressure
Experience:
HGRS
Tikaria_Mill
7
SEPT-07
HGRS
Tikaria_Mill
8
SEPT-07
Content
Feed Properties
Feed Inlet and Distribution
Dam Ring Modifications
Operation
HGRS
Tikaria_Mill
9
SEPT-07
Feed distribution
Basic Rule: Feed on Center of table
product extraction
fresh feed
internal
circulation
(pneumatical)
tailings
coarses
fall through
material
gas
HGRS
Tikaria_Mill
gas
10
SEPT-07
Content
Feed Properties
Feed Inlet and Distribution
Dam Ring Modifications
Operation
HGRS
Tikaria_Mill
11
SEPT-07
Dam Ring
Main tasks:
Control of material retention on table
Control of bed depth
HGRS
Tikaria_Mill
12
SEPT-07
Dam ring
Increase the level of material
roller
dam ring
grindi
bed
roller
dam
In ring
Loesche & Fuller mills,
possible additional solution is:
table
3.5
liner
3.0
grinding
bed
2.5
10 [mm]
100
HGRS
Vibrations [mm/s]
Tikaria_Mill
115
Dam Ring
Impact of too high dam ring:
HGRS
Tikaria_Mill
14
SEPT-07
Problems - Solutions
Situation:
During the operation of the San
Sebastian raw mill, a capacity drop
was observed over the time of wear of
the table. The necessary cut of the
dam ring was not done.
Experience:
After the replacement of the table liner
with original thickness a significant
capacity increase was observed.
Message:
Cut the dam ring as the table wears to
maintain optimal material retention and
bed depth!
HGRS
Tikaria_Mill
16
SEPT-07
Problems - Solutions
Situation:
During the operation of the Cartago
raw mill, a capacity drop was observed
over the time of wear of the dam ring
(height was NOT affected).
Experience:
After the repair of the dam ring, the
capacity was brought up to the original
level. This leads to the conclusion, that
primarily the gap contributes to the
material retention on the grinding table
and not the height of the dam ring.
Message:
Keep the gap between rollers and dam
ring small.
HGRS
Tikaria_Mill
17
SEPT-07
Problems - Solutions
Situation:
During the commissioning of the Ras El
Ma cement mill (LM 46 2+2), operation
without water let to a reduced production.
A Loesche Suggestion was to decrease
the dam ring height (removal of 6+8) to
reduce vibrations and water injection.
Experience:
After the removal of two dam ring
segments the vibrations increased and
the production dropped significantly the
water injection had to be increased.
Message:
Lower bed depths do not necessarily lead
to an improved grinding performance
HGRS
Tikaria_Mill
18
SEPT-07
Content
Feed Properties
Feed Inlet and Distribution
Dam Ring Modifications
Operation
HGRS
Tikaria_Mill
19
SEPT-07
This seriously
affects Holcims
performance
93
58
VRM
HGRS
13
10
3
Total
12
20 23
Others
22
Damaged
Reducer
Gebr.
Pfeiffer
16
Polysius
28
Loesche
100
90
80
70
60
50
40
30
20
10
0
F.L.Smidth
/ FullerLoesche
Numbers of
Mill Supplier
Tikaria_Mill
20
SEPT-07
Vibrations
Consequence
Mill stoppage
Causes
Operation
Maintenance
Design
Feed change
Lack of feed
Low temperatures
Hydraulic failed
Feeder blockage
Worn grinding
tools
High operating
pressure
Tikaria_Mill
21
SEPT-07
HGRS
Tikaria_Mill
22
SEPT-07