Module Objectives
Learn the impact of the following features in the access dimensioning process
:
Packet Abis
A o IP
Elaborate a numerical example based on a sample network on how to
dimension:
The interfaces
The Network Elements
Air interface
Air interface
...
...
BCSU dim
FlexiBSC dim
Gb interface dim
Frame Relay Bearer Channel capacity
Capacity for Gb over IP
Gb interface dim
For internal use
#ETS2 for Gb
D-504133512 / v.0.7/ Draft / NPO / Raimo Ahosola/22 Oct 2013
TCSM3i dim
#channels
#extension steps
#IF units
ETPC (for AoIP)
2013 Nokia Solutions and Networks. All rights reserved.
Air interface
Air interface
...
...
BCSU dim
FlexiBSC dim
dim
Session Gb
2:interface
BSC
Dimensioning
Frame Relay Bearer Channel capacity
Capacity for Gb over IP
Gb interface dim
Session 3: Gb Dimensioning
TCSM3i dim
#channels
#extension steps
#IF units
ETPC (for AoIP)
10
PSN
BTS
PSN
ETH
TDM
Legacy
Ater
TDM
ETH
TDM MSC
Server
A over IP
ETPC
ETH
BSC
TDM
TCSM TDM
PSN
ETH
TDM MGW
Legacy A
11
12
14
15
16
17
Assume
60% of calls FR AMR12.2
40% of calls HR AMR4.75
0% OSC
Full load blocking 2%
3+3+3
- BCCH, 2*SDCCH, one RTSL dedicated for PS (CDED=1 RTSL) rest TCH per cell
18
19
*No of shared
PDCH.
This parameter is iterated in order to find the smallest acceptable bandwidth (the
For internal
use
2013 Nokia Solutions and Networks. All rights reserved.
D-504133512 / v.0.7/ Draft / NPO / Raimo Ahosola/22 Oct 2013
most attractive offer).
20
PDCH Throughput:
Codec distribution
Manual input
Discontinous
Transmission (ON/OFF)
Signalling
MOC
MTC
SMS
LAC per BSC
LUP
HO
Holding time
Codec distribution
AMR HR/FRFor%
internal use
D-504133512 / v.0.7/ Draft / NPO / Raimo Ahosola/22 Oct 2013
21
23
BSC Dimensioning
What needs to be dimensioned?
Dynamic Abis
(STM-1/OC3)
ET
SET
ETS2
SET
GSWB
ETPT
ET
TDM Ater
BSC
ETPE
PCU2-D
BCSU
PCU2-E
SWUs
ETP-A
GigE
A over IP
TC in
MGW
24
.
.
then:
25
26
BSC Dimensioning
Number of PCU
PCU is dimensioned separately for PAoEth and PAoTDM sites and further
separately for satellite site i.e. we may end up having 5 types of PCUs
- legacy site PCU
- PAoTDM terrestrial site PCU
- PAoTDM satellite site PCU
- PAoEth terrestrial site PCU
- PAoEth satellite site PCU
27
BSC Dimensioning
Number of PCU
PCU2-D or PCU2-E are required for Packet Abis. Neither PCU1 nor
PCU2-U are supported.
One PCU can handle only cells connected via legacy Abis or cells
connected via Packet Abis but not both at the same time
Target PCU utilization factor U should be of 50% (to leave
enough space for territory upgrades and at the same time allow for high
overbooking)
PS multiplexing is not implemented in RG20
The number of PCUs can be calculated from the following formula:
U1 = 50%
U2 = 70%
For internal use
D-504133512 / v.0.7/ Draft / NPO / Raimo Ahosola/22 Oct 2013
28
BSC Dimensioning
Number of PCUs / Cell clasification
In Packet Abis, PCU resources are assigned per cell. Two types of
cells are defined:
Connectivity Cells (CC):
Object/parameter
#(E)GPRS TRX: 3-6
Average PDCH per (EGPRS): 7-8
CDEF: 12
CDED: 1 to CDEF
Cell peak RLC/MAC throughput @MCS-9:
2012 kbps (34 RTSL)
29
BSC dimensioning
Number of PCUs / Cell clasification
Av. data
Throughput per
cell at CS
BH (Kbps)
Site
Type
Configuratio
n
Number of
sites/cells
Abis
Connectivi
ty
Cell classification
A1
4+4+4
500 sites/1500
PAoTDM
Connectivity (CC)
100
B1
2+2+2
PAoTDM
Connectivity (CC)
50
4+4+4
50 sites / 150
PAoTDM
Throughput (TC)
152
12
4+4+4
50 sites / 150
PAoEth
Throughput (TC)
152
12
CDEF
30
BSC dimensioning
Number of PCUs for Packet Abis over TDM sites
Assumption: Packet Abis specific Abis utilization (to leave room for territory upgrades
and high MCS) = 50%
A1 (CC)
B1 (CC)
C (TC)
Total PAoTDM
#PCU
4*1500 = 6000
4*600 = 2400
12*150 = 1800
10200
10200/
(1024*50%) = 19.9
3*500 = 1500
3*200 = 600
3*50 = 150
2250
2250/384 = 5.9
Number of EGPRS
TRX (GTRX=yes) per
cell * number of cells
2*1500 = 3000
2*600 = 1200
4*150 = 600
4800
4800/1024 = 4.7
1500*100 =
150000
600*50 = 30000
150*151.5 = 22725
202725
25%*202725*1.15/
(8000*70%) = 10.4
Roundup(19,9) =
20
2013 Nokia Solutions and Networks. All rights reserved.
31
BSC dimensioning
Number of PCUs for Packet Abis over Ethernet site
D (TC)
Total PAoEth
#PCU
12*150 = 1800
1800
1800/(1024*50%) = 3.5
3*50 = 150
150
150/384 = 0.4
4*150 = 600
600
600/1024 = 0.6
150*151.5 = 22725
22725
25%*22725*1.15/ (8000*70%)
= 1.2
Roundup(3.5) = 4
32
BSC Dimensioning
Number of PCU for Legacy Abis vs. Packet Abis
Then, the number of PCUs is typically less for Packet Abis in comparison with
Legacy Abis due to the more flexible usage of the resources.
33
BSC Dimensioning
Number of BCSU
# BCSU max
,
max_
TRX
_
perBCSU
*
U
max_
PCU
_
per BCSU * U
8400
24
,
max15,6 15
700 80% 5 * 80%
# BCSU max
In case of Half Rate, OSC in the network, then the TRX need to be
converted to FR TRX
34
BSC Dimensioning
Number of ETPT
256 * U
8 *U
63* U
8192 * U
# ETPT max
1
For internal use
D-504133512 / v.0.7/ Draft / NPO / Raimo Ahosola/22 Oct 2013
BSC Dimensioning
Number of ETPT according to Traffic
ntroduction
BTS load distribution factor (Uneven load factor)
35
36
BSC Dimensioning
Number of ETPT (Step 1)
CS Load Distribution Factor (due to different BH moments) = 80%
Traffic per site type
A1
=24000+3300+2400= 29700
B1
=600 cells * 5,5
Erl/cell = 3300
C
=150 cells * 16
Erl/cell = 2400
D
0
37
BSC Dimensioning
Number of ETPT (Step 2-4)
CSTraffic Total # sites # PCU # AbisE1
;
;
;
256 * U
8 *U
63* U
8192 * U
# ETPT max
Step 2:
#ETPT based on site connectivity = # sites / (256 * U)
For the example, then, #ETPT = 750 / (256 * 80%) = 3,7
Step 3:
# ETPT due to PCU = 20 / (8*80%) = 3,1
Step 4:
# ETPT = (# E1) / (63 * 80%) = 750 / (63 * 80%) = 14,9
# ETPT = 14,9 (approx. 15)
For internal use
D-504133512 / v.0.7/ Draft / NPO / Raimo Ahosola/22 Oct 2013
38
BSC Dimensioning
Number of ETPE
CStraffic Total # sites # PCU
;
;
256 *U
8 *U
8192 * U
# ETPE max
39
HW dimensioning FlexiBSC
BSC3i Capacity Evolution
(*1): BCSU capacity (per unit) steadily grows as an individual unit handles traffic of 110 TRX, 200 TRX, 500 TRX and 700 TRX for BSC3i
(*2): SS7 capacity steadily grows as available bandwidth determines the actual capacity rather than the number of links hence capacity evolution of an individual SS7 link
allows to satisfy higher and higher SS7 bandwidth requirements: 64/128/256 kbit/s links are possible in BSC3i 660,
64/128/256/512 kbit/s and HSL are possible in BSC3i 1000/2000 as well as FlexiBSC
(*3): achievable Erlang figures always depend on Traffic Model the BSC has to cope with; the figures reported in the table are achievable with nominal call mix:
(*4): Total number of TRX and BCF objects is 6000 i.e. if 4200 TRXs are used, around 1800 BCFs can be used to leave enough control channels for
transmission and signaling
(*5): Total number of LAPD links depends on SS7 realization => in case of SS7 over IP (SIGTRAN) is equal to 6144
For internal use
D-504133512 / v.0.7/ Draft / NPO / Raimo Ahosola/22 Oct 2013
40
# FlexiBSC
Erlang
# TRX
# cells
# sites
# BSCU # PCU # ETP
,
,
,
,
,
,
6
30 * U
6
25200 * LDF
# FlexiBSC max
CS _ BH ( Erl )
25200 * U
41
# FlexiBSC
Step 3. Number of cells
According to Table 1, the number of cells considered in the dimensioning
example is 2400. The maximum number of cells (BTS) in FlexiBSC (RG20)
(S15) at maximum #TRX is 4200. Then,
# FlexiBSC = 2400 / (4200 * 80%) = 0,71
Step 4. Number of sites
The number of sites is 750. The maximum number of sites in FlexiBSC (RG20)
(S15) is 1800. Then,
# FlexiBSC = 750 / (1800 * 80%) = 0,1
42
# FlexiBSC
Step 5. Number of BCSU
As mentioned on section 2.3.4, the number of BSCU required for the example
is: 15. From Table 10, the number of BCSU per FlexiBSC cabinet in RG20
(S15) is 6, then:
# FlexiBSC = 15 / 6 = 2,5
Step 6. Number of PCU
The number of PCUs was calculated on Table 6 and Table 7, by adding up the
values then a total of 24 PCUs is required for the example. The number of
PCUs per FlexiBSC in RG20 (S15) is 30. Then:
# FlexiBSC = 24 / (30* 80%) = 1,0
43
# FlexiBSC
Step 7. Number of ETP
#ETP = #ETPT +#ETPE = 15 + 1 = 16
# FlexiBSC = 16 / 6 = 2,6
# FlexiBSC = max (1.6, 2.5, 0.71, 0.1, 2.5, 1.0, 2.6) = 2.6 (round up = 3).
Note: #BCSU, #PCU, #ETPT/E, #ETS2 are # of active units. Due to
redundancy selection the actual number of units is typically higher.
44
HW dimensioning FlexiBSC
Number of racks
Check
Value
#BSC
Erlang
32100
1,6
# TRX
8400
2,5
# cells
2400
0,71
# sites
750
0,10
# BCSU
15
2,50
# PCU
24
1,0
# ETP(T)/(E)
16
2,67
# ETS2 boards
15
3
2013 Nokia Solutions and Networks. All rights reserved.
45
FlexiBSC
Boards distribution in racks
Assuming uniform distribution among BSCs, then as an example of distribution
of the boards (distribution might change, refer to planning slides):
FlexiBSC
FlexiBSC
FlexiBSC
6+6 ETPT
3 ETS2
5 BCSU
8 PCU2-E
6+6 ETPT
3 ETS2
5 BCSU
8 PCU2-E
3+3 ETPT
2 ETS2
1 ETPE
5 BCSU
8 PCU2-E
Rack 3
Rack 1
Rack 2
60
PSN
BTS
PSN
ETH
TDM
Legacy
Ater
TDM
ETH
TDM MSC
Server
A over IP
ETPC
ETH
BSC
TDM
TCSM TDM
PSN
ETH
TDM MGW
Legacy A
61
62
63
15
Number of ETPE
Number of ETPA
Total
20
64
65
66
ETPC
ETPA
70
Output of dimensioning
Site type
A1
B1
Configuration
4+4+4
2+2+2
4+4+4
4+4+4
CC/TC
CC
CC
TC
TC
Number of sites
500
200
50
50
Total # sites
800
Total # TRXs
8400
Abis connectivity
PAoTDM
PAoTDM
PAoTDM
PAoEth
1,68
0,9
1,96
2,82
n.a.
216 (s.75)
196,078
213,757
2664
1196
Legacy A [E1]
73
https://sharenet-ims.inside.nokiasiemensnetworks.com/Overview/D403795258
https://sharenet-ims.inside.nokiasiemensnetworks.com/Overview/D418321489
https://sharenet-ims.inside.nokiasiemensnetworks.com/Overview/D421037995
74
Useful datasources
https://sharenet-ims.inside.nokiasiemensnetworks.com/livelink/livelink/overview/D419078243
[12] IP Sec
https://sharenet-ims.inside.nokiasiemensnetworks.com/Open/D419822673
75
Questions ?
76