B1/VM4 vs

Allpile

Effective Stress (-method)

Total Stress (-method)

Presentation Title

9/7/16

Page 1

B1/VM4 vs
Allpile

Kc = B1/VM4 Figure 5), if Ka = 1 is checked


Presentation Title

9/7/16

Page 2

B1/VM4 vs
Allpile

KfTable 2 of B1/VM4)
Presentation Title

9/7/16

Page 3

B1/VM4 vs
Allpile

9/7/16

Page 4

Tension

Compression

Presentation Title

B1/VM4 vs
Pile
Type:
Allpile
Driven Concrete 350 x 350
Area , Ab= 0.1225m2
Length = 10m
Foundation Soil:
Dense SAND
Unit Weight = 20kN/m3
Friction Angle = 40 degrees

Allowable Concrete Stress = 1/3 Concrete Strength


[before it start cracking]
E.g. If Concrete Pile is of G30 i.e. fc = 30MPa
Allowable concrete stress = 1/3 x 30,000 = 10,000kPa

Structural Load Capacity therefore = 10,000kPa x 0.1225m 2


1225kN

Bearing Capacity Factor, Nq for = 40 degrees


Nq based on Allpile = 145
Nq based on B1/VM4 = 175
q = 20 x 10 = 200kPa
Vbu = 200 kN/m2x 145 x 0.1225m2 = 3552 kN
Vbu = 200 kN/m2x 175 x 0.1225m2 = 4287 kN

Fb = 200 x 145 = 29,000 kPa


Fb = 200 x 175 = 35,000 kPa
Presentation Title

9/7/16

Page 5