PREVIOUS
SUCCESSES
OLYMPIAD XXIII - 1984
Projections of Huge Traffic Jams /
Images of Stranded Tourists Missing
Events
Residents Scared into Leaving Town
Los Angeles Praised -Great Planning!
People are
Resilient
AND
Resourceful!
STUDY PURPOSE
To Improve
Mobility
Across California
Caltrans
Mission
8 of 15 of the Most
Congested Cities
are in California
We must get the most
out of the roads we have
before building any new
ones..well, duh!
Construction
Special
Events
Caltrans
commitment is to:
Minimize motorist
delays for ALL
activities on the
State highway
system without
compromising public
or worker safety, or
the quality of the
work being
performed.
Encroachment
Permits
Portable
CMS, FSP, TMT,
Off-peak hours
Minor TMP
(Majority)
Minimal impacts
caused by work
Lane closure
charts required
Some mitigation
measures required
Significant impacts
caused by work
Multiple TMP
strategies
Multiple contracts
Public Awareness
Campaigns, Fixed CMS,
Extended Closures, Moveable
Barriers, COZEEP, Detours,
Reduced Lane Widths,
Website, Helicopter..
ncident Management
C
D
A
onstruction Strategies
emand Management
lternate Routes
Overall Corridor
Public Awareness
Incident Management
Accident Response /
Removal Time,
Pre- / Post- Accident
Rates ..
Measurement of Effectiveness
(Cont.)
Traffic Volume Counts,
Floating Car Runs,
Queue Lengths, Lane
Closures Set / Picked
Up on Time ..
Construction Strategies
Demand Management
Alternate Routes
District 07
I-10 Long-Life Pavement Project
Vehicle Delay
Traffic Volumes
Example of Corridor
Effectiveness Results
Pre-Const. Estimate
= 1,000,000 veh-hrs
Actual Delay
= 16,000 veh-hrs
Traffic Demand on
Interstate 10 was
reduced by 57% (from
112,000 to 56,000 veh)
Length of Queues
Initial Estimate
= 44 miles
Actual Queue Length
= 1.9 miles
Safety
No collisions or
Employee injuries
occurred in the
Work Zone
Project Characteristics
- Fast-setting Hydraulic Concrete
- Closed 2 of 4 Lanes
- Extended 55-Hour Closures
District 07
I-10 Long-Life Pavement Project
Projected
Delay
Actual
Delay
3500
Sat. Sun.
9
7
6
3
2
2
5
2
20
34
3000
2500
2000
1500
1000
TIME
0
4-5 AM
2-3 AM
Mid-1 AM
10-11 PM
8-9 PM
6-7 PM
4-5 PM
2-3 PM
Noon-1 PM
10-11 AM
8-9 AM
6-7 AM
4-5 AM
2-3 AM
Mid-1 AM
10-11 PM
8-9 PM
6-7 PM
4-5 PM
2-3 PM
Noon-1 PM
10-11 AM
8-9 AM
6-7 AM
4-5 AM
2-3 AM
Mid-1 AM
10-11PM
500
(Delay in minutes)
511
But..
WHICH strategies
led to these
Great Results??
MOST EFFECTIVE
STRATEGIES
- PUBLIC AWARENESS
Which way
should we
go today..?
Telecommute ..
Leave Earlier
or Later ..
Instead of saying
Bridge Replacement
Project --...
Improve Your Dr
ive
on the Five!
District 04
Central Freeway Replacement Project
Project Characteristics
- Full-freeway Closure
- On- and Off-Ramps Closed
- Extensive Public Info Campaign
Advance
Awareness
of Central
Freeway
Closure
What
Did the
Public
Notice?
78%
Newspaper Articles
63%
TV News
50%
Freeway Signs
42%
40%
37%
Word of M outh
32%
Fold-Out Brochures
15%
Newspaper Ads
11%
Newsletters
10%
Billboards
7%
One--Page Flyers
6%
Banners
5%
0%
Metro Traffic
511
4%
2%
10%
20%
30%
40%
50%
PercentPercentage
Remembering
60%
70%
80%
90%
Chart No. _
Lane Requirements and Hours of Work
Location:
a.m.
p.m.
FROM HOUR TO HOUR
12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12
Mondays through Thursdays
Fridays
Saturdays
PROBLEMS
- Const. windows reduced
Sundays
Legend:
- Comparative Quality?
Provide at least two adjacent through freeway lanes open in direction of travel
Provide at least three adjacent through freeway lanes open in direction of travel
Provide at least four adjacent through freeway lanes open in direction of travel
Provide at least five adjacent through freeway lanes open in direction of travel
No lane closure permitted; work permitted anywhere that does not require lane closure
- Comparative Safety?
Remarks:
Effective Construction
Strategies (Cont.)
CONSTRUCTION STAGING
MOVEABLE BARRIERS
CONTRAFLOW (Crossovers)
District 08
EXTENDED CLOSURE
I-15 Devore PCCP Reconstruction - Schedule, Cost &
Project Characteristics
Delay Comparison
- Full-Freeway Closed - one direction
- Extended 72-Hour Closures
Construction
Scenario
Schedule
Comparison
Total Closure
Closures Hours
User
Delay
Construction
5.6
10.5
2.1
18.2
Max.
Delay
(Min)
72-Hour
Weekday
512
55-Hour
Weekend
10
550 14.2
12.5
2.6
29.3 196
1 Roadbed
Continuous
400
8.9
1.0
16.8 196
19.1
1.3
25.3
10-Hour
Night-time
6.9
75
36
District 05
Cuesta Grade Project
Project Characteristics
- Addition of NB / SB Truck-Climbing Lanes
- Addition of Eight-foot Shoulders
- Construction of massive Retaining Walls
Effective Strategies
-- Demand Management
313% Increase
Strategy Cost
= $3,300,000
38% increase
29% Increase
Strategy Cost
= $780,000
District 04
Alternate Route Strategies
Central Freeway Replacement Project
(Info obtained by Survey)
City Streets
Only - 11%
No Longer
Made Trip - 3%
Public Transit - 2%
Other - 2%
Freeway /
Transit - 3%
Freeway /
Streets - 2%
Different Freeway
or Ramp Route - 76%
Freeway /
Fewer Trips - 1%
District 11
BENEFITS VS. COSTS??
I-5 / I-805 Widening Project
Bang for the Buck...
Project Characteristics
- Const. Separate Freeway Bypass
- Const. of new Interchange / Auxiliary Lanes
Strategy Cost
P ublic Information
$607,500
M otorist Information
$835,000
I ncident Management
COZEEP Cost = $1,700,000
C
$2,767,000
emand Management
$400,000
lternate Routes
$10,000
onstruction Strategies
---
LESSONS
LEARNED
PUBLIC AWARENESS
Newspapers
TV News Spots
ADVANCE SIGNAGE
PUBLIC
AWARENESS:
MOST Effective
Strategies
facilitate DecisionMaking by Driving
Public to avoid
Work Zone
CONSTRUCTIO
N
Strategies are
also very
effective
OTHER ISSUES
TMP
Cost
RECOMMENDATIONS
STREAMLINE TMP PROCESS
PROPOSED STUDIES
Robert_Copp@dot.ca.gov
HANDOUTS
TMP Process
Relationship between Project
Characteristics and TMP Strategies
Sample Unit Costs for TMP Strategies
TMP Strategies -- Unit cost Info
Sample Worksheet -- Blanket TMP
Sample Delay Calculations
Pub lic
Motorist
Incident
Const.
Demand
Alternate
Characteristic
Information Information Management Strategies Management Routes
Duration
Long
Long
Long
Length
Short
Short
Short
Long
Phasing
x
x
x
x
x
Urbanization
x
(Non-Urbanized)
x
Average Daily Traffic
x
x
x
Reduced Capacity
x
x
x
x
x
x
Viable Alternate Routes
x
x
x
(No Alternate Routes)
x
x
x
Traffic Delay
x
x
x
x
x
x
Public / Media
x
x
x
Political
x
x
x
x
Affected Activity Centers
x
x
x
x
x
Truck Percentage
x
Business Impacts
x
x
x
Increase in Accidents
x
x
x
Steep Inclines
x
x
x
Raised Medians
x
x
x
Public Information
Hiring Consultant to do PR
$250,000+
Mailer (printing)
$0.5-1.0/1,000 Mailers
Mailer (cost to distribute)
$0.34/mailer
Flyers (printing)
$0.1-1.0/1,000
Flyers (cost to distribute by outside company)
$65/1,000
Billboards (+ $1,000 to transfer to vinal)
$2,500/month
Press Release, Flyer, Bulletins (Develop, State Force)
$224
Newspaper Ad (Black and White, 1/4 pg.)
$6,000/day
Newspaper Ad (Black and White, 1/2 pg.)
12,000/day
Newspaper Ad (Black and White, full pg.)
$18,000/day
Newspaper Ad (Color, 1/4 pg.)
$8,000/day
Newspaper Ad (Color, 1/2 pg.)
$14,000/day
Newspaper Ad (Color, full pg.)
$22,000/day
Press Conference/Public Meeting (Depends on Loc'n/Rm Size) $0-1,000/day
Open House
$3,000
Radio Ad (varies greatly)
$800/minute
Telephone Hotline (+$250 Hook-up)
$45/month
TV Commercial (Local Cable)
$4,000+
TV Commercial (Broadcast Channel)
$20,000+
Kiosk Rental (Small)
$1,200/month
Kiosk Rental (Large)
$1,500/month
Motorist Information
Permanent CMS
Portable CMS
Portable CMS (Rental)
Portable Highway Advisory Radio
Highway Advisory Radio (Super)
Ground Mounted Signs
$300,000
$10,000
$350/day, $1,500/week,
$3,500/month
$60,000/unit
$70,000/unit
$300 each
Incident Management
COZEEP/MAZEEP (Two Officers at night)
Freeway Service Patrol (Including admin cost,
contingency and CHP dispatch)
Loop Detector
CCTV
Traffic Management Team (State Force)
Transportation Management Center (State Force)
Helicopter Surveillance
Mobile Command Center (State Furnished)
Web Camera
$1,000/night
$119.07/hr (reg. Time)
$116.45/hr (Over Time)
$300 each
20000 to $200,000
$0
$0
$600/hour
$0
Range between
$20,000 to 200,000
Construction Strategies
K-Rail
Movable Concrete Barrier (Rental)
Movable Concrete Barrier- Transport Machine (Rental)
Gawk Screen (optional)
Temporary Signal
$10-15/lf
$30/lf
$100,000/6 months
$3/lf
$30,000 each
Demand Management
Park & Ride
Ramp Metering
$50/hr
$50,000/location
Alternate Route
Traffic Control Officers
$50/hour
Unit Cost
Comment
PUBLIC INFORMATION
Brochures and Mailers Cost could range between $.40 to $ .50/ brochure Variable depending on the text, graphics and presentation quality
Media Releases
Public Info. Center
Paid Advertising
Visual Information
Telephone Hotline
Installation: This does not include having the actual line installed
into the location).
Additional Lines: Approximately $75.00 each.
MOTORIST INFORMATION
CMS
INCIDENT MANAGEMENT
Traffic Monitoring
Station
Surveillance
Call Boxes
COZEEP
Unit Cost
CONSTRUCTION STRATEGIES
Variable Lanes
Project Phasing
Incentives /
Disincentives
Cost + Time Bidding
Not Available
Owner- Imposed
Physical Restrictions
Not Available
Not Available
Use of OwnerSupplied or Stockpiled
Materials
Not Available
Value Engineering
Incentive
Surveillance
Not Available
Lane/Ramp Closures
Truck Traffic
Restrictions
Total Facility Closure
Unit Cost
Lane-By-Lane Rental
DEMAND MANAGEMENT
Rideshare Incentives
Rideshare Marketing
Unknown.
Transit Service
Improvements
Transit Incentives
High Occupancy
Vehicle Lanes
ALTERNATE ROUTES
Ramp Closure and
Ramp Metering
Street Improvements
Traffic Control
Improvements
TRANSPORTATION
MANAGEMENT PLANS
BLANKET CLOSURE FORM F
District
Route
No. of Lanes Affected
Location Description
Work Description
Initial Date / Time
Expected Duration
County
Postmile(s)
Length of Segment
Restriping
Right-of-Way Fence repair
Electrical maintenance
Driveway construction
Debris / litter removal
Surveying
Graffiti abatement/clean-up
on walls / signs / equipment
cabinets
Landscaping (irrigation /
vegetation control spraying,
mowing)
Utilities placement /
maintenance
FACILITY
Mainline
Auxiliary lane
Median
Shoulder
TYPE OF CLOSURE
Bridge
On-ramp
Off-ramp
Connector
Lane
Full Freeway
Moving
One-way
Various
ADDITIONAL INFORMATION
Did you prepare Lane Closure Charts?
Was Zero delay goal accomplished? (If not, be
sure to specify the expected delay above.)
Are there adjacent Lane Closures in the same corridor?
If Yes, what is the spacing?
Yes
Yes
No
No
Yes
No
RTE
Location:
Operation: Multilane Closure
0.0%
100.0%
4 Lanes
2 Lanes
14000
12000
10000
0
5309
12254
0
3000
6000
Difference
(Veh)
0
2309
6254
Area
(Veh-Hr)
0
1154.5
4281.5
Queue
Length
(mile)
Individual
Delay
(minutes)
0.0
2.7
7.4
46
125
6000
4000
2000
0
8AM
0
5309
6945
Cumulative Cumulative
Demand Capacity
(Veh)
(Veh)
7AM
6 AM
7 AM
8 AM
Demand
(Veh)
8000
6AM
Time
CUM
ULATIVEVEHICLES
Percent Truck:
Percent Passenger Cars:
Number of Lanes Existing:
Number of Lanes Open:
TIME
125 minutes
5,436 veh-hr
$48,924
$4,077
0.0
Demand
Capacity