Академический Документы
Профессиональный Документы
Культура Документы
measurement
Power Transmission
and Distribution
Siemens AG 2006
ZLA
VA
IA
ILoad
RF
VA
ZLB
IB
VB
VB
IA
IB
Seite 2
IA+IB -
IA
UARC/ISC1
ZL1
1 + k0
Siemens
AG 2006
Power Transmission
and Distribution
VA
RL
XL
RL
XL
CL
CL
CL
CL
RF
VA
IB
VB
VB
RL XL CL
are distributed
positive sequence
line resistance,
inductance and
capacitance
VRF
Based on measured positive sequence voltage and current from both line ends, the
positive sequence voltage drop along the line upto the fault location is calculated. At
the fault location the calculated voltages from end A and end B are equal.
Data from both ends are required for the computation.
Seite 3
Siemens
AG 2006
Power Transmission
and Distribution
VA
RF
IB
VB
VA
VB
V(x)
VRF
R X C
are positive
sequence line
resistance,
inductance and
capacitance
per km
V x V A cosh x Z I A sinh x
Seite 4
Propagation
constant
Siemens
AG 2006
Power Transmission
and Distribution
VA
IB
RF
VB
VA
VB
VA(x)
VRF
x, y V A x V B y
VB(y)
The measured
current and
voltage signals at
end A and B are
transmitted via
communication
interface and then
synchronised at
each line end.
ideally : x, y 0
Siemens
AG 2006
Power Transmission
and Distribution
cable
OHL
cable
R X C
IA
Rc Xc
Cc
VA
COHL
RF
VA
V(x)
x
Seite 6
ROHL XOHL
Rc Xc
Cc
line/cable
resistance,
inductance and
capacitance
per km for each
line section must
be set
IB
VB
VB
VRF
Siemens
AG 2006
Power Transmission
and Distribution
d
L1
L2
L3
L2
L1
L3
L2
L3
dA
dA
Non-symmetrical
dA
Symmetrical
Siemens
AG 2006
Power Transmission
and Distribution
Seite 8
Siemens
AG 2006
Power Transmission
and Distribution
VA
IA
ILoad
ZLB
RF
IB
VB
RF = 30 Ohm
ILoad = 300 A (10 between sources)
ZLA = ZLB = 2 + j15 Ohm (fault at 50%)
Line length = 100 km
Seite 9
Siemens
AG 2006
Power Transmission
and Distribution
Seite 10
Single end
measurement from end
B 64%
43%
Single end
measurement
from end A
Siemens
AG 2006
Power Transmission
and Distribution
Measuring error
due to load and
fault resistance is
eliminated
Seite 11
Siemens
AG 2006
Power Transmission
and Distribution
ZLA
ILoad
ZLB
ZM0
ZLP
ZM0 = 15 + j100
ILoad = 300 A (10 between sources)
ZLA = ZLB = 2 + j15 Ohm (fault at 50%)
Line length = 100 km
Seite 12
Siemens
AG 2006
Power Transmission
and Distribution
77%
Single end
measurement
from end B
Fault location
50 km = 50%
Error -9 km
41%
Seite 13
Single end
measurement
from end A
Siemens
AG 2006
Power Transmission
and Distribution
Measuring error
due to zero
sequence mutual
coupling is
eliminated
Seite 14
Siemens
AG 2006
Power Transmission
and Distribution