Security Level:

Internal

Cases and Learning


ATP defects Summary

ISAT JAGUAR
Project

HUAWEI TECHNOLOGIES CO., LTD.

www.huawei.com

HOW IS YOUR SANITY CHECK DONE ?


WDT Issues :
Missing required photos
Wrong photos taken (mismatch photos sequence)
Unclear photos (blur)
Incomplete required information (Site general information, Alarm & Environmental alarm not filled in)
Documents Completion Issues :
WDT not yet uploaded to sharepoint
BOQ, ATF uploaded not yet signed
File uploaded into wrong folder
Uploaded file can not open (file corrupted)

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

RAN Defects
QA Checklist Item :
*All connectors are NOT properly
waterproofed (pvc, butyl, pvc, 2x cable ties*
Number of Defects based on QA activity:
99 cases

Missing RRU bolt

Complete RRU bolts


installed (3 pcs)

QA Checklist Item :
*All bolts, nuts, washers are NOT present and
properly tightened*
Number of Defects based on QA activity:
81 cases
Improper Connector
waterproofing

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Waterproofing installed
properly

RAN Defects
QA Checklist Item :
*Grounding kit for hybrid cable (yellow-green)
are NOT installed (Applicable for RFS type
only)*
Number of Defects based on QA activity:
76 cases
Cable shoes not yet
installed

Cable shoes installed and cable


connection are tightened

QA Checklist Item :
*DC power cable connection from RRUs are
NOT done properly*
Number of Defects based on QA activity:
65 cases
Waterproofing on hybrid cable
grounding kit not yet installed

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Cable shoes installed and cable


connection are tightened

RAN Defects

QA Checklist Item :
*All RAN modules and replacble units dont
have Indosat barcodes *
Number of Defects based on QA activity :
56 cases
Alarm labels on DDF not tidy

Alarm labels are tidy installed

QA Checklist Item :
*All alarms on DDF are not labeled according
to the Indosat standard*
Number of Defects based on QA activity :
56 cases

Indosat barcodes not yet


installed

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Indosat barcodes installed


properly

RAN Defects
QA Checklist Item :
*Feeder/Hybrid cables are NOT supported
every 1m with clamps that are properly
tightened*
Number of Defects based on QA activity :
54 cases
Hybrid jumper cable not routed
properly (untidy)

Alarm labels are tidy installed

QA Checklist Item :
*Hybrid cables are not installed neatly and
straight on the horizontal and vertical tray*
Number of Defects based on QA activity :
54 cases

Routing jJumper cable not


properly clamped

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Clamp already installed

RAN Defects

Flat washer not yet installed

Flat washer already installed


Hybrid cable not yet clamped

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Hybrid clamped already installed

RAN Defects

Required 2 hybrid clamp installed

2 clamps installed on hybrid


routing through antenna bracket
arm

HUAWEI TECHNOLOGIES CO., LTD.

Hybrid grounding kit should installed


before FEP of shelter site

Huawei Confidential

Already rectified and move to


outside shelter before FEP

Mini CME Defects


QA Checklist Item :
*Busbar is available*
Number of Defects based on QA activity :
4 cases

Busbar on tower NOT


connected to the main site
earth

Busbar connected o the main


site earth

QA Checklist Item :
*Busbar on tower NOT integrated to the main
site earth*
Number of Defects based on QA activity :
8 cases
HUAWEI TECHNOLOGIES CO., LTD.

Busbar on tower are not


available

Huawei Confidential

Busbar installed

Mini CME Defects

Proposed new MCB based


on SID not yet installed

BOQ not yet signed

Signed BOQ

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

10

New MCB installed as


proposed in SID

Mini CME Defects


QA Checklist Item :
*Busbar is available*
Number of Defects based on QA activity :
4 cases

Busbar on tower NOT


connected to the main site
earth

Busbar connected o the main


site earth

QA Checklist Item :
*Busbar on tower NOT integrated to the main
site earth*
Number of Defects based on QA activity :
8 cases
HUAWEI TECHNOLOGIES CO., LTD.

Busbar on tower are not


available

Huawei Confidential

Busbar installed

11

Power Supply Defects

Dummy gland not available

Dummy gland already


installed.

PS ATP Form not yet signed

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

12

Power Supply Defects

Battery cover must be open


**photo sequence
requirement*

Rectifier module should


maximum pulled out 35cm
**photo sequence
requirement*

Battery cover already open and


able to identify on battery
connection, greased or not..etc

Module has maximum pulled


out 35cm and use
measurement tape

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

13

Power Supply Defects

Required torque wrench for


battery connection
assessment

Power cable should be


separated from grounding
cable

Torque wrench available


during ATP power conducted

Separate routing cable of


power and grounding cable

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

14

Power Supply Defects

Battery barcodes not yet


installed
Anchor bolt not properly
installed

Battery barcodes installed

All anchor bolts properly


installed and tightened.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

15

TRM Part

Category 1: ODU and IF cable grounding

Category 2: cable routing and clamping

Category 3: Labeling

Category 4: Document completeness

Category 5: DDF installation

Category 6: Waterproofing

Category 7: Others

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

16

Category 1 ODU and IF cable groundi


ng

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

17

5.3.2 ODU is grounded to the nearest d


own bus-bar

ISAT comment: ODU


grounded to tower ,
should be nearest down
bus-bar.

HUAWEI TECHNOLOGIES CO., LTD.

Standard of ISAT : ODU


should grounded to the
nearest down bus-bar.

Huawei Confidential

18

3.4.6 Grounding bar in plinth base is install


ed correctly

Grounding Reting
Coaxial Instal Tidak
standar ( Jgn Di
jepit Pake C Clam,)
HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

19

3.4.5 Is terminated using heat-shrink (n


ot electrical tape)

Grounding Odu Tidak Memakai Heat Shrink

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

20

3.4.5 Is terminated using heat-shrink (n


ot electrical tape)

Grounding ODU ke isolator


HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

21

3.4.6 Grounding bar in plinth base is install


ed correctly

Grounding Kit connect to Vertical


Busbar sebelum dirapikan

HUAWEI TECHNOLOGIES CO., LTD.

Yellow/Green Cable
Grounding ODU
Connect to Busbar
Huawei Confidential
Vertical Middle
22

5.3.2 ODU is grounded to the nearest d


own busbar

rounding ODU Instal tidak kencang Dan Tidak pake heatstring


HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

23

5.3.2 ODU is grounded to the nearest dow


n busbar

Install Black Cable As


Grounding ODU
Install
Yellow/Green Cable As
Grounding ODU
HUAWEI TECHNOLOGIES CO., LTD.

Install Yellow/Green Cable As Grounding O

Huawei Confidential

24

Category 2 cable routing and clampi


ng

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

25

5.3.10 Flexible waveguide cable is instal


led properly (weaterproof and fixed)

Cable Waveguide Fleksibel tidak di pasnag clam

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

26

5.3.6 Coaxial cable properly clamped on the cable tray

ISAT comment: Not Yet


Install Clamp Cable Coaxial
Horizontal Standard Indosat.
HUAWEI TECHNOLOGIES CO., LTD.

Standard of ISAT : 3 Screws


Residue Clamp Cable Coaxial
Horizontal Standard Indosat

Huawei Confidential

27

5.3.6 Coaxial cable properly clamped on


the cable tray

Clamp Coax di Horizontal Tray harus tersisa 3 derat

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

28

5.3.6 Coaxial cable properly clamped on


the cable tray

seluruh clamp
Clam di tray horizontal belum disisakan
3 drat horizontal tray sudah di sisak

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

29

5.3.6 Coaxial cable properly clamped on


the cable tray

nstalasi Clamp pada trey horizontal tidak standart

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

30

5.3.6 Coaxial cable properly clamped on


the cable tray

Coax belum di clam

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

31

5.3.6 Coaxial cable properly clamped on the cable tray


5.3.7 Power, transmission, Groundiing cables via separ
ate glands

Jalur Coax & Grounding Tidak


Pasang Clam & Tidak boleh di
satukan
HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

32

5.3.6 Coaxial cable properly clamped on


the cable tray

Laying Coaxial tidak di clampLaying Coaxial Kabel sudah di clamp

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

33

5.3.6 Coaxial cable properly clamped on


the cable tray
5.3.7 Power, trans
mission, Groundiing cables via separat
e glands

Posisi spare coax salah dan


di ties di bracket

HUAWEI TECHNOLOGIES CO., LTD.

posisi spare coax sudah di


bawah bracket bawah dan di
ties ke Leg tower

Huawei Confidential

34

5.3.7 Power, transmission, Groundiing cabl


es via separate glands

Coaxial Cable & Grounding tidak di


clam & Dan jangan di satukan.
HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

35

Category 3 : labeling

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

36

label issue 1 -IDU power cable label shoul


d be clear and neat.

Cable Power To IDU tidak pake scun & Labeling

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

37

label issue 2-IDU grounding cable label sh


ould be clear and neat.

Labeling Grounding AMM Tidak terpasang

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

38

label issue 3-MCB label should be clear an


d neat.

Labeling MW di MCB masih Temporary

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

39

Label issue 4-ODU grounding cable and


IF cable should be correctly labeled.

Cable Coax Tidak Ada labeling

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

40

Label issue 4-ODU grounding cable and


IF cable should be correctly labeled (co
ntinue).

Kabel Coex Tidak ada label di Inlet Belakang Cabinet

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

41

Label issue 4-ODU grounding cable and


IF cable should be correctly labeled (co
ntinue).

Standard of ISAT : At cable


entry window, IF cable should
be labeled both inlet and
Huawei Confidential
42
outlet.

ISAT comment: No label of IF


cable .
HUAWEI TECHNOLOGIES CO., LTD.

Label issue 5- IF cable connection to IF


board should be correctly labeled

ISAT comment: No label of IF


connector at IDU.
HUAWEI TECHNOLOGIES CO., LTD.

Standard of ISAT : IF
connector at IDU should carry
labels.

Huawei Confidential

43

Category 4 Document completeness

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

44

2.7.7 ATF Asset Transfer form

ISAT comment: Did not


Standard of ISAT : submit ATF excel
submit ATF PDF
file and ATF PDF scanning copy (with
scanning copy with data
date/ signature ) .
Note:
ATF excel file is ready, can send ATP doc review invitation,
andIfsignature.
but region need to submit ATF PDF scanning copy sooner.
HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

45

2.2.1 SID Document Completed

ISAT comment : no SID PDF


scanning copy (with date/
signature ) .
HUAWEI TECHNOLOGIES CO., LTD.

Standard of ISAT : submit SID


original and SID PDF scanning
copy (with date/ signature ) .

Huawei Confidential

46

Category 5: DDF installation

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

47

5.1.7 DDF installed correctly

Labeling DDF tidak ada

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

48

5.1.7 DDF installed correctly

stalasi DDF Di Indoor Tidak Sesuai Standar


HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

49

Category 6: Waterproofing

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

50

5.3.8 Weatherproof of coaxial cable conne


ction to ODU is done properly

Waterproofing tipis
HUAWEI TECHNOLOGIES CO., LTD.

Waterproofing setelah ditebalkan


Huawei Confidential

51

5.3.8 Weatherproof of coaxial cable conne


ction to ODU is done properly

Waterproofing tipis
HUAWEI TECHNOLOGIES CO., LTD.

Waterproofing setelah ditebalkan


Huawei Confidential

52

Category 7: others

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

53

5.2.4 Antenna support/bracket installed


properly

ISAT comment:
Mounting brackets
antenna support is not
strong.
HUAWEI
TECHNOLOGIES CO., LTD.

Standard of ISAT : Screws should be


tightly fixed to ensure the bracket is
fastened securitly.
Huawei Confidential

54

Photo issue: photo must view GND kit c


oaxial cable on tower

photo must view gnd kit coaxial


cable on tower
HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

55

3.6.1 All Transmission modules & replacea


ble units have Indosat bar-codes

no barcode

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

56