BALCO RAILWAY Project

OHE WORKS

OHE
Major Activity

UOM

Qty

Dec'14 Jan'15 Feb'15

Foundation

Nos

176

75

101

Mast erection
Bracket
erection

Nos

183

100

83

Nos

342

120

222

Wiring

TKM

34.5

16

Power Block
Hours
Capacitor Bank
(CB, PT, CT,
etc) and BayTSS
Sets
CR Panel &
SCADA
LS
modificationTSS
Battery bank &
RTU- SSP
Testing &
Commissioning
SSP

34.5

LS

LS

Remarks
Bed and track alignment
required for approx 100
foundations.

12.5
34.5

2
1

Mar'1
5

2
1

Providing drawing approval


from railway and material
procurement.
Providing drawing approval
from railway, material
procurement & building
modification.
Not required in stage 2but
depends upon Railways
discretion.
Not required in stage 2but
depends upon Railways
discretion

OHE
Other Activities-

1.
2.
3.
4.
5.

Pending Works in SSP- OFC Cable laying.


TSS building modification due to space constraint.
Erection of Bridge Mast.
Construction of Depot Building (BALCOs Decision).
Overhead Structure (FOBS, Pipelines) Modification (BALCOs
Decision).
6. Tree Trimming
7. AT erection.
8. Bonding & Earthing.

OHE
Major Material Required1. Complete Capacitor Bank items (PT, CT, CB, SR, steel str., sps,
cables, C&R panel of Cap Bank, LA, etc).
2. OHE & PSI Spares items for Railway.
3. Auxiliary Transformers(10KVA)-3 Nos including CLS Panel, LV
Box, D/o Fuse and Cable(2x70 sq mm).
4. Galvanised mast (Bridge & AT)
5. Cu Jumper wire (150 sq mm & 160 sq mm)
6. Large Span Wires (130 sq mm)
7. 40x6 MS Flat for Bonds
8. Number Plates & Caution Boards for OHE, TSS, SSP, Feeder.
9. 6 Core Optical Fibre Cable 7000 mtr (for SSP RTU)
10.C&R Panel for TSS
11.Data logger cards for RTU at TSS
12.Insulated Catenary

OHE
P& M Required
1. Wiring Trolley
2. Ladder trolley
3. Tirfor/ hook-chook(1.5T/2T), Pull-lift (0.75T, 1.5T), Misc tools.
4. Aluminium Ladder
5. Bench Drilling Machine
6. Cutting Machine.
7. Rail hole Drilling Machine for Bonding
8. Dropper making Zig
9. Pick Up van for material shifting inside & outside plant
Note: For Sl No 3 to 8- Required in case sub-contractor engaged without T&P.
Input Required
A. Internal10. Dedicated store supervisor for new inside plant store for counting, stacking, handling,
issue of OHE materials.
11. Finalization of OHE foundation contractor.
12. Finalization of OHE electrical contractor.
13. OHE foundation fitters during foundation works.
14. OHE fitters during OHE execution works.
B. Client15. OHE expert/ consultant for supervision and certification of OHE works.
16. Track lowering drawing approval from Railway.
17. EHT approval from railways for EIG.

GE

Balance Works:
1. 2 Nos of High mast Erection with necessary cabling
2. Wiring at Goomty
3. Rectification work at cabins & goomties
Major Materials Required:
4. No major material (Tube lights, Fans, etc as required)
P& M Required:
Nil
Target date of Completion:
15th Feb 2015
Input Required:
A. Client:
1. Final handover of GE Items

OHE & GE
Cost Booking
OHE Execution
TSS & Feeder
SSP
Supply & Execution Capacitor
Bank-equipments & Structure
Construction of Depot Building

Dec'14

Jan'15

650,000.00 500,000.00

OHE Materials

Invoicing
Stringing of OHE Items for Rail
Network - 10KM
Supply of Series Reactor
Supply of CT,AT & NFP Relays
Supply of Other accessories like
Busbar,Cable,Earth Strip etc
Supply of building material for
Depot Building construction
Supply of OHE Tools &
Equipments and spares
Supply of Capacitor Bank
Supply of career communication
system
Supply of GE Spares
Erection of Series
Reactor,CT,PT ,Isolator

1,000,000.00

1,500,000.00
525000.00

2,500,000.00

1,500,000.00
2,000,000.00

Supply of OHE Spares


GE Works

Feb'15

7,000,000.00
180,000.00 100,000.00

2,50,000.00

1,000,000.00

1,000,000.00

Dec'14

Jan'15

Feb'15

Mar'15

Remarks

1,000,000.00 Approx cost for OHE works.

Supply of C&R panel(SCM)


Supply of OFC Cable(SCM)
Depend Upon Drawing Approval
3,450,000.00 from railways,Support of SCM
2,000,000.00 Figures are tentative based on
Final Approval Required from
8,000,000.00
BALCO & railways

Jumper, Flat, Insulated cat.,


number plates, etc.

2,804,625.00
3,684,100.00
3,684,100.00

1,662,000.00

Mar'15
2,804,625.00

Remarks
SCM
SCM

921,025.00

SCM
Approval from BALCO &
7,202,000.00 Railways
Approval from BALCO &
8,587,000.00 Railways
4,570,500.00 SCM
SCM
921,025.00
3,157,800.00

Вам также может понравиться