Академический Документы
Профессиональный Документы
Культура Документы
Index:
1.General Information about Romania
2.Memory of the Project:
2.1 General Information
2.2 Environmental Considerations
3.Legal Procedures
4.Cement Plant Equipment
5.Buget
Neighbours:
Ukraine (N & E)
Bulgaria (n S)
Serbia (S-V)
Hungary (N-V)
Membership:
European Union (2007), NATO (2004), United Nations (1995), WTO (1995), OSCE (1973) and more
Area : 238,391 km2 (83rd in the world)
Capital and largest city : Bucharest
Official language : Romanian
Population : 20,121,641 (58th)
GDP(nominal) :124,67 Billion (Spains Pib : 989 Billion)
GDP per Capita : 5886 (Spains Pib per capita: 22 000)
Official Currency : Romanian Leu (RON)
Properties of Cement.
Ingredient
%age
Effect
Lime (CaO)
60-65
Sillica (SiO2)
20-25
4-8
2-4
Magnesium Oxide
(MgO)
1-3
Na2 O
0.1-0.5
Controls residues,
excess causes cracking
2.2 Environmental
Considerations
A cement plant will always
-Own laboratories.
-An independent laboratory accredited
by competent institution.
Indicator
Unit
Best EU values
kg/t clincker
0.01 - 0.4
kg/t clincker
< 0.4 - 6
kg/t clincker
< 0.02 - 7
kg/t clincker
1-4
3. Legal Procedures
Operation of a cement
Ancillary equipment:
Preheaters
Cooler
Fuel mills
Fans
Exhaust gas cleaning equipment
Elevator
Devices
Electrostatic Precipitator (ESP)
- ESP control devices ionize
contaminated air flowing between
the electrodes.
Baghouse Filters
In these control devices,polluted
air is filtered through the bags.The
bags are closed at the bottom,and
are exposed to a clean air chamber
at the top.The bags are cleaned by
short bursts of pressured air.The
bags contracts and snaps which
releases the particulate layer.
Hoopers
Materials are discharged in discharging area with crab. Feeding
mouth of discharging area and crab block the dust cloud, so air
flow gets into dust collection area through dust bar grid, with
collected dust recycled in material flow, therefore good working
environment can be created.
Transport
In cement plants we use special trucks.
We need about 35 trucks in order to avoid congestions.
This calculation is made on an estimating cement production of 5300
tones per day . (aproximative 2 milion tones per year ).
5.Buget
Our estimated buget will be around 250
million .
We will have around 750 employees.
35 trucks