KBR STANDARD PROJECT

IPMS CHAINS
CIVIL

Chain E-KGEN: Civil General Activities

DD-STP

100%

DD-CMP

General
Activity

CPM CHAIN

DD-CMP

DD-STP
0%

100%

General
Activity

IPMS CHAIN

Work Package Sub Types: CV1


MILESTONES:
DD-STP
DD-CMP

Start Activities
Complete Activities

Document Sub Types: CV13, CV14

Chain P-BOS:
Procurement (Acquisition) Chain
Blanket Order Bulks or Subcontracts
DD-STT DD-RFQ
30%
Issue
ERW

DD-RFQ

0%

FQ-ISS

FQ-ISS

Evaluate Bids /
Make
Recommendation

Issue
RFQ

CPM
CHAIN

IPMS
CHAIN

DD-STT
0%
DD-RFQ
30%
Issue
ERW, RFS
or MTO
5d

MILESTONES:
DD-STT
DD-RFQ
RF-ISS
FQ-ISS
FQ-BID
FQ-TEC
FQ-REC
DD-FCR
AW-ISS

DD-RFQ
30%
RF-ISS
30%
PREP &
ISSUE
RFQW
5d

FQ-REC

70%

RF-ISS
30%
FQ-ISS
30%

FQ-ISS
30%
FQ-BID
30%

PREP &
ISSUE
RFQ
2d

SUPPLIER
PREPARE
BIDS
10d

FQ-BID
30%

FQ-TEC
100%

Technical
Evaluation
10d

Start ERW, RFS or MTO Assembly


Issue ERW, RFS, or MTO
Issue RFQW
RFQ (Inquiry) Issued
Bids Return
Eng Tech Review Complete
Recommend Issue
Client Approval
Award Issue External

FQ-REC

AW-ISS
0%

Issue Formal Award


(Blanket or Subcontract)

FQ-TEC
100%
FQ-REC
100%
EVAL BIDS
& ISSUE
RECOMEN
2d

FQ-REC
100%
DD-FCR
100%
CLIENT
APPROVE
10d

DD-FCR
100%
AW-ISS
100%
ISSUE
Formal
AWARD
2d

Work Package Sub Types: CV1, G80


Document Sub Types: CV12, CVG83

NOTES:
1. Percentages shown are for Engineering Progress Only.
2. Dotted boxes represent Procurement (non-Engineering) responsibilities only.

Chain D-KUPL: U/G Plant Layout Study

DD-STT

CPM CHAIN

DD-STT
5%

IPMS CHAIN

DD-LLC

DD-IFD
20%

Prepare Underground Layout Drawings

Client Review and


Comment
and Issue for Design

DD-DCL
20%

Prepare Design
Calculation
& Sketch
Duration_15_

MILESTONES:
DD-STT
DD-DCL
DD-DST
DD-HLC
DD-SLL
DD-LLC
DD-IFR
DD-IFD

DD-IFR

80%

DD-DST
20%

DD-HLC
50%

DD-SLL
50%

DD-LLC
80%

Layout
Main
Routes

Layout
Secondary
Routes

Duration_15_

Duration_25_

Start Document
Design Calculation & Sketch Completed
Drawing Started
Header Layout Completed
Start Lateral Layout
Lateral Layout Completed
Layout Issued for Review/Comment
Comments Incorporated and Issued for Design

DD-IFR
80%

DD-IFD
100%

Client Review
and Comment
and Issue for Design

ICR

IFD
Duration_20_

Work Package Sub Types: CV2


Document Sub Types: CV23

Chain D-KSGR: Site Preparation & Finish Grading

100%

DD-DBS

CPM
CHAIN

Complete Design and Issue Drawing for Construction

DD-DBS
5%

IPMS
CHAIN

DD-DBC
10%

Prepare
Drawing
Background
Duration_10_

MILESTONES:
DD-DBS
DD-DBC
DD-SFD
DD-CFD
DD-STT
DD-DRC
DD-DCS
DD-FFC

DD-FFC

DD-SFD
10%

DD-CFD
55%

Finalize
Design
Duration_15_

Drawing Background Started (Define scope of work)


Drawing Background Completed
Start Final Design
Design Finalized (Design and mark-up on background drawing completed)
(Plant Layout Release Model completed for Site Prep Only)
Start Incorporating Drawing Mark-Ups
Drawing Ready for Check
Start Drawing Check
Drawing Checked & Issued for Construction

DD-STT
55%

DD-DRC
85%

Prepare
Drawing
Duration_25_

DD-DCS
85%

DD-FFC
100%

Check and
Issue Drawing for
Construction

IFC
Duration_20_

Work Package Sub Types: CV2


Document Sub Types: CV21, CV22. CV24

Chain D-KDEL: Engineering Deliverable

100%

DD-STT

CPM
CHAIN

DD-ICM

Prepare & Issue Deliverable

DD-STT

DD-PRC

10%

IPMS
CHAIN

75%

Prepare
Duration_15_

MILESTONES:
DD-STT
DD-PRC
DD-IST
DD-ICM

Start Document
Complete Prep
Start Document Issue
Complete Issue

DD-IST

DD-ICM

75%

100%

Finalize & Issue


Duration_5_
Work Package Sub Types: CV3
Document Sub Types: CV39

Chain M-KFCF: Foundations and Concrete Structures

MD-BST

MD-BCM
35%

CPM
CHAIN

Plant Layout
Release
Model
MD-BST
0%

IPMS
CHAIN

MD-BCM
35%

Plant Layout
Release
Model
Duration_10_

MILESTONES:
MD-BST
MD-BCM
MD-CST
MD-CCM
DD-STT
DD-DRC
DD-DCS
DD-FFC

MDCST

MD-CCM

DD-STT

25%

40%

IFC
Model

MDCST
35%

DD-FFC

MD-CCM
60%

Prepare, Check and Issue


Drawing for Construction

DD-STT
60%

DD-DRC
85%

DD-FFC

DD-DCS

100%

85%

IFC
Model

Prepare
Drawing

Check and
Issue Drawing for
Construction

Duration_5_

Duration_5_

Duration_5_

Start Plant Layout Release Model


Plant Layout Release Model Completed (Primary member/foundation calculation finalized)
Start IFC Model
Complete IFC Model (Member/foundation detail and MTO finalized)
Start Drawing
Drawing Ready for Check
Drawing Check Started
Drawing checked & Issued for Construction

IFC

Work Package Sub Types: CV3


Document Sub Types: CV31, CV32, CV33,
CV34, CV35, CV36, CV37, CV38

Chain M-KSST: Structural Steel - Yardracks &


Structures & Buildings
MD-BST
30%

CPM
CHAIN

MILESTONES:
MD-BST
MD-BCM
DD-STT
DD-DRC
DD-DCS
DD-FFC

DD-STT

DD-DRC

MD-BST

DD-STT

30%

Plant Layout
Release
Model
Duration_15_

30%

DD-FFC
15%

Finalize Design
& Prepare
Drawing

MD-BCM

DD-DCS

55%

Plant Layout
Release
Model

0%

IPMS
CHAIN

MDBCM

DD-DRC
85%

Finalize Design
& Prepare
Drawing

Complete IFC Model and Drawing


Check and Issue Drawing for
Construction

DD-DCS

DD-FFC

85%

100%

Complete IFC Model and Drawing


Check and Issue Drawing for
Construction

Duration_20_

Start Plant Layout Release Model


Plant Layout Release Model Completed (Primary and secondary members designed - not
checked. Ready for Piping Plant Layout Release.)
Start Drawing (start IFC drawing extraction)
Drawing Ready for Check
Drawing Check Started
IFC Model completed and Drawing checked and Issued for Construction

Duration_15_

IFC

Work Package Sub Types: CV4


Document Sub Types: CV41, CV42, CV43