VIADUCT
3.
FUNCTIONAL / INETRFACE
4. TYPICAL VIADUCT
FUNCTIONAL
FUNCTIONAL
2. Drainage
Longitudinal
Vertical Pipes
Electrical
OHE AC system
Third Rail DC system
Refuse space
2.
VIADUCT
CONTENTS
1. Superstructure
2. Substructure
3. Construction Method
4. Comparison for Alternatives
Superstructure
U - Pretensioned
Single U Post Tensioned
Box Post tensioned
Multi I Girders Pre / Post
tensioned I Girder with RCC Deck
Slab
Page 13
Superstructure
Girders Steel I
Girder with RCC Deck Slab
Composite Box Steel Box
with RCC Deck Slab
Page 14
Page 15
Page 16
Page 17
Double U :
Manufactured at Casting
Yard
Full span Transportation,
Lifting
and
Launching
in
Position
Page 19
Page 20
Title
Page 21
Shanghai Line 4
Superstructure
Single / Big U :
Transportation,
Lifting and Launching in Position
Post-Tensioning and Grouting at
site
Page 25
Page 26
Title
Page 27
Box :
Transportation,
Lifting and Launching in Position
Post-Tensioning and Grouting at
site
Page 29
Page 30
Title
Page 31
Page 32
Page 33
Superstructure
I Girder :
Transportation,
Lifting
and
Launching
in
Position
RCC Deck slab cast in situ
Page 34
Superstructure
Page 35
Page 36
CC-15/DMRC Project
Supported
Simply
supported
with
Extended Pier cap for medium
spans
Continuous
structures
at
Track crossing locations
Page 37
Page 38
Page 39
Title
Page 40
6.
Larger Span - Superstructure
Cantilever
Extradosed
Steel Truss
Page 42
Page 43
Title
Page 44
CC-15/DMRC Project
Page 45
CC-15/DMRC Project
Page 46
Title
Page 47
Title
Page 49
Page 50
5.
SUBSTRUCTURE
FARIDABAD PROJECT/DMRC
Page 52
Page 53
Page 54
Page 55
Portal Pier
Page 56
4.
Construction Method
1. Steel cage prepared for entire span2. Steel cage placed in the mold
Page 58
Page 59
4. Concrete pouring
5. Demolding
Page 60
Dubai LRT
Dubai LRT
Page 68
Page 69
Page 70
Page 71
Page 72
Page 73
Page 74
Page 77
Vertical Clearance
.while keeping same vertical
clearance.
Page 78
Page 79
Page 80
Page 81
Visual Impact
Page 82
Page 83
A noise barrier
An anti-derailment wall
A walkway on its top part
Reducing height of stations
A support for cable trough or
guide rail
Double U:
Single U:
Page 84
Page 85
Comparison
Item
Double
U
Single U
Box Girder
I-Girder
Constructability Aspect
Page 86
Casting
Full Span
Pretension
Segment by
Segment,
Additional Pre
stressing
operation
Segment by
Segment,
Additional
Prestressing
operation
I-Girder Precast
& Cast In Situ
Deck Slab,
Additional
shuttering for
Deck Slab
Casting
Transportati
on
Big Trailer
Required,
Approx.
9.0m Road
width is
required
Small Trailer
Required
Small Trailer
Required
Big Trailer
Required,
Difficult in Busy
Area
Erection
Equipments
Cranes
Launching
Girder
Launching
Girder
Cranes
Erection
Suitability
Always Front
Available
Always
Erection in
sequence
Always Erection
in sequence
Always Front
Available
Erection
Time
Can Erect in
few hours
Minimum 3
Days
Minimum 3 Days
Girder can be
erect in few
Item
Page 87
Double Single U
U
viaduct
viaduct
14
30
Box Multiple
Girder I-Girder
viaduct viaduct
35
40
Comparison
Item
Double U
Single U
Box Girder
I-Girder
Max. 30m, in
special cases up
to 48m with
Extended Pier
Cap
Max. 35m
Max. 37m
Max 37m
Parapet &
Walk Way
In Built
In Built
Additional
Additional
Suitability
Straight Reach
& Curve 200m
Radius
Aesthetics
Pleasant, Sleek
& slender
appearance
Pier Cap
Precast PSC
Precast PSC or
Cast In Situ RCC
Cost
Economical
Economical
Costlier
Costlier
Page 88
Page 90
1. Temperature
variation
2. Deck
end
rotations
CHECKS TO PERFORM
RAIL STRESSES:
< 92 MPa tension
< 92 MPa compression (slab track)
< 72 MPa compression (ballast)
LONGITUDINAL DISPLACEMENT UNDER BRAKING-ACCELERATION
LOADS:
- differential displacement between adjacent decks
< 5 mm if no rail expansion joints
< 30 mm if rail expansion joints at both ends
- differential displacement between rail and deck
< 4 mm
MAXIMUM LENGTHS
FASTENERS BEHAVIOUR