FUNCTIONAL

1. Clear Dimensions to accommodate Track Gauge /


and Coach width

In Straight Part : R >1000 m


In curved Part
Track Crossing Locations
In stations

2. Minimum clear distance between Door and Evacuation


Platform

In Emergency situation Fire, System Breakdown,


Earthquake, derailment etc.

FUNCTIONAL

1. Longitudinal Vertical Profile

For Operational Efficiency summit at station and valley


between stations
For Drainage
Flat at Track Crossing Locations
Flat in stations

2. Drainage

Longitudinal
Vertical Pipes

Electrical

1. Traction / Power supply to Coaches

OHE AC system
Third Rail DC system

2. Electrical Cable support along Viaduct

Power cables from Electrical Substation to Metro stations /


Depot

3. Earthing / Cathode protection

Earthing Bars all along Viaduct , through structures

Signalling and Telecommunication

1. S & T Cables support along Vaiduct

S & T Cables through Viaduct to Metro stations / Depot

Refuse space

1. For passengers falling or trapped between Rolling stock


( Coach wheels) and any obstruction

600 mm clear space between wheel and any object

2.
VIADUCT

CONTENTS

1. Superstructure
2. Substructure
3. Construction Method
4. Comparison for Alternatives

Superstructure

POPULAR CROSS SECTION TYPES in


Concrete :
Double

U - Pretensioned
Single U Post Tensioned
Box Post tensioned
Multi I Girders Pre / Post
tensioned I Girder with RCC Deck
Slab
Page 13

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Superstructure

POPULAR CROSS SECTION TYPES in


steel for medium span :
Composite

Girders Steel I
Girder with RCC Deck Slab
Composite Box Steel Box
with RCC Deck Slab
Page 14

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Double U Shaped Viaduct

Page 15

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Double U Shaped Viaduct

Page 16

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Double U Shaped Viaduct

Delhi Airport Link Twin U Shaped Viaduct


- 25m Span

Page 17

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Double U Shaped Viaduct

Faridabad Line -6 Twin U Shaped Viaduct


- 27m Span
Page 18

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Alternatives & Concept Design - Superstructure

Double U :

Full span Pretensioned

Manufactured at Casting
Yard
Full span Transportation,
Lifting
and
Launching
in
Position

Page 19

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Page 20

Title

Single U - Shaped Viaduct

Page 21

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Single U - Shaped Viaduct

Santiago Line 4 Single U- Shaped


Viaduct
Page 22

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Single U - Shaped Viaduct

Delhi Metro Line 3 Single UShaped Viaduct


Page 23

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Shanghai Line 4

Superstructure

Single / Big U :

Pre cast RCC Segments


Manufactured at Casting Yard
Segments

Transportation,
Lifting and Launching in Position
Post-Tensioning and Grouting at
site

Page 25

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Page 26

Title

Box Shaped Viaduct

Page 27

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Box Shaped Viaduct

Delhi Metro Line 8 Box - Shaped


Viaduct
Page 28

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Alternatives & Concept Design - Superstructure

Box :

Pre cast RCC Segments


Manufactured at Casting Yard
Segments

Transportation,
Lifting and Launching in Position
Post-Tensioning and Grouting at
site

Page 29

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Page 30

Title

Multiple I Girders Shaped Viaduct

Page 31

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Multiple I Girders Shaped Viaduct

Page 32

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Multiple I Girders Shaped Viaduct

Page 33

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Superstructure

I Girder :

Full span Pre cast PSC I Girders


Manufactured at Casting Yard
Segments

Transportation,
Lifting
and
Launching
in
Position
RCC Deck slab cast in situ

Page 34

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Superstructure

Steel I Girder / Box Composite :

Pre Fabricated Steel I Girder /


Box
Manufactured at Fabrication Yard
Major Elements Transportation,
Lifting
,
Launching
and
assembling in Position
RCC Deck slab cast in situ

Page 35

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

STEEL COMPOSITE BRIDGE ( 48.0m SPAN)

Page 36

CC-15/DMRC Project

Alternatives & Concept Design - Superstructure

POPULAR LONGITUDINAL TYPES :


Simply

Supported
Simply
supported
with
Extended Pier cap for medium
spans
Continuous
structures
at
Track crossing locations
Page 37

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Extended Pier Cap

Page 38

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Page 39

Title

Extended Pier Cap 9.0m Cantilever

Page 40

VAG Corridor Project /MMOPL- India

6.
Larger Span - Superstructure

Alternatives & Concept Design - Superstructure

Larger Span Popular Solutions :


Balanced

Cantilever
Extradosed
Steel Truss

Page 42

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Page 43

Title

BALANCE CANTILEVER BRIDGE (47+72+47, R=300m

Page 44

CC-15/DMRC Project

BALANCE CANTILEVER BRIDGE (47+72+47, R=300m

Page 45

CC-15/DMRC Project

Page 46

Title

Page 47

Title

MUMBAI METRO (INDIA)

Large Span structures

Page 49

Large Span structures

Page 50

5.
SUBSTRUCTURE

FARIDABAD PROJECT/DMRC

Page 52

Faridabad Project DMRC

Standard Pier & Precast Pier Cap for Double U

Page 53

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Standard Pier & Precast Pier Cap for Double U

Page 54

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Substructure for Box-Shaped Viaduct

Page 55

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Portal Pier

Page 56

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

4.
Construction Method

Construction method for Double U-Shaped viaducts


Steel cage preparation

1. Steel cage prepared for entire span2. Steel cage placed in the mold

Page 58

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Construction method for Double U-Shaped viaducts

Full span Precasting

3. Prestressing of pretension cables

Page 59

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

4. Concrete pouring

Construction method for Double U-Shaped viaducts


Full Span Precasting

5. Demolding

Page 60

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

6. Storage of precast spans

Construction method for Double U-Shaped viaducts


Full Span Transport

7. Loading and transport by typical Multi Axle


Trailers
Page 61

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Delhi Airport Line

Delhi Airport Line

Delhi Metro Line 3

Dubai LRT

Dubai LRT

Construction method for Double U-Shaped viaducts


Full Span Erection

8. Erection using simple cranes


Very fast construction cycle: few hours
per span!
Page 67

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Construction method for Double U-Shaped viaducts

ernative construction methods are possible according to each project c

Precast span placement at final location

Page 68

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Construction method for Double


U-Shaped viaducts

ernative construction methods are possible according to each project c

Span lifting using cranes

Page 69

Use of trailer to transport precast


spans on viaduct extremity

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Construction method for Single


U-Shaped viaducts
Example of segments Precasting in
precast yard

1a. Long bench for segments

Page 70

1b. Short cell for pier segments

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Construction method for Single U-Shaped viaducts


Stacking of segments & transported to
Construction site

2. Stacking of Segments in precast 3. Typical segment transportation on


trucks
yard

Page 71

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Construction method for Single U-Shaped viaducts

Then segments are lifted using a launching


gantry

4. Segments Lifting by Launching


Girder

Page 72

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Construction method for Box-Shaped viaducts

Example of segments Precasting in


precast yard

1. Long bench for segments

Page 73

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Construction method for Box-Shaped viaducts


Stacking of segments & transported to
Construction site

2. Stacking of Segments in precast 3. Typical segment transportation on


trucks
yard

Page 74

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Construction method for Box-Shaped viaducts


Then segments are lifted using a launching
gantry

4. Segments Lifting by Launching


Girder
Page 75

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Page 76REX - Bearing defects on Delhi Airport Metro Express Line

Comparison for Alternatives :

Page 77

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

U-Shaped viaduct allows to reduce visual impact

Vertical Clearance
.while keeping same vertical
clearance.
Page 78

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Significant reduction of visual impact

Page 79

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Significant Reduction of visual impact

Rail level lowering allows:


Reduction in piers heights
Reduction in foundations &
Substructures quantity
Reduction in height of stations
Reduction
in
energy
consumption due to mild slopes

Page 80

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Illustrating Benefits of Rail Level Reduction

Page 81

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Visual Impact

Page 82

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Advantages: Full Integration Of Various Components

Lateral web acts as:

Page 83

A noise barrier
An anti-derailment wall
A walkway on its top part
Reducing height of stations
A support for cable trough or
guide rail

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Advantages: Ranges of Span

Double U:

Single U:

Up to 35 m for spans typical


Up to 30 m spans for typical
structure
structure
Up to 48 m using an extended pier Up to 93 m using extradosed
cables
cap

Page 84

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Advantages: Ranges of Span Extended Pier Cap

Page 85

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Comparison
Item

Double
U

Single U

Box Girder

I-Girder

Constructability Aspect

Page 86

Casting

Full Span
Pretension

Segment by
Segment,
Additional Pre
stressing
operation

Segment by
Segment,
Additional
Prestressing
operation

I-Girder Precast
& Cast In Situ
Deck Slab,
Additional
shuttering for
Deck Slab
Casting

Transportati
on

Big Trailer
Required,
Approx.
9.0m Road
width is
required

Small Trailer
Required

Small Trailer
Required

Big Trailer
Required,
Difficult in Busy
Area

Erection
Equipments

Cranes

Launching
Girder

Launching
Girder

Cranes

Erection
Suitability

Always Front
Available

Always
Erection in
sequence

Always Erection
in sequence

Always Front
Available

Erection
Time

Can Erect in
few hours

Minimum 3
Days

Minimum 3 Days

Girder can be
erect in few

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Construction Time Cycle Per Span

Item

Time Cycle from


Casting to
Erection in Days

Page 87

Double Single U
U
viaduct
viaduct
14

30

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

Box Multiple
Girder I-Girder
viaduct viaduct
35

40

Comparison
Item

Double U

Single U

Box Girder

I-Girder

Permanent Structure Aspect


Span
Length

Max. 30m, in
special cases up
to 48m with
Extended Pier
Cap

Max. 35m

Max. 37m

Max 37m

Parapet &
Walk Way

In Built

In Built

Additional

Additional

Suitability

Straight Reach
& Curve 200m
Radius

Straight Reach &


Curve 200m
Radius

Straight Reach &


Sharp Curves

Straight Reach &


Sharp Curves

Aesthetics

Pleasant, Sleek
& slender
appearance

Pleasant, Sleek &


slender
appearance

Bulky in Shape &


Size

Bulky in Shape &


Size

Pier Cap

Precast PSC

Cast In Situ RCC

Cast In Situ RCC

Precast PSC or
Cast In Situ RCC

Cost

Economical

Economical

Costlier

Costlier

Page 88

ALTERNATIVES & CONCEPT DESIGN - ELEVATED VIADUCT

6. Special Feature of Metro Viaduct v/s Road


Bridges

1. EXPERTISE AND KNOW-HOW - OVERVIEW

Specific technical skills for rail structures:


Seismic design
Dynamic response to high speed loads
Rail structure interaction
Passenger comfort

Use of different design codes and manuals including:


American: AASHTO, AREMA, ACI, MCEER
British: BS
Chinese: MOR
Japanese
European: EUROCODES (EN)
Indian: IRC, IS, IRS...
French: CCTG, IN
.

Page 90

MODERN RAILS (CWR) ARE CONTINUOUS : NO RAIL EXPANSION


JOINTS
BRIDGES HAVE EXPANSION JOINTS
INCOMPATIBILITY

Rail Structure Interaction


Additional rail stresses brought by R.S.I.
1. Temperature variation
2. Deck end rotations
3. Braking & acceleration forces
This controls:
Location of structural and rail expansion joints
Girder stiffness
Supports stiffness (piers, foundations, bearings)

1. Temperature
variation

2. Deck
end
rotations

3. Braking and acceleration


forces

Rail Structure Interaction calculation model

(1) Continuous rails


(2) Deck
(3) Abutments

(4) Rail expansion joint (if any)

(5) Track longitudinal stiffness


(6) Pier longitudinal stiffness

CHECKS TO PERFORM
RAIL STRESSES:
< 92 MPa tension
< 92 MPa compression (slab track)
< 72 MPa compression (ballast)
LONGITUDINAL DISPLACEMENT UNDER BRAKING-ACCELERATION
LOADS:
- differential displacement between adjacent decks
< 5 mm if no rail expansion joints
< 30 mm if rail expansion joints at both ends
- differential displacement between rail and deck
< 4 mm

MAXIMUM LENGTHS

MAXIMUM BRIDGE EXPANDABLE LENGTH WITHOUT RAIL


EXPANSION JOINT (standard values for ballasted tracks):
- 90 m for concrete or composite bridges
- 60 m for steel bridges
MAXIMUM BRIDGE EXPANDABLE LENGTH WITH RAIL
EXPANSION JOINTS:
400 to 600 m depending on rail expansion joint technology

CONSEQUENCES FOR THE


DESIGN
PROVIDE ENOUGH LONGITUDINAL STIFFNESS TO SUPPORTS
(FOUNDATION + PIER + BEARING) IN ORDER TO MEET
DISPLACEMENT CRITERIA: d < 5 mm
PERFORM RSI CALCULATION IN ORDER TO OPTIMIZE SUPPORTS
STIFFNESS

LONGITUDINAL DISPLACEMENT UNDER


BRAKING/ACCELERATION

CLASSICAL CHECK (WITHOUT RSI CALCULATION)

Displacement under 100 % braking/acceleration


< 5mm
100
%

CHECK WITH RSI CALCULATION

Displacement under 70 15 = 65 % braking/acceleration < 5mm


(example)
15 %
15 %
70 %

FASTENERS BEHAVIOUR

CHECK UPLIFT OF FASTENERS AND COMPRESSION OF


FASTENERS