BOILER (CFB)
High-efficiency
Cold start-up 8 6 jam
Save fuel
Low pollution
Temperatur operasinya antara
850~950C
Desulphurization
SO2
Boiler Start up
Boiler cold start-up
Boiler warm start-up
Bed material temperature < 650C
Boiler hot start-up
Bed material temperature > 650C
C / hours
60 ~ 80
C / hours
80 ~100
C / hours
120
C / hours
30 ~ 60
< 50
< 17
JENIS BATUBARA
KANDUNGAN KARBON
ANTRASIT
META ANTRASIT
ANTRASIT
SEMI ANTRASIT
BITUMINOUS
SEMI BITUMINOUS
BITUMINOUS
SUB BITUMINOUS
LIGNIT
LIGNIT
BROWN COAL
(PEAT)
55%
KARBON
Sulfur (belerang)
Bituminous Coal
Semi Bituminous Coal
Anthracite
Acetylene
Ethane
Hydrogen
Methane
Carbon Monoxide
SIMBOL
KIMIAWI
TEMPERATUR PENYALAAN
C
243
408
466
496
470
766
870
925
C2H2
C2H4
H2
CH4
CO
482
538
610
650
654
900
1000
1130
1130
1210
Boiler firing
-
Boiler firing
Temperature rising
Buka (open) vent Drum & semua line uap
Pressure rising
Tutup vent Drum & atur pembukaan line
uap sesuai kenaikan pressure &
temprature
Yang perlu diperhatikan
Semua line uap yang dilalui gas panas
tidak boleh ada aliran uap yang terhenti
(menghindari overheating)
SHUTDOWN
BOILER SHUTDOWN
Classificasion
- Planned shutdown (overhaul,minor
repair and standby)
- Unplanned shutdown(emergency
shutdown and request for shutdown
BOILER SHUTDOWN
Principle of shutdown
- Cold reserve cooled down to
normal temperature for
maintenance
- Hot reserve boiler may be restart a
short time short time
- Emergency reserve cause by
equipment failure
Boiler shut-down
Cold Reserve
sliding parameter
Hot Reserve
constan pressure
Safety - economy
Turbine Shut-down
Emergency stopping
Shutdown
Load reduced to 40% - change the feed
water control auto to manual
Load reduced to zero stop fuel supply
(fire off)
Purge the furnace 30 -40% total air -5
-10 minutes to remove the possibly
residual combustibles remainned in the
furnaced and flue gas ducts
Drum pressure 0.2 Mpa open vent valve
Water temperature <90C the boiler drained
off
KAVITASI
Terjadi pada proses penguapan atau
pengembunan zat cair karena
perubahan tekanan pada zat cair.
Jika terjadi pembukaan FWC
menyempit dengan zat cair
bertemperature tinggi (147C)
STT-PLN
28
SOP/INTRUKSI KERJA
TERIMA
KASIH
Boiler pressure
Boiler Drum pressure rise >50C/hours
Total pressure rising process 4 hours