Our Presenters Today:

Charles G. Hardy, GSA-Deputy Director,


Office of Property Development. Chicago

Jonathan Wilch-Principal, NBBJ, Columbus

Jan Reinhardt, Program Manager, Virtual Design


& Construction, Turner Construction, Reston,
Va.

Richard T. La Jeunesse, Esq. Moderator, Graydon,


Hear & Ritchey LLP, Cincinnati

Ben Uwakweh Obinero, CIC Director, UC College


of Applied Science, Construction Science Dept.
Owner

BIM

User
Architect Contractor

E E S S F S

slide courtesy of Autodesk


An Industry Overview
Vocabulary
Building Information Models -- or
Modeling (BIM): Models of project product,
focus on design
Virtual Design and Construction (VDC):
Models of project Product (i.e., facilities), Work Processes and
Organization
Intent, form (design choices), behavior (predicted, observed)
BIM a subset of VDC
VDC Phases
Visualization
Automated Prediction
Technical Integration
Automation
4D: Visual animation of construction schedule
5D, 6D, XD.
An Industry Overview

2004
US Dept. of
Commerce,
Bureau of Labor
Statistics
An Industry Overview

2004
NIST Study
$15.8 billion / year
lost in construction
industry due to lack
of interoperability

NIST
1 Owner Leadership 2

Integrated Project PD: Pre-design


Efort/Efect

SD: Schematic design


Structure DD: Design development
CD: Construction documentation
PR: Procurement
Open Information CA: Construction Administration
4 OP: Operation
Sharing
1 Ability to impact cost
and functional
Virtual Building 2 capabilities
Cost of design changes

Models
3 3 Traditional design process

4 Preferred design process

PD SD DD CD PR CA OP
Time
Graphic by Patrick MacLeamy, FAIA

Graphic originated by Patrick MacLeamy, AIA / HOK


GSA National 3D-4D BIM Program
BIM Overview
3D geometric models
Geometric representation of building components and
typically serve as an aid for visualization and
design/construction coordination.
4D models (3D + time)
Include information which can inform and analyze project
phasing, tenant sequencing, and construction scheduling.
BIM models include not only 3D geometric models (and,
therefore, 2D and 3D drawings), but also more specific
product information on a wide range of building elements
and systems associated with a proposed building
GSA National 3D-4D BIM Program

For all major projects funded in October 2007


and beyond, GSA will require spatial program
BIMs be the minimum requirements for
submission for Final Concept approvals by the
PBS Commissioner and the Chief Architect.
Triforma
Structural Frame

\08 3D Models\consultants\korda\kordastructure-000000
Shell

\08 3D Models\shell\shell-concept-000000