EFFLUENT TREATMENT PLANT
WBS

ENGINEERI PROCUREME CONSTRUCT COMMISSION


NG NT ION ING
10% 40% 48% 2%

RESIDU DETAI ORDERIN MANUFACTUR


AL L G ING
ENGG ENGG
20% 80%
10% 90%

STATIC EQPT 15% STATIC EQPT 20% SITE 2%


INFRASTRUCURE
ROTATING 10%
EQPT ROTATING 20% MECHANICAL 20
EQP ERECTION %
PACKAGE 30%
PACKAGE 30% CIVIL & STRL 50
CIVIL & 20% %
STRL. PIPING 10%
PIPING 12
PIPING 15% ELECTRICAL 5%
%
ELECTRICAL 5% INSTRU 5%
ELECTRICAL 7%
INSTRU 5% PLATES / 9%
INSTRU 4%
STRUCT
MISC. 5% 2 of 9
CHEMECALS 1%
HSE STATUS

A. ACCIDENT STATUS

DESCRIPTION UNI UPTO THIS TOTAL


T PREVIOUS MONTH
MONTH
Fatal Nos Nil Nil Nil
Loss Time Accident Nos Nil Nil Nil
First Aid Incidents Nos Nil Nil Nil
Near Miss Accidents Nos Nil Nil Nil
Reported
Accident Free Man-Hours Man 25800 7656 28304
-hrs
HSE tool Room Talks 16 7 23
Conducted

B. Name of Safety Engineer / Officer Deployed :

Mr. Biswajit Saikia(Safety Officer)


Mr. Chanky Chand(Safety Officer)3 of 9
PHOTOGRAPHS - HSE MEASURES ADOPTED AT SITE

4 of 9
% PROGRESS STATUS FOR THE MONTH MARCH11-
APRIL11

Sl. Previous Month This Month Cumulative Progress Backlog


No. (As on 15.03.11) ( As on 14.04.11)

SCH. ACT. SCH. ACT. SCH. ACT.

1 3.66 % 2.66 % 1.58 % 2.72% 5.23 % 5.38 % 0

5 of 9
QUANTITATIVE STATUS FOR THE MONTH MARCH11
-APRIL 11
Sl. Activities Unit Total Cum This Month Cum. Backlo
No Qty. Sch (16.03.11-15.04. Act. g
. 11)
Sch. Act.

1. Excavation Cum 36000 19000 0 0 1900 0


0
2. PCC Cum 1450 280 280 244.20 244. 35.80
20
3. RCC Sub Cum 8000 250 250 0 0 250
Structure
4. RCC Super Cum 3500 0 0 0 0 0
Structure
5. Brick Work Cum 1550 0 0 200 200 0
7. DRIVEN PILE NOS 950 240 240 88 88 152
8 SAND FILLING CUM 14000 12400 12400 12210 1221 190
0

6 of 9
MANPOWER DEPLOYMENT STATUS

Sl. No. Category Deployed


2. Bar Benders 18
3. Mason 4
5. Unskilled & others 75
6. Fabricator 1
7. Welder 2
8. Fitter 1
9. Electrician 2
TOTAL = 103

7 of 9
AREAS OF CONCERN & PROPOSED ACTION PLAN

Sl. No. Areas of Concern Proposed Action Plan


1 Billing Schedule not
approved
Till date