MEASUREMENT OF QUANTITIES

Assumption No. 1: Total land area = 10m x 10m

Project Title: Construction and completion of


guard house
Owner: Panicsonic Sdn Bhd
Architect: A to Z Sdn Bhd
Drawing Title: Ground beam and foundation plan
-----------------------------------------------------------------------
--
Drawn by: Sheila
Checked by: Aaron

www.utm.my innovative entrepreneurial global2


MEASUREMENT OF QUANTITIES

www.utm.my innovative entrepreneurial global3


MEASUREMENT OF QUANTITIES

Construction Method

1. Preliminaries (Initial site works) - % of total cost


2. Site clearance and earthwork
3. Foundation construction (E.g. Piling and footing)
4. Work below lowest floor finish
5. Frame
6. Staircase
7. Upper Floor
8. Roof
9. Wall and partition
10. Door and window
11. Finishes
12. Sundries (Built-in furniture)
13. Building services (M&E, ICT etc)
14. External works (Water reticulation, landscape etc)

www.utm.my innovative entrepreneurial global4


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
1) Site clearance
1.1) Clear the site including Area of the site:
grubbing of trees, shrubs 10 x 10 = 100m2
and demolish any existing
structure and cart away
and dump to the specified
location.

10.00
10.00
----------
100.00 100 m2
----------

www.utm.my innovative entrepreneurial global5


MEASUREMENT OF QUANTITIES

www.utm.my innovative entrepreneurial global6


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
2) Foundation
2.1) Piling including all related Area of the building:
works Length = 3048 + 3048 = 6096
Width = 3048 + 3048 = 6096
6.10
6.10
----------
37.21 37 m2
----------

www.utm.my innovative entrepreneurial global7


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
2) Foundation

2.2) Excavation for pile cap Size of pile cap = 1219 x 1219
Depth of excavation:
9/1.22 1524 + 50 (lean concrete) =
1.22 1574
1.57
----------
21.03 21 m3
----------

Excavation and Lean concrete as


base for pile cap

www.utm.my innovative entrepreneurial global8


MEASUREMENT OF QUANTITIES

www.utm.my innovative entrepreneurial global9


MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
2) Foundation
2.3) Reinforced concrete Grade Size of pile cap:
30 for pile cap Length = 1219
Width = 1219
9/1.22 Thickness = 305
1.22
0.31
----------
4.15 4 m3
----------

Concrete for pile cap

www.utm.my innovative entrepreneurial global


10
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
2) Foundation
2.4) 50mm thick lean concrete Size of pile cap:
Grade 15 for pile cap Length = 1219
Width = 1219
9 / 1.22
1.22
----------
13.40 13 m2
----------

Excavation and Lean concrete as


base for pile cap

www.utm.my innovative entrepreneurial global


11
MEASUREMENT OF QUANTITIES

www.utm.my innovative entrepreneurial global


12
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
2) Foundation

2.5) Formwork for pile cap Size of pile cap:


Length = 1219
9 / 4 /1.22 Width = 1219
0.31 Thickness = 305
----------
13.62 14 m2 9/2/1.22
---------- 0.31 6.81

9/2/1.50
0.31 8.37
15.18 15m2

Formwork for pile cap

www.utm.my innovative entrepreneurial global


13
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
2) Foundation
2.6) Reinforcement bar Y12 for Length:
a c
pile cap
b

9/2/ 12/ 1.53


---------- = a + b + c cover
330.48m x 0.89 kg/m = = 305 + 1219 + 305 6(50)
294.13kg = 1829 300
---------- = 1529
= 294 kg
No. of bars:
= (b/100) + 1
= ((1219 2(50)cover )/100 )
+1
= 12 nos.

www.utm.my innovative entrepreneurial global


14
MEASUREMENT OF QUANTITIES

@100 c/c

www.utm.my innovative entrepreneurial global


15
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
3) WBLFF Taker off :
Checked by:
3.1) Column stump Size of column stump:
3.1.1) Reinforced concrete Length = 229
Grade 30 for column Width = 229
stump Height = 1524 305 thickness
of pile cap (351/2)
9/0.23 Half of beams
0.23 thickness
1.04 = 1043.50
----------
0.50 1 m3
----------

www.utm.my innovative entrepreneurial global


16
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
3) WBLFF
3.1) Column stump Size of column stump:
3.1.2) Formwork for column Length = 229
stump Width = 229
Height = 1524 305 thickness
9/4/0.23 of pile cap (351/2)
1.04 Half of beams
---------- thickness
8.61 9 m2 = 1043.50
----------

www.utm.my innovative entrepreneurial global


17
MEASUREMENT OF QUANTITIES

Height of column stump

@100 c/c

www.utm.my innovative entrepreneurial global


18
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
3) WBLFF
3.1) Column stump Length = a + half beams
3.1.3) Reinforcement bar Y12 thickness
lap cover + 2 laps
for column stump

9/4/2.97 a
----------
106.92m x 0.89kg/m =
lap
95.16kg
----------
95kg = 1524 + (351/2) 50 +
(660x2)
= 2969.50

www.utm.my innovative entrepreneurial global


19
MEASUREMENT OF QUANTITIES
General Notes

www.utm.my innovative entrepreneurial global


20
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
3) WBLFF
3.1) Column stump Length of link:Hoo
(length of CS
k
3.1.4) R6 link in for column 2cover) x 4 +hook
stump

9/6/0.62
---------- =(229-100)+(229-100)+(229-
33.48m x 0.22kg/m = 100)+(229-100)+100=616
7.36kg
---------- No. of link:
7kg Height of column stump =
1043.50
=(1043.50/229)+1
= 6 nos.

www.utm.my innovative entrepreneurial global


21
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
3) WBLFF
3.2) Ground beam Size of ground beam:
3.2.1) Excavation for ground Length=3048+3048=6096
beam Width = 229
Thickness = 351
2/3/6.10
0.23
0.35
----------
2.95m3
----------
3m3
Excavation for ground beam

www.utm.my innovative entrepreneurial global


22
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
3) WBLFF
3.2) Ground beam Size of ground beam:
3.2.2) Reinforced concrete Length=3048+3048=6096
Grade 30 for ground beam Width = 229
Thickness = 351
2/3/6.10
0.23
0.35
----------
2.95m3
----------
3m3

RC for ground beam

www.utm.my innovative entrepreneurial global


23
MEASUREMENT OF QUANTITIES

Assumption No. 1: Total land area = 10m x 10m

Project Title: Construction and completion of


guard house
Owner: Panicsonic Sdn Bhd
Architect: A to Z Sdn Bhd
Drawing Title: Ground beam and foundation plan
-----------------------------------------------------------------------
--
Drawn by: Sheila
Checked by: Aaron

www.utm.my innovative entrepreneurial global


24
MEASUREMENT OF QUANTITIES

Height of column stump

@100 c/c

www.utm.my innovative entrepreneurial global


25
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
3) WBLFF
3.2) Ground beam Size of ground beam:
3.2.3) Formwork for ground Length=3048+3048=6096
beam Width = 229
Thickness = 351

2/3/2/6.10
0.35
----------
25.62 26m2
----------

Installation of reinforcement bar and


formwork for ground beam

www.utm.my innovative entrepreneurial global


26
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
3) WBLFF
3.2) Ground beam Length = (length2cover)
3.2.4) Reinforcement bar Y10 +(2bend-2cover)
for ground beam =(6096-(2x50))+(2x351)-(4x50)
= 6498
2/3/4/6.50
----------
156.00m x 0.62kg/m =
96.72kg
----------
97kg

www.utm.my innovative entrepreneurial global


27
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
3) WBLFF
3.2) Ground beam Length of stirrup:
Hoo
k
3.2.5) R6 stirrup for ground
beam

2/3/28/0.86 =(229-100)+(351-100)+(229-
---------- 100)+(351-100)+100
144.48m x 0.22kg/m = =860
31.79kg
---------- No. of stirrup:
32kg Length of grd beam= 6096
=(6096/229)+1
= 28 nos.

www.utm.my innovative entrepreneurial global


28
MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF

3.3) Ground slab Area of slab = length x width


3.3.1) Excavation for ground slab Depth of excavation = 500mm

6.10 150mm
6.10 BRC A8
thick
concrete
0.50 slab

----------
18.61m3 19 m3
---------- 50mm
thick sand

300mm
thick
hardcore

DPM

Installation of formwork,Damp Proof Membrane


(DPM) and BRC wire mesh for ground slab

www.utm.my innovative entrepreneurial global


29
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.2) Reinforced concrete G30 Depth of excavation = 500mm
in ground slab BRC A8
150mm
thick
concrete
slab

6.10
6.10
50mm
0.15 thick sand

---------- 300mm
thick
5.58m3 hardcore

---------- 6 m3 DPM

www.utm.my innovative entrepreneurial global


30
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.3) Formwork for ground Depth of excavation = 500mm
slab BRC A8
150mm
thick
concrete
slab

4/6.10
0.15
50mm
---------- thick sand

3.66m2 300mm
thick
---------- hardcore

4 m2 DPM

www.utm.my innovative entrepreneurial global


31
MEASUREMENT OF QUANTITIES

Project: Construction and


completion of Guard House
for Panicsonic Sdn Bhd
3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.4) BRC A8 for ground slab Depth of excavation
BRC A8
= 500mm
150mm
thick
concrete
slab

6.10
6.10
50mm
---------- thick sand

37.21m2 300mm
thick
---------- hardcore

37 m2 DPM

www.utm.my innovative entrepreneurial global


32
MEASUREMENT OF QUANTITIES

Project: Construction and


completion of Guard House
for Panicsonic Sdn Bhd
3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.5) DPM for ground slab Depth of excavation
BRC A8
= 500mm
150mm
thick
concrete
slab

6.10
6.10
50mm
---------- thick sand

37.21m2 300mm
thick
---------- hardcore

37 m2 DPM

www.utm.my innovative entrepreneurial global


33
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.6) 50mm sand blinding for Depth of excavation = 500mm
ground slab 150mm
thick
BRC A8
concrete
slab
6.10
6.10
---------- 50mm
thick sand
37.21m2 300mm

----------
thick
hardcore

37 m2 DPM

www.utm.my innovative entrepreneurial global


34
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.7) Hardcore for ground slab Depth of excavation = 500mm
150mm
thick
BRC A8
6.10 concrete
slab

6.10
0.30
50mm
---------- thick sand

11.16m3 300mm
thick
---------- hardcore

11 m3 DPM

www.utm.my innovative entrepreneurial global


35
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
4) FRAME Taker off :
Checked by:
4.1) Column Size of column:
4.1.1) Reinforced concrete Length = 229
Grade 30 for column Width = 229
Height = Height of the wall
9/0.23 = 3000mm
0.23
3.00
----------
1.43 1 m3
----------

Installation of reinforcement bar and


formwork for column

www.utm.my innovative entrepreneurial global


36
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
4) FRAME
4.1) Column Size of column:
4.1.2) Formwork for column Length = 229
Width = 229
9/4/0.23 Height = 3000
3.00
----------
24.84 25 m2
----------

www.utm.my innovative entrepreneurial global


37
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
4) FRAME
4.1) Column Length = height of column +
4.1.3) Reinforcement bar Y12 half of roof beam + 1 lap +
for column bend bend

9/4/4.50
Height of wall
----------
162.00m x 0.89kg/m =
144.18kg
---------- lap
144kg

= 3000+ (0.5x351) + 660 +


660
www.utm.my = 4495.5 entrepreneurial global
innovative 38
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
4) FRAME
4.1) Column Length of link: (length of CS
Hoo
4.1.4) R6 link in for column 2cover) x 4 +hook
k

9/14/0.82
----------
103.32m x 0.22kg/m = =(229-50)+(229-50)+(229-
22.73kg 50)+(229-50)+100=816
----------
23kg No. of link:
Height of column = 3000
=(3000/229)+1
= 14 nos.

www.utm.my innovative entrepreneurial global


39
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
4) FRAME
4.2) Roof beam Size of roof beam:
4.2.1) Reinforced concrete Length=3048+3048=6096
Grade 30 for roof beam Width = 229
Thickness = 351
2/3/6.10
0.23
0.35
----------
2.95m3
----------
3m3

www.utm.my innovative entrepreneurial global


40
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
4) FRAME
4.2) Roof beam Size of roof beam:
4.2.2) Formwork for roof beam Length=3048+3048=6096
Side
Width = 229
Thickness = 351
Soffit
2/3/6.10
0.93
----------
34.04 34m2
----------

= 351 + 229 + 351


= 931
www.utm.my innovative entrepreneurial global
41
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
4) FRAME
4.2) Roof beam Length = (length2cover)
4.2.3) Reinforcement bar Y10 +(2bend-2cover)
for roof beam =(6096-(2x50))+(2x351)-(4x50)
= 6498
2/3/4/6.50
----------
156.00m x 0.62kg/m =
96.72kg
----------
97kg

www.utm.my innovative entrepreneurial global


42
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
4) FRAME
3.2) Roof beam Length of stirrup:
Hoo
k
3.2.5) R6 stirrup for roof beam

2/3/28/1.06
---------- =(229-50)+(351-50)+(229-
178.08m x 0.22kg/m = 50)+(351-50)+100
39.18kg =1060
----------
39kg No. of stirrup:
Length of beam= 6096
=(6096/229)+1
= 28 nos.

www.utm.my innovative entrepreneurial global


43
MEASUREMENT OF QUANTITIES

Assumption No. 1: Total land area = 10m x 10m

Project Title: Construction and completion of


guard house
Owner: Panicsonic Sdn Bhd
Architect: A to Z Sdn Bhd
Drawing Title: Ground beam and foundation plan
-----------------------------------------------------------------------
--
Drawn by: Sheila
Checked by: Aaron

www.utm.my innovative entrepreneurial global


44
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
5) ROOF = area of roof
3m
=axbx2 a
5.1) Roof trusses and covering

2/8.50
5.20 a = 42482 + 30002
----------
88.40m2 88 m2 Front and rear elevation
---------- a = 5200

b = 6096 +
1200 + b
1200
b = 8496

Right and left


elevation
www.utm.my innovative entrepreneurial global
45
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
6) DOOR and WINDOW Door can be
measured eithera 3m
6.1) Single leaf panel door size 2100 in m2 or
x 900 including frame and number. If
painting enumerated then
need to state
type and size
Front and rear elevation
2 2 nos.
----------

Right and left


elevation
www.utm.my innovative entrepreneurial global
46
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
6) DOOR and WINDOW Window can be
measured eithera 3m
6.2) Adjustable louvres window in m2 or
1200 x 600 including frame , number. If
painting and glass enumerated then
need to state
type and size
Front and rear elevation
6 6 nos.
----------

Right and left


elevation
www.utm.my innovative entrepreneurial global
47
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
7) WALL AND PARTITION
3m
7.1) Half brickwall in comon brick
a

4/ 6.10
3.00 73.20

Less opening (e.g. door and window) Front and rear elevation

2/2.10
0.90 3.78 (door)
65 m2 b
6/1.20
0.60 4.32 (window) Brickw
65.10 all

Right and left


elevation
www.utm.my innovative entrepreneurial global
48
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
8) FINISHES Area of plastering
and panting = a 3m
8.1) Plastering and painting Area of wall x 2
2/ 65m2 130m2 Area of ceiling =
area of slab
8.2) Floor Finishes cement render Front and rear elevation

37 m2

b
8.3) Ceiling 37m2

Brickw
all
Right and left
elevation
www.utm.my innovative entrepreneurial global
49
MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for


Panicsonic Sdn Bhd
9) SUNDRIES
3m
9.1) Built-in counter size 1800mm x
a
900mm x 725mm(h).

1
1 no. Front and rear elevation

Brickw
all
Right and left
elevation
www.utm.my innovative entrepreneurial global
50