Overview of
RNP&RNO
www.huawei.com
Project Execution
The following information of the original network must be collected:
Basic information of the network
Network Basic needs and functions
Basic information on the operation of online equipment
Planning RNP data
Network information
Transmission and networking Objective
Information of power supply configuration
Abnormal network information and customers complaints
Customers engineering and maintenance capability
Network Optimization
Site
Logical channel
SACCH
Group3,4
Group Group1 Group2 (same as Grpup5
Group2)
The following information of the original network must be collected:
Channel F S BX4 Basic Finformation
CX4 S CX4 of the
CX4 network
F S CX4 CX4 I
Basic needs and functions
Frame
0 1Basic
2-5information
6-9 10on 11
the 12-15
operation
16-19of online
20-39 equipment
40 41 42-45 46-49 50
Number RNP data
Transmission and networking information
Information of power supply configuration
1 multi-frame (51TDMA Frames) 235.38ms Uplink
Abnormal network information and customers complaints
Customers engineering and maintenance capability
Channel R R R R R R R R R R R R R RR R R R R
Frame
0 1 2 3 4 5 6 7 8 9 10 11 12 13-46 47 48 49 50
Number
B C C C D0 D1 D2 D3 A0 A1
Channel F S F S F S F S F S I
4 4 4 4 4 4 4 4 4 4
The following information of the original network must be collected:
B C C C D0 D1 D2 D3 A2 A3
Channel F S F Basic
S informationF S of the network
F S F S I
4 4 4 4
Basic needs and 4 4
functions 4 4 4 4
Frame
0-3 4 5 6-9 10-13 14-36 37-40 41-44 45 46 47-50
Number
D0 D1 D2 D3 D4 D5 D6 D7 A0 A1 A2 A3
Channel I I I
4 4 4 4 4 4 4 4 4 4 4 4
Channel
The
D0 following
D1 D2information
D3 D4 of the
D5original
D6 network
D7 A4 mustA5be collected:
A6 A7
I I I
4 4 4 Basic
4 information
4 4 of4 the network
4 4 4 4 4
Basic needs and functions
Frame
0-3
Basic
4-7
information
8-11
12- on
16- the20-
operation
24- of
28-online
32- equipment
36- 40- 44-
48 49 50
Number 15 19 RNP
23 data 27 31 35 39 43 47
A1 A2 A3 D0 D1 D2 D3 D4 D5 D6 D7 A4
Channel I I I
4 4 4 4 4 4 4 4 4 4 4 4
Frame 15- 19- 23- 27- 31- 35- 39- 43- 47-
0-3 4-7 8-11 12 13 14
Number 18 22 26 30 34 38 42 46 50
Channel T T T T T T
The following information of theToriginal
T T T
network T
must T
be S TT
collected: T I
Information collection
Information of the original network must be collected in swap
project:
Basic information of the network
Basic needs and functions
RPO202-01
Basic information on the operation of online Network Planning Information C
equipment
RNP data
Transmission and networking information
Information of power supply configuration
Abnormal network information and customers complaints
Customers engineering and maintenance capability
Site allocation
standard meshes - Radio network planners select locations of BTSs in the
covered area according to the intervals of standard meshes, then adjust sites
layout according to the coverage prediction so as to meet the coverage.
Adjustment of BTS configuration depends on subscriber distribution. If capacity in
The following
some areas information
fails to meet of the original
the requirements, network
more must be
BTSs should becollected:
added, and then
Basic information of the network
repeat the above process. Such Basiccalculation
needs and process is operated in GIS.
functions
Basic information on the operation of online equipment
specific areas - Planning beginsRNP from areas with the densest subscriber
data
Transmission
distribution or the area and to
most difficult networking information
be planned. First put BTSs in the center of
Information of power supply configuration
key areas that ensure coverage
Abnormal network and capacity
information andof important complaints
customers areas. Then plan other
BTSs according Customers
to the designengineering
targets ofand maintenance
coverage capability
and capacity. The subsequent
steps are the same as those for the first way.