FOUNDATIONS IN SAND CEMRE ALAR 1551613 GIVEN DATA ABOUT THE PROJECT
Foundation dimensions 5m x 55m.
Estimated pressure on the foundation is 1000 kN/m The SPT and CPT data of the soil SETTLEMENT FROM SPT (BURLAND & BURBIDGE) Informatons from SPT data: The ground water table is at 12.51 m. We assume the borehole diameter is between 65-115 mm and CB=1.00 We have undisturbed samples from the soil for different portions CS=1.00 Corresponding rod length correction factor CR=1.00. Lastly; the test handled with double turns on cathead donut hammer and its efficiency is =0.45 and we should correct it. Corrected SPT values SETTLEMENT FROM CPT (SCHMERTMANN) Schmertmann graph: Schmertmanns settlement equation; CONCLUSION The two methods gives approximately the same result.
Schmertmann can be more realistic because
of the continuous data available from CPT
The settlements are not much for the
structure. THANKS FOR YOUR ATTENTION!!! REFERENCES CE 468 lecture notes CE 366 Foundation engineering 1 lecture notes,Altay Birand,Ufuk Ergn,Orhan Erol Craig Soil Mechanics, 1995