Вы находитесь на странице: 1из 11

SETTLEMENT OF

FOUNDATIONS IN SAND
CEMRE ALAR
1551613
GIVEN DATA ABOUT THE PROJECT

Foundation dimensions 5m x 55m.


Estimated pressure on the foundation is 1000
kN/m
The SPT and CPT data of the soil
SETTLEMENT FROM SPT
(BURLAND & BURBIDGE)
Informatons from SPT data:
The ground water table is at 12.51 m.
We assume the borehole diameter is between
65-115 mm and CB=1.00
We have undisturbed samples from the soil for
different portions CS=1.00
Corresponding rod length correction factor
CR=1.00.
Lastly; the test handled with double turns on
cathead donut hammer and its efficiency is
=0.45 and we should correct it.
Corrected SPT values
SETTLEMENT FROM CPT
(SCHMERTMANN)
Schmertmann graph:
Schmertmanns settlement equation;
CONCLUSION
The two methods gives approximately the
same result.

Schmertmann can be more realistic because


of the continuous data available from CPT

The settlements are not much for the


structure.
THANKS FOR YOUR
ATTENTION!!!
REFERENCES
CE 468 lecture notes
CE 366 Foundation engineering 1 lecture
notes,Altay Birand,Ufuk Ergn,Orhan Erol
Craig Soil Mechanics, 1995

Вам также может понравиться