OVERVIEW
GENERAL INFORMATION
PRINCIPLES OF OPERATION
HISTORY
ENVIRONMENTAL IMPACT
CONSTRUCTION AND OPERATION
COMPARISON
HYDROELECTRIC PLANT PRINCIPLES
1. DAM
- ELEVATE WATER TO GAIN ENERGY THAT IS STORED IN POTENTIAL ENERGY
FORM
- CONTROLS FLOW OF RIVER
2. TURBINE
- TURBINE CONVERTS WATERS KINETIC ENERGY TO MECHANICAL FORM
THROUGH THE ROTATION OF THE TURBINE BLADES PRODUCED FROM THE FORCE
OF THE WATER
3. GENERATOR
- CONVERTS THE MECHANICAL ENERGY FROM THE TURBINE TO ELECTRICAL
ENERGY WHERE IT CONNECTS TO TRANSMISSION LINES
DAM TURBINE GENERATOR
SCHEMATIC OF HYDROPOWER DAM
CONSEQUENCES OF USING HYDROPOWER
Benefits Drawbacks
Location:
- On border between Brazil &
Paraguay
- On the Parana River
HISTORY
TIMELINE:
FIRST PROPOSED IN 1960S.
CONFIRMED IN 1966.
CONSTRUCTION 1971
OPENED IN1980S
NAME ITAIPU MEANS SOUNDING STONE AFTER SMALL ISLAND NEAR THE
CONSTRUCTION SITE
CONSTRUCTION AND OPERATION
Construction Dam Operation
ITAIPU
FACTS
Construction
Parana River is one
required the
of the largest
movement of 50
rivers in the world
million tons of earth
THE ITAIPU DAM BECAME THE MOST
PRODUCTIVE HYDROELECTRIC POWER DAM
IN THE WORLD