Pacific Team

2001
TEAM INTRODUCTION

Crystal Lang ARCHITECT

Robert Wright ENGINEER

Robert Alvarado OWNER

Edgar Leenen CONSTRUCTION MANAGER

Pacifi
Will Clift APPRENTICE

c
2001
GENERAL INFORMATION

Site: Univ. of the Pacific,


Forest Grove, Oregon
Year: 2015

Surroundings:
Atop a cliff looking out on
Pacific Ocean
Small pond on inland side Pacifi
c
2001
GENERAL INFORMATION

Geologic Information: The site lies on top


of bedrock.

Precipitation: 65-90 annually

Flooding occurs occasionally

Wind: Strong winds up to 85 mph can exist

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

BUDGET
Inflation Rate
7.00%
6.00%
5.00%
4.00% Inflation Rate
3.00%
2.00% Average: 2,95%
1.00%
0.00%
1990

1992

1993

1994

1995

1996

1997

1998

1999

2000
1991

Budget in 2015 (Budget in 2001)*(1-Inflation Rate)^n

Budget in 2001 $5,500,000


n = nr of years 14
Budget Structural System in 2001
Inflation Rate
450000
2.95% Pacifi
Budget in 2015 $3,620,000 c
2001
Budget Structural System in 2001 $296,000
ARCHITECTENGINEERCONSTRUCTIONMANAGER

ROCK
Light
Functional space
ARCHITECTENGINEERCONSTRUCTIONMANAGER
ARCHITECTENGINEERCONSTRUCTIONMANAGER

LOADING

Live Loads
Atrium, Terrace, Storage 100 psf
Corridors 80 psf
Lobby, Auditorium 60 psf
Classrooms, Offices 50 psf
Roof 20 psf

Seismic Requirements
Zone III Seismic Activity
Occupancy Category, I = 1.0

Wind Requirements
Pacifi
Design Wind Speed 85 mph c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

M.E.P CONSIDERATIONS

Cooling capacity 70 tons


Boiler room & chilled water 450 ft2
Space for cooling towers 80 ft2
Cooling air volume 27000 CFM
Main supply or return ducts area 16 ft2
Branch supply or return ducts 27 ft2
Area of fan rooms 750 ft2
Area of fresh air louvers 65 ft2
Area of exhaust air louvers 50 ft2
Central mechanical room area 1200 ft2
Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

ROCK
Structural Solution I
Lateral System
Gravity System

Lateral System
Steel Moment Resistant Frames (N S)
Reinforced Concrete Shearwalls (E W) Pacifi
Gravity System
Composite Steel/Concrete Deck
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

ROCK
First Floor E E+A

TYPICAL SIZES

Gravity
Beams W18X55
Columns W12X45
Second Floor Slab t = 4.5

Lateral
Beams W18X40
Columns W18X35
Shearwall h = 10

Third Floor

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

STEEL CONNECTIONS

Steel Beam-Shearwall Connection Moment Connection

Pacifi
Beam-Girder Connection Girder-Column Connection
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

ROCK
Structural Solution II
Lateral System
Gravity System

Lateral System
Post-Tensioned Moment Resistant Frames (N S)

Pacifi
Reinforced Concrete Shearwalls (E W)
Gravity System
Two-Way Post-Tensioned Slab
Reinforced Concrete Columns and Beams c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

ROCK
First Floor E E+A

TYPICAL SIZES

Gravity
Beams 7X10
Columns 12X12
Second Floor Slab h = 9

Lateral
Shearwall h = 10

Third Floor

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONCRETE POST-TENSIONED DETAILS

Tendon Support

Pacifi
Post-Tensioned Slab c
2001
Moment Connection
ARCHITECTENGINEERCONSTRUCTIONMANAGER

EQUIPMENT
ARCHITECTENGINEERCONSTRUCTIONMANAGER

SITE PLAN ROCK & EARTH

Pacific ocean

Main Road

Sunny Pond

Pacifi
Construction
Mobile crane
Office
Material storage

c
Material laydown area

2001
Crane range
Lunch/dress room
Ground surplus/garbage storage
Site Boundary
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SCHEDULE ROCK 1

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SCHEDULE ROCK

ROCK 1 (steel)

ROCK 2 (reinforced concrete/post-tensioned concrete)

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SEQUENCE ROCK

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SEQUENCE ROCK

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SEQUENCE ROCK

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SEQUENCE ROCK

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SEQUENCE ROCK

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SEQUENCE ROCK

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SEQUENCE ROCK

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

Dynamic
WAVE
Explore
1

2
3
ARCHITECTENGINEERCONSTRUCTIONMANAGER
ARCHITECTENGINEERCONSTRUCTIONMANAGER

WAVE
Structural Solution I
Lateral System
Gravity System

Lateral System
ShearWalls

Pacifi
Concrete Moment Frames
Two Separate Buildings
Gravity System
Two-Way Slabs c
2001
Reinforced Concrete Columns and Beams
ARCHITECTENGINEERCONSTRUCTIONMANAGER

WAVE
First Floor E E+A

TYPICAL SIZES

Gravity
Beams 10X12
Columns 12X12
Second Floor Slab h = 10

Lateral
Beams 18X18
Columns 16X14
Shearwall h = 10

Third Floor

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

REINFORCED CONCRETE CONNECTIONS

Column Reinforcement Beam Reinforcement

Pacifi
c
2001
Beam-Column Shear Reinforcement
ARCHITECTENGINEERCONSTRUCTIONMANAGER

WAVE
Structural Solution II
Lateral System
Gravity System

Lateral System
ShearWalls

Pacifi
Steel Moment Resistant Frames
Gravity System
Composite Steel/Concrete Deck
Steel Beams and Columns with Simple Shear Connections c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

WAVE
First Floor E E+A

TYPICAL SIZES

Gravity
Beams W16X36
Columns W12X40
Second Floor Slab h = 4.5

Lateral
Beams W16X40
Columns W16X31
Shearwall h = 8

Third Floor

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

SHEARWALL DETAILS

Shearwall Reinforcement

Wall-Footing Elevation
Pacifi
c
2001
Shearwall Corner Reinforcement
ARCHITECTENGINEERCONSTRUCTIONMANAGER

SITE PLAN WAVE

Pacific ocean

Main Road

Sunny Pond

Pacifi
Construction
Mobile crane
Office
Material storage

c
2001
Material laydown area
Crane range
Lunch/dress room
Ground surplus/garbage storage
Site Boundary
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SCHEDULE WAVE


WAVE 1 (reinforced concrete)

WAVE 2 (steel)

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SEQUENCE WAVE

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SEQUENCE WAVE

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SEQUENCE WAVE

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SEQUENCE WAVE

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SEQUENCE WAVE

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SEQUENCE WAVE

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SEQUENCE WAVE

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

Functional
EARTH Flexible
ARCHITECTENGINEERCONSTRUCTIONMANAGER
ARCHITECTENGINEERCONSTRUCTIONMANAGER

EARTH
Structural Solution I
Lateral System
Gravity System

Lateral System
ShearWalls (N S)
ShearWalls (E W)
Gravity System Pacifi
c
Post-Tensioned Two-Way Slabs
Reinforced Concrete Beams and Columns
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

EARTH
First Floor E E+A

TYPICAL SIZES

Gravity
Beams 7X12
Columns 12X12
Second Floor Slab h = 9

Lateral
b Shearwall N h = 10
Shearwall E h = 8

Third Floor

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

EARTH
Structural Solution II
Lateral System
Gravity System

Lateral System
ShearWalls (N S)
ShearWalls (E W)
Gravity System Pacifi
c
Composite Steel/Concrete Deck
Steel Beams and Columns with Simple Shear Connections
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

EARTH
First Floor E E+A

TYPICAL SIZES

Gravity
Beams W18X55
Columns W12X45
Second Floor Slab h = 9

Lateral
b Shearwall N h = 10
Shearwall E h = 8

Third Floor

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

FOUNDATION SYSTEM

Spread for interior columns


Typical Size 4 X 4 X 2
Strip for perimeter columns and shearwalls
Typical Size 4 X 2

Pacifi
Typical Steel Column-Footing Typical Concrete Column-Footing
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SCHEDULE EARTH


EARTH 1 (reinforced concrete/post-tensioned concrete)

EARTH 2 (steel)

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SEQUENCE

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SEQUENCE

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SEQUENCE

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SEQUENCE

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SEQUENCE

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SEQUENCE

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

CONSTRUCTION SEQUENCE

Pacifi
c
2001
ARCHITECTENGINEERCONSTRUCTIONMANAGER

COST COMPARISON

3840000 3900000 3800000 3700000 3780000 3840000

4000000 BUDGET
3500000
3000000
2500000
2000000
1500000
1000000

Pacifi
300000 340000 220000 185000 180000 210000
500000
0
ROCK 1 ROCK 2 WAVE 1 WAVE 2 EARTH 1 EARTH 2

Structural System Costs


c
2001
Total Costs
ARCHITECTENGINEERCONSTRUCTIONMANAGER

COST COMPARISON
3500000

3000000 Clean up site


Plumbing systems
2500000 Electrical systems
Mechanical systems
2000000 Interior construction
Exterior closing
Conveying systems
1500000 Roof
Superstructure
1000000 Substructure
Foundation
500000 Site Preparation

0
ROCK 1 WAVE 2 EARTH 1

Pacifi
WAVE 2 COSTS
Beams Steel Structural system $ 178.000
Columns Steel $ 3.700.000
c
Total

2001
Moment frames Steel
Slab Composite BUDGET
Roof Steel Structural system $ 296.000
Total $ 3.620.000
TEAM INTERACTIONS

SAMPLE DESIGN ITERATION


A+E+C
A A+E E+C
1

C
Time
DECISION MATRIX

Rock Wave Earth


A Functional space Responds to environment Spacious
A Does not respond to Walls under an angle Large monotonous facade
environment

E Balanced structure Blends well with architecture Structure provides


flexibility
E Highly skilled labor force No repetition in structural Large spans require deep
required elements gravity members

C Short construction time Matches budget Prefab concrete possible


C Expensive structural Non standard building Might exceed height limit
system
PACIFIC 2001 CHOICE

WAVE!
LESSONS LEARNED AND GOALS

Utilize available technology more effectively


Improve communication
Coordinate media we work in
More interactions:
Between team members
With mentors
With owner

Pacifi
c
2001
QUESTIONS

?
Pacifi
c
2001