PRESENTATION MATERIAL ON
002
BHEL AT A GLANCE
Serving key sectors - Power, Petroleum, Fertiliser,
Petrochemicals, Steel, Cement, Defence,
Transportation, Communications etc.
Among Worlds Top Power Equipment Manufacturers
Contributed to Indias installed capacity - 65%
BHELs Powerplants PLF 63.2% (> National average)
Maximum awards for best Thermal Plants
A : 001A
BHEL GAS TURBINES
drive application
Low exhaust emissions
State of art micro-processor based control system
with redundant protection
Package concept to limit site work to the minimum
Manufacture of Rotor/Hot gas path parts established
Ready for IGCC application
Proven technology - around 6,000 machines and 260 million
fired hours experience of GE
Over 92 machines and more than three million fired hours
experience of BHEL
COLLABORATION WITH GE, USA
003
HEAVY DUTY GAS TURBINE MODEL DESIGNATION
PG 6 56 1 (B)
004
GT MODELS AND RATING
Note: ISO output is : 15 deg C, 60% RH, Zero MSL, Gas fuel
and standard Inlet/Exh. Pr. drops
008
GAS TURBINE RANGE
005
009
010
POWER(29.5 %)
FUEL GAS
EXHAUST
(100 %) TURBINE HEAT
(67 %)
MISC.
(3.5 %)
C:\UMESH\DEPT\GTDRG01.PPT....005
011
GAS TURBINE REQUIREMENTS
021
MAJOR FACTORS AFFECTING
GAS TURBINE PERFORMANCE
Ambient Temperature
Altitude above Mean Sea Level (MSL)
Relative Humidity
Inlet Pressure Loss
Exhaust Pressure Loss
Steam / Water Injection for NOX Control
Type of Fuel
012
TYPICAL
013
TYPICAL
014
PRESSURE DROP EFFECTS
(FOR FRAME -6)
4 INCHES H2O INLET DROP PRODUCES :
1.50% POWER OUTPUT LOSS
0.50 % HEAT RATE INCREASE
1.2 DEG.F EXHAUST TEMP. INCREASE
4 INCHES H2O EXHAUST DROP PRODUCES :
INDICATIVE FIGURES
015
TYPICAL
016
TYPICAL
017
033
GAS TURBINES FROM BHEL HYDERABAD(as on July 99)
032
EXPERIENCE
Turnkey execution of Simple
Cycle/Cogeneration/Combined Cycle Plants
25 Cogeneration Plants
12 Combined Cycle Plants
12 Sets on Turnkey basis overseas
(Malaysia, Oman, Saudi Arabia)
Worlds largest experience on Naphtha
EPC/TURNKEY CONTRACTS (EXECUTED)
(OVERSEAS)
018