Академический Документы
Профессиональный Документы
Культура Документы
POWERCHINA
General Introduction
Figures of POWERCHINA
OPOWE HYDROCHINA
Planner and designer for 70% of hydropower plants in China
2nd among Top 150 Global Design Firms
SEPCO III
The largest Chinese contractor for overseas thermal projects
Worldwide Operation
Europe
Asia
America
Africa
Oceania
Construction Investment
Types
On-Shore, Off-Shore
Scales
Min: 5-10MW Max: 200 - 300MW
Services
Planning & Assessment, Engineering, EPC, FEPC, Investment
Experience
5,000MW Completed, 20,000Mw Under Construction,
Wu Zhong Wind Farm
49.5 MW, 2013 23,000MW Under Planning
POWER SOLAR
Types
Land Type, Roof Type..
Scales
5-200MW
Services
Planning & Assessment, Consultancy & Supervision,
Engineering Design, EPC, FEPC and Investment
Qinghai Wulan II Solar PV
Power Generation Park
ENVIRONMENT WATER SUPPLY
Types
Water Supply Plant, Long-distance Water Diversion.
Scales
Min: 10,000t/d Max: > 600,000t/d
Services
Consultancy, EPC, FEPC, Investment, Operation
Experience
More than 200 Projects Completed
Kaihua Urban Water Supply Plant
50,000t/d, 2004
ENVIRONMENT WATER TREATMENT
Types
Industrial and Urban Wastewater Disposal, Seawater
Desalination, Solid Waste Disposal, etc.
Scales
Min: 1,000t/d Max: > 300,000t/d
Services
Design, Consultancy, EPC, FEPC, Investment, Operation
Experience
Jiangyin Wastewater Treatment Plant More than 200 Projects Completed
40,000t/d, 2009
URBAN CONSTRUCTION ROAD & BRIDGE
Types
Roads, Highways of all grades & Bridges
Services
Investment, Design & Consultation, EPC
Experience
Over 300 Provincial and Municipal Key Projects
since 1980s, 400km Highways, 30 Large-sized
Handan City East Renming Road
Bridges
Cloverleaf Interchange
URBAN CONSTRUCTION TUNNEL & METRO
Types
Tunnel, Metro & Underground Space
Services
Design & Consultation
Experience
Be Engaged in Over 60 Tunnels and Several Metro
Projects Including 50 Stations and 100km Sections
Hangzhou Metro No1
Part
Railway Experience
POWERCHINA
The design speed is 250km/h and the total length is about 35km,
including 10km roadbed, 12km bridges(35 nos) and 35.5 km CRTS
ballstless track.
Shanghai Kunming
Shanghai Kunming
High-Speed Railway
Shanghai Kunming
High-Speed Railway
Nanning Guangzhou High-Speed Railway
(China)
The design speed is 200-250km/h and the total length is 20.6km, including 23
sections, 13.37km roadbed, 5.65 km bridges (30 nos) and 20.6km tunnel .
Nanning Guangzhou
High-Speed Railway
Nanning Guangzhou
High-Speed Railway
Nanning Guangzhou
Baotou Xian Railway (China)
The design speed is 160km/h and the total length is 37.05km, including
24.1 km roadbed, 5.9 km bridges (19 nos) and 7.97km tunnel.
Baotou Xian High-
Speed Railway
Baotou Xian High-
Speed Railway
Chengdu Guiyang Railway (China)
The design speed is 250km/h and the length is about 44km, including 15.3 km
road bed, 21.5km bridges (85 nos) and 7.1km tunnels (13 nos).
Chengdu Guiyang
Railway
Chengdu Guiyang
Railway
POWERCHINA
Guiyang-Guangzhou High - Speed Railway (China)
Chinas first high speed railway crossing mountainous region, 83% of
the railway line consists of bridges and tunnels.
Total length: 857km, design speed: 300km/h
Lot GGTJ-10, GGTJ-12 with total length of 75.19 km, including 90
bridges, 32 tunnels and 3 stations.
POWERCHINA
Shenzhen Metro Line 7 BT project (China)
Total length of 30.173 km, including 28 stations, one depot, one
stabling yard
Construction Period: 53 months
Shenzhen Metro
Shenzhen Metro
Chengdu Metro (China)
The length of Chengdu Metro Extension for Phase 2, Line 4 is 10.65km long,
including 8 stations, 1 transformer substation and 9 sections.
Chengdu Metro
POWERCHINA
Haerbin Metro Line 2 Phase I BOT project (China)
Total length of 28.6km, including 19 stations, one depot
Construction Period: 66 months
POWERCHINA
Overseas Project:
North-South High - Speed Railway Line (Morocco)
Civil works contract with a total length of 12 km, design speed of 350
km/h
POWERCHINA
Jakarta to Bandung High - Speed Railway (Indonesia)
The length of project is 142 km, design speed is 350 km/h.
Total Investment: USD 5.5 Billion Construction Period: 3 years
POWERCHINA
Mohan to Vientiane Railway (Laos)
The length of project is 414 km, Design speed is 160 km/h.
Total Investment: USD 6.3 Billion Construction Period: 5 years
POWERCHINA
Overseas Project:
Singapore: MRT Napier Station and Tunnels Thomson Line (T217)
A length of 800m (double directions) tunnel using slurry TBM and one
underground station.
POWERCHINA
Overseas Project:
Singapore: MRT Marina South Station and Tunnels Thomson Line (T227)
A length of 800m (double directions) tunnel using EBP TBM and 750m
(double directions) cut & cover tunnel, one underground station.
POWERCHINA
Overseas Project:
Thailand: MRT Blue Line Extension Project - Contract 3
A length of 11.2km viaducts and 7 elevated stations.
Thailand: The MRT Green Line Project - Contract 2
A length of 6.8 km viaducts and 4 elevated stations.
Part
Financing Capability
POWERCHINA
Financing Model
EPC + Financing, BOT, BOO, BT and PPP
Financing Capability
44% of the total value of the overseas projects currently under
construction are financed by Chinese Banks
Part
Financial Capability
POWERCHINA
Bank Credit
Working Capital
RMB 74 Billion