Time
Now
Changed parameters
the system was changed from booster to boosterless
system
traction transformer resistance was set at more realistic
value
train is represented using Norton equivalent, based on
voltage measurement at Lahat (March 2012)
Parameters that remained the same
train harmonic generation; we are still using Rotem data as
part of the train representation (scaled to line up with
measurements)
132kV data; one of the most critical data sets and we know
it is not complete and contains some anomalies
study methodology; we are still assuming the peak
distortion of every train
Sep 14th, 2004
Ipoh Padang Besar Double Track Project
Bukit
Ketri
(Do
+13 7 uble)
.125
FS
Electrified Double Track Project between
T1 km
T2 Ipoh and Padang Besar
Tu nja
ng
(Dou FS
+104 ble)
148
BI
T1
.550
km
Filter Prediction
T2
PX 150 Guru
14 7 14 9 n FS
P a da (Sin
ng B
e P +56.2 gle)
DFL sar adang B 152 T1 28 k
m
157 .6 esar
30 k Yard 151 TJ
m
154 Tase
k Ge
lu
153 (Dou gor FS
+16.5 b le)
Kod ia KO 1 56 15 k
n T1 m
MP-T g 1 55 GN
+1 1 8 S L T2
.835
158
1 57
Toka TI
1 60
MP-T i 159 TG
+80.9 S L
85 k
m
LEGEND 161
162
Su ng SP
ai P
MP-T etan i
No Filters required +35.9 SL
15 k
m
16 3
Prai
TCBL
Further validation (Agreement) +1.580
M M N/C PY
167 169 171 173 175 177 179 181 183 183 185 187
PR PG KS TK
Parit Buntar Pondok Tanjung Kuala Kangsar Tasek Chainage Break
MP-TSL +179.400 km (RIDT) Batu Gajah Kampar
MP-TSL MP-TSL MP-TSL
+164.085 km +172.361 km (NDT) TSL MP-TSL
+42.560 km +82.040 km +121.055 km
+199.900 km (RIDT) +220.330 km
(RIDT)
Undertake measurements at 25kV and 132kV for one train and multiple
trains on the existing railway to calibrate the model
Simultaneous measurements from train and substation (25kV and 132kV)
Traction transformer impedance measurements
Repeat the harmonics study
Revise the 132kV data and model, as appropriate
Revise the harmonic generation based on measurements
Revise the summation rule based on measurements
Confirm the compliance requirements
Revised study should be undertaken with consideration of particular
requirements for filters design
132kV impedance loci
Complete traction system Norton equivalent for all feeding cases
To be confirmed after above (stage 3b)
Further measurements during NDT commissioning
Conclusions