Вы находитесь на странице: 1из 13

Enhanced Harmonic Study Update

and Preliminary Results


MGJV, BBAS presentation to KSET and KTMB
21st November 2012
Ipoh Padang Besar Double Track Project

Context

Time
Now

Stage 1 Stage 2 Stage 3 Stage 4

Original PSS Enhanced Validation and Specificatio


and Harmonic Harmonic Calibration of n,
Study Study Harmonic Study manufacturi
ng design,
ROTEM train ROTEM train - To validate scaling of
- - manufactur
data used data, scaled to train data (Norton
Equivalent) e, deliver,
- 132 kV data meet
- Traction transformer install
from TNB measured
impedance to be
- Booster distortion measured
system - Boosterless - Train, 25kV and
- Unrealistic system 132kV system
filter - TNB limits measurements
requirement addressed required
- Traction - Confirm
transformer methodology, data and
resistance planning levels with
parameter TNB
more realistic - 3a on existing
railway
- 3b on commissioned
Sep 14th, 2004 NDT (to be confirmed)
Ipoh Padang Besar Double Track Project

Stage 1: original PSS and Harmonic Study


(2009/10)
132kV data from TNB, including background distortion
Limited number of 132kV scenarios (four cases)
Traction transformer data from manufacturer; no Z(f) data
so some parameters assumed
Booster system modelled
25kV system parameters calculated by BBRSE
Rotem harmonic generation data
Methodology based on peak distortion
Compliance based on short time planning levels

Sep 14th, 2004


Ipoh Padang Besar Double Track Project

Requirement for Enhanced Study (Stage 2)

Booster system changed to boosterless system


Unrealistic voltage distortion and filtering requirement
from results of Stage 1 Power System Study / Harmonic
Study

Sep 14th, 2004


Ipoh Padang Besar Double Track Project

Stage 2: Enhanced Study

132kV data from TNB still remains, including background distortion


Traction transformer frequency parameters changed in line with
more relevant literature
Booster system changed to boosterless system; 25kV system
parameters re-calculated by BBRSE
Rotem harmonic generation data validation by measurements
Methodology still based on peak distortion
Compliance based on very short time planning levels

Sep 14th, 2004


Ipoh Padang Besar Double Track Project

Stage 2: Enhanced Study Results

Changed parameters
the system was changed from booster to boosterless
system
traction transformer resistance was set at more realistic
value
train is represented using Norton equivalent, based on
voltage measurement at Lahat (March 2012)
Parameters that remained the same
train harmonic generation; we are still using Rotem data as
part of the train representation (scaled to line up with
measurements)
132kV data; one of the most critical data sets and we know
it is not complete and contains some anomalies
study methodology; we are still assuming the peak
distortion of every train
Sep 14th, 2004
Ipoh Padang Besar Double Track Project

Stage 2: Enhanced Study results


comparison with original PSS
TO DEMONSTRATE THE DIFFERENCE EXAMINE THE NORMAL FEEDING

Results of Enhanced Harmonic Study

Sep 14th, 2004


Ipoh Padang Besar Double Track Project

Stage 2: Enhanced Study Results comparison


with original PSS
The harmonic voltage distortion levels calculated have dropped
dramatically
Some sites require different types of filters (reduced number of
excessive harmonics)
Some sites do not require filters at all

The final recommendation on whether to fit or not to fit filters at locations


which are marginal should be made on a risk-based analysis including:
The number and magnitude of exceedences
The cases in which exceedences occur likelihood
Final arrangements to be discussed with TNB and KTMB

Sep 14th, 2004


Ipoh Padang Besar Double Track Project

Indicative Requirements for Filters

Bukit
Ketri
(Do
+13 7 uble)
.125
FS
Electrified Double Track Project between
T1 km
T2 Ipoh and Padang Besar
Tu nja
ng
(Dou FS
+104 ble)
148
BI
T1
.550
km
Filter Prediction
T2
PX 150 Guru
14 7 14 9 n FS
P a da (Sin
ng B
e P +56.2 gle)
DFL sar adang B 152 T1 28 k
m
157 .6 esar
30 k Yard 151 TJ
m
154 Tase
k Ge
lu
153 (Dou gor FS
+16.5 b le)
Kod ia KO 1 56 15 k
n T1 m
MP-T g 1 55 GN
+1 1 8 S L T2
.835
158
1 57
Toka TI
1 60
MP-T i 159 TG
+80.9 S L
85 k
m
LEGEND 161
162

Su ng SP
ai P
MP-T etan i
No Filters required +35.9 SL
15 k
m
16 3

Prai
TCBL
Further validation (Agreement) +1.580
M M N/C PY

Filters Required 166 166 166 168

N/O 165 165 165 167


Butterworth Prai 164 CONTD
M M N/O N/C BM
Motorised Isolator M Swing Bridge N/C
+0.000 km +1.200 km Bkt. Tengah Yard Bukit Mertajam
+6.900 Bkt. Tengah MP-TSL
DFL +12.066 km (Main Line)
Simpang Ampat FS Bukit Merah FS Taiping FS Sungai Siput FS +0.066 km (Kedah Line)
(Double) +7.250
(Double) (Double) (Double)
+20.310 km +65.125 km +99.635 km +141.675 km Existing
Lahat FS
T1 T2 T1 T2 T1 T2 T1 T2 (Upgrade from
T1 T2
Single to Double)
+190.600 km (RIDT)
SC LH Batu Gajah Depot
SM BR TN
CONTD
168 170 172 174 176 178 180 182 184 184 186 188

167 169 171 173 175 177 179 181 183 183 185 187

PR PG KS TK
Parit Buntar Pondok Tanjung Kuala Kangsar Tasek Chainage Break
MP-TSL +179.400 km (RIDT) Batu Gajah Kampar
MP-TSL MP-TSL MP-TSL
+164.085 km +172.361 km (NDT) TSL MP-TSL
+42.560 km +82.040 km +121.055 km
+199.900 km (RIDT) +220.330 km
(RIDT)

Sep 14th, 2004


Ipoh Padang Besar Double Track Project

Stage 3: validate the study predictions

Undertake measurements at 25kV and 132kV for one train and multiple
trains on the existing railway to calibrate the model
Simultaneous measurements from train and substation (25kV and 132kV)
Traction transformer impedance measurements
Repeat the harmonics study
Revise the 132kV data and model, as appropriate
Revise the harmonic generation based on measurements
Revise the summation rule based on measurements
Confirm the compliance requirements
Revised study should be undertaken with consideration of particular
requirements for filters design
132kV impedance loci
Complete traction system Norton equivalent for all feeding cases
To be confirmed after above (stage 3b)
Further measurements during NDT commissioning

Sep 14th, 2004


Ipoh Padang Besar Double Track Project

Stage 4: design and procure filters

Firm up design parameters


132kV impedance loci
132kV background distortion
Traction transformer parameters
Complete Norton equivalent for each case
Confirm compliance requirements
Procurement specification
Complete the filter design
Manufacture and install filters

Sep 14th, 2004


Ipoh Padang Besar Double Track Project

Stage 4: implementation programme

Sep 14th, 2004


Ipoh Padang Besar Double Track Project

Conclusions

All sites show significat filter reduction, with further improvements


expecteed
Enhanced Harmonic Study is being improved and is now showing more
realistic results, with more robust parameters and methodology
Methodology and application of limits to be confirmed (TNB)
Validation required which will entail further measurements train, 25kV,
132kV and traction transformer impedance
Procurement process has commenced
Validation process will be complete in time for commencement of
specification and detail design of filters, subject to testing taking place

Sep 14th, 2004