ENERGY
Field Development
Plan
Presentation
Company Profile
TIMBUNAN Shazreena
ENERGY General Manager
MISSION
To deliver the safest, most economical and reliable engineering solutions in developing Gelama Merah field to its maximum extent.
To provide the team members a steady platform for a knowledgeable, creative and competitive working environment.
VISION
Delivering Solutions
Reservoir Engineering
Reservoir & Hydrocarbon Classification
Reservoir Fluid Study Report: Compositional Analysis:
Reported Reservoir Conditions Component Mole %
N2 2.43
Reservoir Pressure ................................... 2116 psia
CO2 0.94
Reservoir Temperature 115 F
C1 26.50
Constant Composition Expansion
C2 2.63
Bubble Point Pressure ............................. 2014 psig C3 0.45
i-C4 0.15
Differential Vaporization Test
(at 2014 psig and 115 F) n-C4 0.22
i-C5 0.13
Oil Formation Volume Factor ................... 1.169 bbl/stb
Solution Gas Oil Ratio 336 scf/stb n-C5 0.13
Oil Density . 0.828 g/cc C6 0.43
C7 2.95
Pi > Pb
C8 4.18
C9 2.90
C10 4.48
C11+ 51.49
Total 100.00 Gas Condensate
Undersaturated Oil
Reservoir
Fluid contact & Datum depth
MDT Pressure Plot
Depth ft
Pressure psia
Reservoir Fluid & Rock Study
Oil Gas Water
Density 0.829 g/cc Density 6.82 lb/ft3 Water formation volume 1.0138
Specific gravity 0.83 Specific gravity 0.65 factor
oAPI 39.71 Viscosity 0.18 cp Gas solubility in water 20.2327
Viscosity 1.35 cp Compressibility 6.58E-4 psi-1 Water compressibility 2.99556E-06
Compressibility 7.225E-06 psi-1 Formation volume factor 7.438E-3 Water viscosity 0.4434
Formation volume factor 1.1678 bbl/stb Solution Gas/Oil Ratio 336 scf/stb
Solution Gas/Oil Ratio 336 scf/stb
Porosity 0.351585
Permeability md 140
30000000
Sensitivity Analysis
25000000
20000000 Plan A B C
15000000
No of production well 8 8 8
10000000
No of injection well 2 3 3
5000000
0
Drainage area 1000ft 1000ft 1000ft
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Type of Injection water water gas
Number of well
FOPT (STB) 5.16E+07 5.29E+07 5.22E+07
FOPR Not good Good Not Good
Optimum production well: 8 FGPT (Mscf) 2.43E+08 2.83E+08 2.85E+08
FGPR Not good Not good Not Good
Over 20 years production
Recovery factor % 22 25 23
Well Development Planning
Well location planning
Bubble Map
3 plan different location
I1
I2
I3
Drive Mechanism
Rock & Liquid Expansion
Gravity
Drainage
Reservoir Simulation