Академический Документы
Профессиональный Документы
Культура Документы
Introduction Conclusions
Combat
Systems
Hull
Logistics
Flight
Deck
Propulsion Electrical
TSSE Courses
Systems Engineering Principles and Process
Integration Processes and Techniques
Team Members
LT Luis Alvarez, USN LTJG Korkut Murat, Turkish Navy
LT Jihed Boulares, Tunisia Navy LT Koray Savur, Turkish Navy
MAJ Keng-Shin Chong, RSN LT Matt Steeno, USN
LT Lynn Fodrea, USN MAJ Chong-Ann Teh, RSN
LT Brian Higgins, USCG LT Dwight Warnock, USN
LT Seth Miller, USN
Chris Wagner
Chris Wagner
Chris Wagner
Chris Wagner
Chris Wagner
Chris Wagner
Chris Wagner
Chris Wagner
Chris Wagner
25 250 nm
Pre-position base or
friendly port outside of
theater of operation
Total Ship Systems Engineering
Sea-Force Presentation Outline
Introduction Conclusions
Combat
Systems
Hull
Logistics
Flight
Deck
Propulsion Electrical
5
4.8
4.6
4.4
4.2
4
3.8
3.6
3.4
Amphibious C4ISR FSO Logistics Operational Total Score
Warfare Concept
Introduction Conclusions
Combat
Systems
Hull
Logistics
Flight
Deck
Propulsion Electrical
Global Security.org
Nigel Gee and Associates Ltd.
Flood Length L
e
n
500.0 g
t
h
f
400.0 t
300.0
200.0
100.0
0.0
TOTAL 87448
Total Ship Systems Engineering
Structural calculations:
Longitudinal stress
Longitudinal Stre ngth
<---Aft (Fee t) Fw d--->
1000 .0a 500.0 a 0.0a
100.0
Wei g ht x 1.5
Pt Load x 3.0
Bu oy. x 1.5
Sh ear x 140.0
B. M . x 39000 .0
50.0
0.0
-50.0
-100. 0
Introduction Conclusions
Combat
Systems
Hull
Logistics
Flight
Deck
Propulsion Electrical
Aircraft
Minimize Manning
1B
5B
4B
3B
2B
1
6
1A
2A
4A
3A
5A
Introduction Conclusions
Combat
Systems
Hull
Logistics
Flight
Deck
Propulsion Electrical
Diesel engines
Fuel cells
Gas turbines
Total Ship Systems Engineering
Speed versus Power Diagram
SPEED VS POWER
250000
223800
200000
POWER (HP)
150000
125000
100000
74000
42400
50000
20920
26850
0
0 5 10 15 20 25 30 35
SPEED (KNTS)
0.5
0.48
0.46
0.44
0.42
SFC
0.4
0.38
0.36
0.34
0.32
0.3
0 5 10 15 20 25 30 35
s pe e d
LM2500+ LM6000
31
7.6
7.55 30.5
7.5
30
7.45
7.4
29.5
7.35
7.3 29
4 LM6000 3 LM 6000 5 LM 2500+ 4 LM6000 3 LM 6000 1 5 LM 2500+
1 LM2500+ LM2500+
SELECTION: 40 MW HTS
SUPERCONDUCTING AC
MOTOR WITH THE
PROMISING
TECHNOLOGY
Introduction Conclusions
Combat
Systems
Hull
Logistics
Flight
Deck
Propulsion Electrical
IPS architecture
Ship divided to 15 zones
Combined AC and DC zonal electrical distribution
system
4 buses (2) 4160V AC and (2) 1100V DC
2 above the water line and 2 below the waterline
2 in the port and 2 in the starboard.
Step down
XFRM SSCM -SSCM:dc-dc converter
450 VAC 1100v/900v
(2 per zone 1 providing
PORT 900V SSCM sensitive power the other ready for
nonsensitive 900v/110v DC load backup)
Nonvital load
SSIM -SSIM:dc-ac inverter
900DC/450AC sensitive
60HZ Vital load
nonsensitive
Vital load
SSIM Sensitive
900DC/450AC Vital load
60HZ
Sensitive
STBD SSIM AC load
850V
nonsensitive
Nonvital PWR
Circuit breakers
450 VAC SSCM
Step down 1100v/850v Diode auctioneering
XFRM
1100/1000VDc
EM1 PMM
podded AC/AC
EM2
PMM
podded AC/AC
PCM3
PCM2 PM3 G3
PCM1 PM2 G2 AC/DC
EM3 PM1 G1 AC/DC
PMM AC/DC
podded AC/AC
EM4 PMM
podded AC/AC
Introduction Conclusions
Combat
Systems
Hull
Logistics
Flight
Deck
Propulsion Electrical
Hose
Tankage
Rigs
Or Ship to be
supplied
Ref: Sea-Base Sustainment Conference 02 NSWC Port Hueneme Division
Total Ship Systems Engineering
Supply handling nodes and paths
58 ft
195 ft
4th Deck
Magazine
s 3 and 4
for a total Magazine # 4 Magazine # 3 60 ft 80 ft
of 956
pallets.
30 % workload
reduction over current
systems.
20 % weight
reduction.
20 % power
consumption
reduction.
Stowage Position /
90 ft
Crane
Crane Rails
`
Access
to Hangar Traverse
Longtitudinally
Access Lanes
Hangar Bay &
along Rails
For
Access to
Overhead Crane
LCUs
Omi-Directional Vehicles
& forklifts
305 ft
Introduction Conclusions
Combat
Systems
Hull
Logistics
Flight
Deck
Propulsion Electrical
Four mounts operated NMT two at a time (port or starboard) due to power
requirements
Embarked Aircraft
Joint Strike Fighter could be utilized
Range: Up to 4 km
3 Mounts (Port, Starboard and Bow)
Systems for employment include (Year 2020 Generation): Long Term Mine
Reconnaissance System (LMRS), Remote Mine Hunting System (RMS),
Enhanced Mine Neutralization System (EMNS)
Equipment is easily mounted into embarked assets such as the SH-60 or MV-22
configured aircraft
Systems for employment include (Year 2020 Generation): Airborne Laser Mine
Detection System (ALMDS), Rapid Airborne Mine Clearance Systems (RAMICS)
Utilize Unmanned Undersea Vehicles (UUVs) and dipping sonar from embarked
SH-60F or MV-22 configured aircraft.
Utilize year 2020 generation MK50 torpedoes launched from SH-60 or MV-22
configured aircraft.
Other Battle Group assets will be required for any other operation than basic self-
defense (i.e. ships, aircraft and submarines).
Introduction Conclusions
Combat
Systems
Hull
Logistics
Flight
Deck
Propulsion Electrical
Berthing Modules
80 total
30 Navy Ofcr/Enl
50 USMC Ofcr/Enl
Medical/Third echelon
afloat care
500 bed hospital
6 operating rooms
1 pharmacy.
Introduction Conclusions
Combat
Systems
Hull
Logistics
Flight
Deck
Propulsion Electrical