Вы находитесь на странице: 1из 10

Hybrid Solar Power System

GRID

INTERLOCK
DG SET
OPTIONAL

Condition # 1
Solar present, Grid available.
Battery Charged through MPPT charger + mains Load
supplied through Grid.
AC LOADS AC LOADS
CHARGING (Priority) (Others)
Hybrid Solar Power System

GRID

INTERLOCK
DG SET
OPTIONAL

Saving of electricity bills.

Condition # 2
SPV available, Grid available
Battery almost charged
Surplus PV power used for AC loads connected, only
differential electricity drawn from Grid AC LOADS AC LOADS
CHARGED (Priority) (Others)
Hybrid Solar Power System

GRID

INTERLOCK
DG SET
OPTIONAL

Condition # 3
SPV available, Grid available,
Battery almost charged,
ZERO or very Little load: EXCESS POWER
TO GRID AC LOADS AC LOADS
CHARGED Pays You Back! (Priority) (Others)
Hybrid Solar Power System

GRID

INTERLOCK
DG SET
OPTIONAL

Condition # 4
SPV available, Grid unavailable,
Battery almost charged,
surplus PV power+ Battery used for
AC loads (priority) connected. AC LOADS AC LOADS
(Priority) (Others)
DISCHARGING
Hybrid Solar Power System

GRID

DG SET
INTERLOCK
ON

Export Control

Condition # 5
Solar available. Grid not available,
Battery LOW, DG STARTED, Automatic Sync.
And load sharing Of inverter with DG AC LOADS AC LOADS
CHARGING (Priority) (Others)
Hybrid Solar Power System

GRID

DG SET
INTERLOCK
ON
W=0
Export Control

Condition # 6
Solar available. Grid not available,
DG Automatic Sync. with inverter and load less
than PV Power available. AC LOADS AC LOADS
CHARGING No Power into DG (Priority) (Others)
Hybrid Solar Power System

GRID

INTERLOCK
DG SET
OPTIONAL

Condition # 7
Low PV available (or absent)
Grid absent. AC Load (priority)
Supplied through stored battery energy AC LOADS AC LOADS
(Priority) (Others)
DISCHARGING
Hybrid Solar Power System

GRID

INTERLOCK
DG SET
ON

P= (P2+P3)+P1
P1
P2 P3

Condition # 8
SPV not available. Grid available, Battery
charging through grid, Load supplied through
Grid, Optional Time based grid charging of
battery also available AC LOADS AC LOADS
CHARGING (Priority) (Others)
Hybrid Solar Power System

GRID

INTERLOCK
DG SET
ON

P1

Condition # 9
SPV not available. Grid not available,
Battery charging through DG SET,
Load supplied through DG SET. AC LOADS AC LOADS
CHARGING (Priority) (Others)
GRID

Battery based
Inverter DG SET
INTERLOCK
ON

P1
INTERLOCK

String
Inverter

AC LOADS

AC COUPLED HIGH LOAD FACTOR SOLUTION

Вам также может понравиться