KPI SCOR ASSETS SCORING & COMMENTS
T
E
Scoring: 5.5% per asset
Safety Critical Elements (SCE) Asset Bahja, Yibal
4 Oil, Qarn Comments: This exercise will ensure that all the SCEs have been
register verification complete and Assets
22
Alam Gas & identified in the Asset register for all hardware barriers and are
implemented Fahud identified against their SCE group. It will also ensure that
performance standards are established.
Number of interior ops staff to SCORING: <560=0, 560=16, 630=17, 700=18, 770=19, 840=20,
complete role related AI-PSM OND, OSD, 910=21, 980=22
840
competences as defined by PR-1029 (60%) 22 GD & UID COMMENTS: As per minimum requirement of competency matrix
(Competence Assessment & Assets within PR-1029 (including electrical and instrument). Total
Assurance) population 1404.
Scoring: 4.4% per asset
Marmul,
Completion of Level 2 self Fahud,
5 Comments: This is meant to asess the adequacy & effectiveness
assessments and cross-directorate Assets
22 Yibal,
SNGP, of the implementation of AI-PSM requirements. The audit will be
audits
MOL/SOGL conducted using the PDO HSE Audit methodology (independently
led or supported).
Scoring: 16=0%, 15=5%,14=10%, 13=15%, 12=20%, 11=20.5%,
10=21%, 9=21.5%, 8=22%
High risk well integrity issues in
<12 22 PDO wells
eWIMS across PDO by year-end Comments: Any well with Action Code 9 or 10 or any Type 1 well
not in compliance with the WFM or with approved deviation from
standard in place.
Scoring (outstanding and non-deviated reds): >10=0%, 6-
Assessment of RED anomalies in 10=14%, 1-5=18%, 0=22%
PACER/CIRRAS & corrective work Comments: Process Containment is one of the key control
orders established for those related 0 22 All PDO hardware barriers. This KPI is designed to drive behaviors in the
to SCE. Deviations to be raised in organization not to accept RED anomalies without assessment
FSR (as per PR-1983) and SAP corrective work orders and reflection in FSR. Deviation to
be raised where required. TDG10th of December 2011
TOTAL (Target:100) 110
2012 AI-PSM KPI
No. Type Scorecard KPI short Description KPI long description Tracking method Reporting Level Accountable Supporting Minimum AI-PS Element
Party Party Frequency
1 Lagging No Tier 1 Process Safety Count of API RP 754 Record maintained by TBC and below GD, OND, OSD, MSEM Quarterly Incident
Event (PSE) Tier 1 Process Safety AIPSALT, based on UID, UWD, XD Reporting &
Events (PSEs) analysis of reported AI- Investigation
PS incidents in FIM
2 Lagging No Days since last Tier 1 Time since last API RP Record maintained by TDG and below GD, OND, OSD, MSEM Quarterly Incident
Process Safety Event 754 Tier 1 Process AIPSALT, based on UID, UWD, XD Reporting &
Safety Events analysis of reported AI- Investigation
PS incidents in FIM
3 Journey Yes High Risk Wells Number of high risk eWIMS reporting TBC and below GD, OND, OSD, UPD Quarterly Technical
well integrity issues in UID, XD Integrity
eWIMS
4 Journey Yes Red Anomalies in Number of RED PACER/CIRRAS TBC and below GD, OND, OSD, UEOD Quarterly Technical
PACER anomalies in download UID Integrity
PACER/CIRRAS.
5 Leading No SCE PM Compliance Technical Integrity Existing KPI TDG and below GD, OND, OSD, UEOD Quarterly Technical
Planned Maintenance UID Integrity
Compliance (%
completed against
plan)
6 Leading No SCE CM Compliance Technical Integrity Existing KPI TDG and below GD, OND, OSD, UEOD Quarterly Technical
Corrective UID Integrity
Maintenance
Compliance (%
completed against
plan)
7 Journey Yes SCE Asset Register % completion of asset UOIM asset register TDG and below GD, OND, OSD, UEOD Quarterly Process Safety
Verification register verification verification project UID Knowledge
project (by asset) status report
8 Journey Yes AI-PS As Built Drawing % completion of as- Project status TDG and below GD, OND, OSD, UEOD Quarterly Process Safety
Updates built drawing update reported by asset UID Knowledge
project (by asset) operations support
team