Вы находитесь на странице: 1из 67

Automation

in
Water Treatment Plant
Systems
Loo Shu Pey
Business Development Manager

FESTO Malaysia

E-Mail.: shu_pey_loo@festo.com
Phone : 012 2383782

ABTEILUNG/Name
Festo the Company

Headquarters Esslingen (near Stuttgart)


Established 1925
own companies in 52 countries world wide
Approved dealers in further 36 countries
Service and support in 176 countries world wide
Turnover 1.2 billion Euro
Export 55%
Employees 10,050
Investment in R & D 7%

ABTEILUNG/Name
Festo the Company

Customer Service Centre St. Ingbert-Rohrbach


world wide delivery volume 6,500,000 items/year
approx. 29,000/day
over 70 tonnes/day

ABTEILUNG/Name
Festo Malaysia

HQ in Kuala Lumpur with Branches at Penang,


Ipoh, Malacca and Johor Baru.
Extablish in 1978.
80 employees with 50% technical staff.
ISO 9000 Certified Company

ABTEILUNG/Name
Existing Technology

ABTEILUNG/Name
Pneumatic technology

ABTEILUNG/Name 6
Pneumatic Solution Gate Valve

47,000 N @ 6bar air


supply

ABTEILUNG/Name
Pneumatic Solution Penstock Valve

47,000 N @ 6bar air supply

ABTEILUNG/Name
Pneumatic Solution Butterfly Valve

8,800 Nm @ 6bar air supply

ABTEILUNG/Name
Pneumatic Actuators
Function

ABTEILUNG/Name
Comparison
Electrical vs Pneumatic

ABTEILUNG/Name
Control of process valves by using pneumatic
actuators
State of the art Advanced technology with FESTO
with controllable electrical actuators controllable actuators
Linear and rotary actuation

ABTEILUNG/Name
Electric actuator -HV power cable / 415V/50Hz 3-phase
- 5 cables

-Control cable max. 24V/DC


-3 x overheat detectors / electrical winding
-2 x 2 torque switch
-2 x 2 mechanical limit switch
-1 x flasher unit for running indication

ABTEILUNG/Name
Pneumatic actuator -Air-connection from ring-main
-tubing of plastics / metallic

-Control cable max. 24V/DC


-2 x 2 mechanical/proximity limit switch
-1 x 2 solenoid valve

ABTEILUNG/Name
Electrical / pneumatic connection
6 bar
3-phase Compressed Air
Power supply 415VAC supply
(5 core) (2 tubes)
Control Control
Cable Cable , 24VDC
(min. 12 cores) (2 cores)

ABTEILUNG/Name
Electrical / pneumatic connection

Power Cable
Amour Cable 4 X 2.5 mm (min)

Control Cable
Electrical Actuators
Amour Cable 12 X 2.0 mm
ABTEILUNG/Name (min)
Electrical / pneumatic connection
Sensors 24VDC
Pneumatic Cable Sensor Box
Actuator

Festo Polymer Tubing

Festo Pneumatic Actuators


ABTEILUNG/Name
Number of motors

If we want to operate 48 units of butterfly valves,

For electrical actuators solution:-


You need to operate 48 units of motors.
415AC

If we want to operate 48 units of butterfly valves,


For pneumatic actuators solution:-
You only need 2 units of motors.

2 units of compressors 24VDC


ABTEILUNG/Name
Cost structure of systems : Electric / Pneumatic
actuators + logic control
in
Investment

Basic price
for
Valve-terminal

Pneumatic
Valves in
Valve-terminal

No of Process Valves / Actuators

ABTEILUNG/Name
Pneumatic actuator sealing system

Complete piston with slide


ring
Pressure compensation slots for pressure reduction
Cylinder diameter e.g. DN
160
Slide-strap
Sealing
Sealing
End position damper

Form geometrical seat Pressure activating slot


Piston of Al-alloy
Static O-ring sealing

ABTEILUNG/Name
Pneumatic actuator

Festo Pneumatic Linear Festo Pneumatic Quator


Actuator Turn Actuator
ABTEILUNG/Name
Closing / Opening
time ON 2 sec.
OFF 20 sec. Adjustable !!
Drive speed +
Re-adjustable
Fixed !! output speed
output speed BOTH
+ directions
Frequency controller independant
required
for speed change

Minimum Closing time Minimum Closing time


Knife-Gate Knife-Gate
DN 200 = 30 sec. DN 200 = 2 sec.
ABTEILUNG/Name
ON OFF / Control actuator &
guaranteed mechanical life- time

ON-OFF Control ON-OFF & Control


-20,000 cycle -200,000 cycle -2,000,000 Cycle
-25% duty cycle + add price -25% duty cycle -100% Duty cycle

1 actuator design

ABTEILUNG/Name
ON OFF actuator Control actuator

ABTEILUNG/Name
Power failure
Energy / power failure Configurable
Safety Position
Either control & / or 1. ON
Power supply failure 2. OFF
= STOP 3. Hold

Manual

Knife- Gate DN 200


Requires min.
16 x 40 = 640
Turns on the
handwheel

ABTEILUNG/Name
Enclosure on PA actuators requires fully
encapsulated actuators to IP 67

- Heat up -IP 68
-Limited cycle duty with unlimited under water
- 20.000 ON-OFF Installation
-200.000 Control
-Permanent heating required -No temperature influence
because of condensation -No influence by moisture
- No internal corrosion protection
- IP subjected to strict conditions

ABTEILUNG/Name
Protection again Lightning

-Not sensitive to lightning.

-Only solenoid coil damage


=
-Electrical and Electronic component
Very Economical
are very sensitive to lightning
=
-Can still run on secondary
Very Expensive
pneumatic supply
-Permanently cannot function
ABTEILUNG/Name
Explosive atmospheres

Requires special Standrad


Devices Equipment
WITH =
& adder price Ex safe
Certified (ATEX)
NO
Adder pricing

ABTEILUNG/Name
Maintenance + wear & tear

Maintenance:
-Maintenance Free
Maintenance: -No battery required
-Lubrication of gearing -No lubrication required
+ cleaning of spindle thread Oil/grease free
-Water Condensation check
-Regular change of Oil Sealing
-Back up battery replacement

NO contamination
of
Water

ABTEILUNG/Name
Spare Part

Electrical actuator Pneumatic actuator

ABTEILUNG/Name
Control System for Electrical Actuator

Isolator Panel for Electrical actuator LCP for Electrical actuator


ABTEILUNG/Name
Control System for Pneumatic Actuators

LCP for Pneumatic actuators Control system for Pneumatic actuators


ABTEILUNG/Name
Friction losses
-Tremendous increase of torque requirements -Piston sealing = pressure dependent
at non- lubricated spindles -1 force/direction
= mechanical damage -Oil- free = NON SLIP STICK
-Torque switch required to prevent motor overload -Exact force determination
- NO Overloading

Low efficiency
with
similar losses
+ High efficiency
wear / tear with
all over the stroke lowest losses
+
less wear / tear
all over the stroke

ABTEILUNG/Name
Settings of end positions Torque / Force
adjustment
by
pressure regulator
NO-LIMIT rotary / multi turn actuator

-Required skillful and


trained personnel
-Adjustment & setting must Adjustable
be perfect mechanical
End - stop

ABTEILUNG/Name
Process Valve connection

ISO 5211
with
Rendered interchangeability

identical

ABTEILUNG/Name
Failure detection
Skilled & trained electricians
needed to check the circuits No special skills required
for failure detection Detection either by
-High Voltage (415 Vac) Air- blow
(DANGEROUS) Or
LED indication
NO
Special measuring
devices
- Low Voltage (24Vdc)
(SAFE)

ABTEILUNG/Name
Profibus dp
Bus Communication for E-Actuator
Connection to PLC
via
400 V/50Hz - AC -Profibus dp

Bus - Interface

&
-Plug socket connector
-Relais board
-Power supply board
-Fuse board

&
Required for every
Single actuator
- -

ABTEILUNG/Name
Bus Communication for P-Actuator Profibus dp

Compressed air 6 bar

+ Hart protocol
Measurement datas :
- Level 4-20 mA
- Pressure 0-10 V
- Flow 4-20 mA
ABTEILUNG/Name
Torque values correlating to size of actuator

Nm 30 60 120 250 500

10 30 45 60 65 80 106 120 170 180 230 240 300 360 470 480 550 670 84

ABTEILUNG/Name
Price comparison

Nm 30 60 120 250 500

10 30 45 60 65 80 106 120 170 180 230 240 300 360 470 480 550 670 84

ABTEILUNG/Name
Valve Size DN
Required torque value - Nm

(Butterfly-Valve)
1200 600

900 Pneumatic actuator 500

400 400

300 300

200 200

100 100

40 Electric actuator 50

20 25
1.000

1.500

2.000

2.500
250

500
50

Price / actuator ()

ABTEILUNG/Name
Festo Pneumatic System

ABTEILUNG/Name
Festo Valve Terminal
1.Electric
Digital : I/O
Analogue : I/O
3.Control
Communication
Interface
-Multipole
-Bus
-........ 2.Pneumatic
Pneumatic Valves
Various combinations
3/2 ; 5/2 ; 5/3 .......
Module for pneumatic connection
ABTEILUNG/Name
Modbus connection

ABTEILUNG/Name 46
Profibus DP connection

ABTEILUNG/Name 47
Control of pneumatic / electric sub systems and .......
Profibus dp
Connection to PLC
via
-Profibus dp

Measurement datas :
- Level 4-20 mA
+ Hart protocol

- Pressure 0-10 V
Record of all
- Flow 4-20 mA
limit switches

Segment coupler
- digital inputs-

Profibus PA

Pneumatic supply :
Control Line :
PLC / BUS Cable:

ABTEILUNG/Name
.... Electric devices as pumps, actuators ............. As
controller
Connection to PLC
via
-Profibus dp
Pumps Control:

Electric actuators
Electric devices :

Pneumatic supply :
Control Line :
PLC / BUS Cable:

ABTEILUNG/Name
Pneumatically controlled circuit/using 1 Valve Terminal for
1 Filter ELECTRICAL SIDE PNEUMATIC SIDE

Measurement datas : Clean Back Wash Back


- Level Raw Water Water Water Wash Air
- Pressure
( 3 AI + 1 AO )

Sludge Water Emptying Exhaust Filter


Record of all
limit switches
Manual push buttons for : ( 16 DI )
- Backwash
- Auto / Manual
- Funktion selection Exhaust
( 12 DI + 6 DO ) Filter bottom
ABTEILUNG/Name
Festo Solutions in water Treatment Plant Control

Connection between Festo Profibus


Valve Terminal and Pneumatic Actuator

ABTEILUNG/Name
Field-based logical control
PLC,Fieldbus ......
- Bus Structure &
- Multipin structure

Sandfilter X Sandfilter Y

ABTEILUNG/Name
Pneumatic connection 2 GI Pipe-For Main
Compressed Air

On Off 1 inch Local Control Panel


valve Remote/Local Mode Inlet
Penstock

Service Unit Regulate


and filter condensate
Water
Polymer
Tubing

Drain
Penstock

Filtered Filtered
Water Valve Water Valve
Air Scour Air Scour
Valve Valve
Wash Water Wash Water
Valve Valve
ABTEILUNG/Name
Bus Structure
e.g. Profibus DP
4-wire system
(Profibus EN 50170)

ABTEILUNG/Name
PROPOSE AUTO CONTROL LAYOUT
Wash Water Tank (Level
Compressor Room Control)
Exiting Blowers (Compressor Control)
System

Wash Water Tank

All level sensors


Main for filter bed tanks
Color Touch Screen PLC

Filter Bed No.1 Filter Bed No.2 Filter Bed No.3 Filter Bed No.4 Filter Bed No.5 Filter Bed No.6 Filter Bed No.7 Filter Bed No.8

ABTEILUNG/Name
Water Treatment Plant Control System Overview
Plant 1 Plant 2 Plant 3
Filter bed Filter bed Filter bed Filter bed
1 4 1 4 Filter bed 1

Filter bed Filter bed Desludge and Wash Filter bed Filter bed Desludge and Wash
Filter bed 2 Desludge and Wash water
2 5 water 2 5 water

Filter bed Filter bed Filter bed Filter bed Filter bed 3
3 6 3 6

Color Touch
Color Touch Color Touch
Screen
Screen Screen
Main
Main Main
PLC
PLC PLC

Hub Hub
Hub

TCP/IP

TCP/IP
Compressor
Hub
Room

ABTEILUNG/Name
Automation with pneumatics a technical and
commercial useful alternative
Process leading system

Ethernet

local SPS / PLC


Fieldbus Fieldbus

ABTEILUNG/Name
Communication possibilities
- Remote without cabling
via GSM module
- Cable connection
- Ethernet connection and .

Remote diagnostics possibilty

ABTEILUNG/Name
Benefits of using pneumatic WITH Bus communication
Tremendous reduction
- of I/O s
- bus nodes in the field Save Field Cabling
- bus cables from field to PLC
- using of diagnostic software for diagnosis top-down
- EEx safety only where necessary
complete electronic controls outside in non- EEx
areas
- combination of bus systems applied to the required solution

ABTEILUNG/Name
Pre-assembled

Process Valve
Controls

for ease of use and


installation

ABTEILUNG/Name
Control cabinet (cubicle) pre assembled

ABTEILUNG/Name
Controller for 12 pneumatic
process valves !
Including :
Stainless steel cabinet
Typ CPV-10 valve terminal with :
8 x 3/2 solenoid valves
4 x 5/2 solenoid valves
Profibus-DP Fieldbus
Power supply
Service unit, preassure switches
8x Flow control valves
Connectors
Ready to use
Complete tested
Documentation

ABTEILUNG/Name
Compressor system for
water treatment plants

ABTEILUNG/Name
Compressed air circuit
PLC, Bus ...
Generation and Preparation

8.5 bar

6.0 bar

Compressor Storage Dryer

Outside area

Dryer

ABTEILUNG/Name
Compressed air network for water treatment plant
Storage PLC, Bus ...

Dryer 1

8.5 bar
Compressor 1
6.0 bar

Compressor 2
Dryer 2
LCP

ABTEILUNG/Name 65
Compressor installation in
a water plant

Compressor station

2 Compressors, redundant
Capacity / supply each 1 m/h

2 Expansion tanks each 1 m

Air expansion tanks are useful for


Running the water plant
for approximately 1 h