Agenda
About Organization
GRP Pipes
Transportation and handling of GRP Pipes
Storage of GRP Pipes
GRP Pipe Joining Systems
Joint Methods
Testing
General Safety Recommendations
Personal Hygiene
Field Hydro Testing of Above Ground Pipes
Causes for pressure drop Hydro Testing
Statutory Documents
Client Details
Email:info@cesl.in
Web:www.cesl.in
AMIBITION
1. Goal / Vision
2. About partners
3. Experience
4. Achievements in few lines
5. Market Share
Email:info@cesl.in
Web:www.cesl.in
About Organization
Email:info@cesl.in
Web:www.cesl.in
About Organization
Supervisors Supervisors
Quality Team
&
Additional Technicians
Technicians Technicians
Email:info@cesl.in
Web:www.cesl.in
GRP Pipes
GRP piping systems are time tested and its proven their durability and value in
stony environments and brutal applications for decades
Long life:
It has a minimum life of 50 years. The smooth inner surface is maintained
throughout the entire life of the pipe.
Cost effective:
10 % -15 % cheaper than steel pipes & 20% - 30% percent cheaper than pre-
stressed cement concrete pipes.
Light weight:
GRP pipes weights only 25 % as much as similar steel pipe and 10 % as much as
similar concrete product. GRP pipes are light weighted, hence easier handling,
faster installation and low transportation costs. The use of heavy equipment is
practically eliminated.
Email:info@cesl.in
Web:www.cesl.in
GRP Pipes
Dimension stability:
GRP piping system can maintain the required critical tolerances of the most
demanding structural and piping application. The materials need the most
stringent material stiffness and dimensional tolerance.
Strength to weight ratio:
The GRP pipe has excellent strength to weight properties. When the ratio of
strength per unit of weight is considered, GRP composites surpass iron, mild steel,
HDPE (High-density polyethylene) and PVC (Poly Vinyl Chloride).
Very low friction factor:
Value of 'C' in Hazen Williams equation for calculation head loss due to friction in
pipes is 150-160 for GRP pipes against 120-130 for steel pipes. Thus, the low
friction coefficient and the hydraulic characteristics of GRP pipes lead to significant
saving in pumping costs.
Low maintenance cost:
No maintenance cost due to absence of corrosion, zero replacement.
Email:info@cesl.in
Web:www.cesl.in
GRP Pipes
Corrosion resistance:
GRP piping is having anti-corrosion system in both inside & outside. These pipes
has been used for handling dilute acids, saturated brine, organic solvents and other
corrosive chemical but there is a zero corrosion as result additional lining and
exterior coating are not required.
Low thermal conductivity:
Low thermal conductivity of GRP pipe not only causes low temperature losses but
also in many cases eliminates condensation or the need for additional thermal
insulation.
Installation benefits:
GRP pipes are light weight, hence it is easy for installation. These can be
manufactured up to 12m long to speed up the installation and eliminates up to 75%
of the joints compare to any other materials, hence handling & installation is easier
than any other products. GRP pipes are meager heaviness hence its reduce the
expensive installation, labor and machinery expenditures..
Email:info@cesl.in
Web:www.cesl.in
Transportation and handling
Prior to unloading of pipes from trailers, all items shall be inspected for any
visual/transportation damages.
From the lay-down area to the trench site, the pipes shall be transported
through trailers or by using of Hydra.
Email:info@cesl.in
Web:www.cesl.in
Transportation and handling of
GRP Pipes
Transporting Pipe Lifting pipe at one support point Lifting pipe at two support points
Email:info@cesl.in
Web:www.cesl.in
Storage of GRP Pipes
Pipe is generally stored on flat timbers to facilitate placement and removal of
lifting slings.
The support timbers should have sufficient width to prevent point loads.
Email:info@cesl.in
Web:www.cesl.in
Storage of GRP Pipes
Storing Pipes
Email:info@cesl.in
Web:www.cesl.in
GRP Pipe Joining Systems
Unrestrained Pipe Joints
Fiberglass Couplings or Bell and Spigot Joints
Flange
Email:info@cesl.in
Web:www.cesl.in
GRP Pipe Joining Systems
Email:info@cesl.in
Web:www.cesl.in
GRP Pipe Joining Systems
Email:info@cesl.in
Web:www.cesl.in
GRP Pipe Joining Systems
Email:info@cesl.in
Web:www.cesl.in
Tools for Butt & Wrap Lamination Joints
Measuring tape + pipe fitter's wrap-a-round + marker pen
Cleaning-rags
Angle grinder with diagrit or carborundum cutting disc (grain 24), a
handsaw 24 teeth/inch, jig saw with a 14 teeth/inch blade
Angle grinder + sanding disc + flexible support disc
Resin, hardener and glass reinforcement + a pair of scissors
Gloves, brushes, rollers, dust masks in quantities as mentioned in the fit
and laminating sets, a pair of safety glasses
Shelter (depending on the weather circumstances)
Hot air gun (paint stripper gun), digital temperature gauge, gas burner,
field oven, heating blanket, variable energy control (rheostat)
Pipe clamp, bench and rubber strips (under chain clamp).
Generator
Email:info@cesl.in
Web:www.cesl.in
General Safety Recommendations
The practical or possible fabrication area is to be setup to perform as much of
the fabrication work.
Work area should be kept clean, including floor or other horizontal surfaces.
Rinsing with water or sweeping with brushes or brooms (using floor sweep) is
recommended. Brushes should be used to remove residue from shaved surfaces.
Always refer to the Material Safety Data Sheet (MSDS) prior to working with
unfamiliar materials or if there are questions concerning the contents of the
fiberglass pipe.
Email:info@cesl.in
Web:www.cesl.in
General Safety Recommendations
Barrier creme may be applied to the skin in areas, which may be
exposed to shavings prior to beginning work.
Clean clothes should be worn each day. Do not wear clothing that has not
been laundered to begin a work shift. More frequent changing may be required
by conditions.
Gloves with elastic cuffs should be worn at all times. Replace worn or
contaminated gloves as necessary. Gloves with flared, stiff cuffs act as a
gathering funnel for shavings.
Pant legs should be worn outside work boots. If necessary for safety purposes,
the pant legs can be taped to fit closely to the boot. Over-the-calf socks can be
used to prevent chafing of the boot on the skin.
Email:info@cesl.in
Web:www.cesl.in
Personal Hygiene
Wash exposed skin with soap solution (liquid soap preferred) and cool water.
Use washcloth with brushing motion to remove dust or fibers. Do not scrub
the Skin. This could result in the fibers being imbedded into the skin.
Email:info@cesl.in
Web:www.cesl.in
Field Hydro Testing of Above Ground
Pipes
Fill with water at the lowest point in the line using a small diameter branch
connection and vent the trapped air at the highest points.
Long straight sections may be vented using an inflatable ball or foam pig to
expel any air and impurities.
After filling, the line must be pressurized gradually at 0.8 times working
pressure dependent.
on the system and must be maintained for 24 hours allowing the pipe system
to set. After the system is stabilized, the pressure must be raised gradually to
the agreed field test pressure.
Email:info@cesl.in
Web:www.cesl.in
Causes for pressure drop
Temperature change - day as well as night
Leakage of valves, fittings, hydrants, etc
Leakage of gaskets
Dirt at sealing ring
Wrong installation of O-ring (slip ring)
Pipes or fittings insufficiently blocked in the trench resulting in displacement
Air lock
Leaking test equipment
Leaking joint (adhesive bonded, rubber seal or laminated joint)
Leakage in fittings
Leakage of the pipe as result of damage (cracks)
Settlement of the pipe system
Email:info@cesl.in
Web:www.cesl.in
Statutory Documents
Email:info@cesl.in
Web:www.cesl.in
Statutory Documents
Email:info@cesl.in
Web:www.cesl.in
Statutory Documents
Email:info@cesl.in
Web:www.cesl.in
Client Details Industrial Pipe Lines
Gujarat Electricity Board/ BSES Dhuvaran (Various Dia up to 1200 mm).
Shell LNG/Petron (Erection of 13500 Mtrs of Pipes of various dia up to 1450 mm from Sea
water intake & reject, Potable water, DM water & Fire Hydrant).
Cairn Energy Pty Ltd. (Sea water bore well header injection line onshore)- 900 Mtrs.
Hindalco Industries 600 mm to1800 mm dia (Condenser to Cooling tower System) -1500
Mtrs.
HPCL Project, SALPG Vizag with L&T Chennai (100 mm to 450 mm dia for condenser
cooling & Fire Hydrant server)- 1200Mtrs.
IVRCL Infrastructure & Projects Ltd- (100MLD Desalination Plant, Chennai 80mm to
1600 dia)- 2100 Mtrs.
Reliance Energy Tech Engineers ltd, Dahanu Project-(Fuel Gas Disaffirmation sea water
lines, from 50 mm to 1800 mm dia)- 3300 Mtrs.
Email:info@cesl.in
Web:www.cesl.in
Client Details Cross Country Lines
Bharuch Eco Aqua Industries ltd with Aban Engineering ltd-(Engineering, Logistics &
erection of 800 mm dia GRP pipes of 45 Kms).
Hindustan Construction Co Ltd, Pune -(80mm to 400mm dia GRP pipes for 56.94 Kms).
Tata Hydro Power Ltd, Pune- (900mm dia GRP pipes for 1.8 Kms for Rain Water
Harvesting System).
Navayuga Engineering Co Ltd Chennai for Chennai Petroleum Corporation ltd for
Desalination project-(700 mm to 900 mm dia pipes 28 kms).
Karnataka Urabn Water Supply & Drainage Board 350 mm dia pipes for 1.6 Kms.
Email:info@cesl.in
Web:www.cesl.in
Technical Comparison among Different
types of pipes for Sewage Application
Water Proofing
Email:info@cesl.in
Web:www.cesl.in
Technical Comparison among Different