GROUP MEMBERS

DEEPAK. DAVIS
MOHAMMED ASHIQ A T
NAJEEB ISHAQ K
RENIL K R
JITHESH S
SUDHEESH M S
VINEETH KUMAR S

GUIDED BY:
Sri. SANDEEP
INTRODUCTION
The university has included the project
work as a part of the syllabus in civil
engineering in order to make the students
efficient in practical works including planning,
designing, estimating and cost analysis. We
have selected an Indoor Stadium at M.E.S
College Mampad near Nilambur.
GENERAL
A structure is constructed economically by
giving proper organization of design, labour,
materials etc. the construction should be with
locally available materials. The materials used to be
sound and desirable. The designer should have a
clear idea about the local available materials. The
materials used for the construction should be
collected and stocked as near as possible to the
site well in advance so that work is not delayed for
want of materials. The labour should be well
supervised and construction should be completed
as quickly as possible. This helps to prevent the
rate of change of work to some extent.
Every structure consists of two parts,
i) Foundation
ii) Super Structure
Walls, Floor, Lintel, Ventilations and glasses,
Stairs and Roof
OBJECTIVE
To promote popularize, propagate all forms of sports and
games in college level.
To attract the youth in large numbers for participation
in sports activities.
To inculcate sports culture among the students of all
walks of life and educates the students about the
importance of sports to build healthy society.
To utilize the leisure time and surplus energies of the
students for constructive activities through participation
and organizing sports activities.
A stadium at college level that their stadiums hold the key
to the commercial development necessary to enable them
to complete for the best players in the transfer market.
SCOPE
The college ground cannot used for any sports
during rainy season, further during the summer
season the intense heat and dusty atmosphere
interfere with the play system and players. So an
indoor stadium with all facilities should be used
for conducting games, training, coaching camps
day and night is the necessity of the hours in
MES College.
At present there are no areas with the
standard dimensions for sports trainees and
enthusiasts for training and practicing.
STUDY AREA

Site and location have great importance in


the design, planning and layout of a building
work. The site shall be selected such that less
conveyance and manual load for materials,
availability of man power and water shall also
be considered. The site selected for our
project is at M.E.S College Mampad about 5
km from Nilambur.
LITERATURE REVIEW
C.S.Reddy: (1996):
A space truss which is just rigid is a tetra
hedron with 4 joints. An additional joint can
be performed by adding 3 more members.
The space truss may be through out of a
structure device which contains ball and
socket .
Ramachandran (1992):
The analysis of space truss there are three
reference axis assumed in the method of
tension coefficient and three equation.

Punmia (1995):
The economic spacing of truss depends
upon weight of truss, purlines, column,
roof covering etc.
SITE PLAN
PLAN
ELEVATION
SECTION
AREA CALCULATION

Total Plinth area of indoor stadium = 1130 Sq.mtr

Ground Floor area of building = 544 Sq.mtr

First Floor area of building = 544 Sq.mtr

Second Floor area of building = 544 Sq.mtr

Total area of project = (1130+544+544+544)


= 2762 Sq.mtr

Therefore Total Area of project is 2762 Sq.mtr.


DATA COLLECTION
A building should be planned to make it
comfortable, economical and to meet all the
requirements. When a building is planned, the
most important thing to be kept in mind is
that it should give maximum convenience
economically. The planning should be done
with great care.
STAGES

PLANNING
ANALYSIS
DESIGNING
ESTIMATING
COST ANALYSIS
STADIUM
Purpose of Indoor stadium
Badminton
Basketball
Boxing
BADMINTON
Playing court: College: 13.2 mtr (44 ft) long by 6
mtr (20 ft) wide (ideal dimensions).

Height of net post: 1.5 mtr (5 ft)


BADMINTON COURT DIMENSION
BASKETBALL

Playing court: College: 84 feet long by 50


feet wide (ideal dimensions).

High School: 84 feet long by 44 feet wide


(ideal dimensions).

Height of basket:10 feet (upper edge).


BASKET BALL COURT DIMENSION
BOXING

Ring: Professional matches take place in an area


not less than 18 nor more than 24 feet square
including apron.

It is enclosed by four covered ropes, each not


less than one inch in diameter.

The floor has a 2-inch padding of equivalent


underneath ring cover that extends at least 6
inches beyond the roped area in the case of
elevated rings. The floor must extend beyond the
ring ropes not less than 2 feet.
BOXING COURT
PURPOSE OF ATTACHED
BUILDING

Dressing rooms, Rest Rooms, Canteen, Shops,


ATM, conference halls Etc.
Gym and Spa facility
Recreation facilities and bath rooms.
CONSTRUCTION
Stadium is constructed with the height of
12mtr.
The stadium roof is constructed with Steel
Truss.
3 storied building also constructed near the
stadium with the construction joint of 10cm.
The building consist of flat RCC slab.
The whole structure is designed as framed
structure.
TRUSS WORK
The plane truss is provided in the Indoor
Stadium for supporting the roof covering.

ASSUMPTIONS IN ANALYSIS:
The members of a truss are pin jointed at their
ends.
The loads lie in the plane of the truss and are
applied only at the joints.
The centroidal axis of various members framing
into a joint will intersect at a common joint.
STUDY OF SPACE TRUSS
The analysis of space truss can be regarded as
an extension of plane truss analysis.
Special consideration is necessary in view of
the third dimension involved.
To, simplify computations, the connections of
the members in a three dimensional truss are
considered to be ball and socket
TRUSS WORKS
TRUSS WORK
STRUCTURAL WORK
METHODOLOGY
GENERAL STUDY OF
INDOOR STADIUM

Reconnaissance Site Visit


Literature Study

Planning of Indoor Stadium

Analysis

Design

Estimation And Costing

Conclusion
WORKS TO BE DONE
During the 8th semester we have decided to do
the following tasks.
1 .Designing
2. Estimating
3 .Cost analysis
THANKS