DRILLING ENVIROPMENT
Drilling Rig
II. Well Logging – Drilling Environment
Drilling Rig
Land Transition
Drilling Mechanism
Drilling flow :
Pipe
1. Put Ramp using hammer
0 – 100 meters
2. Drilling up to 500 meter using
15 3/4 inch pipe Casing
Run logging and put casing
3. Drilling up to 1500 meters
using 8 1/2 inch pipe run logging
Casing
and put casing Shoe
4. Drilling up to 3000 meters using
7 1/2 inc pipe run logging and put
casing
5. So on up to TD
Bit
II. Well Logging – Drilling Environment
Mud in Drilling
TVD
TST
TVD Top
MT
TVT
TST MT
MT
TST
TVD Base
0
0
TVD Principle for TVD Principle for TVD Principle for
a vertical well and horizontal bed a vertical well and dipping bed a deviated well and dipping bed
II. Well Logging – Drilling Environment
Permeable Layer
P annulus > P formation
Well Environment
Important :
These symbol and nomenclature will be used for Wireline Logging