(IOCO)
Prepared by Professors
C. J. Piper and A. R. Wood
Presented by
Aya Haroun g00067361
Safa Al Zarooni g00060839
Khawla Al Maazimi g00062047
February 27 , 2018
Plan
Cross Section
A-B
large rocks
Crushers are reduced
in size
Waste Dumps
The concentrate
product is loaded on a
ship and exported to
Europe and North
America
College of Engineering | Dr. Amin Chaabane | ESM 685 |Spring 2018
480 cubic meters per hour per unit
11 shovels
7 shovels / ore zone
1 shovel crude zone
Remaining shovels undergoes maintenance
The stockpile :
- 120 m away from the crusher
- Ore is dumped in the stockpile when both crushers are
stopped.
- 15 minutes are lost at every reroute occurrence.
- Time required for a loaded truck to come from shovel in
mine, turn and dump on the stockpile = the time needed to
carry ore to one of crushers, turn, and dump.
- The benefit is having ore loads to be delivered to crushers
when mining is postponed
• To minimize total waiting time and stockpile costs (Keep operations costs as low as possible).
• To improve productivity process and decreasing idle time of machines and labor.
5.34m
T1 arrived
while shovel
Activities T1 T2 T3 T4 still loading T4
loading from Shovel 0 4.5 9 13.5
Departure 4.5 9 13.5 18
Arrival after 1st Trip 16.88 22.5 27 31.5
2nd Departure 22.5 27 31.5 36
So it is better to stockpile