A PRESENTATION BY:
TEAM MECHANICAL-
RMA(SP-3)
CONTENTS
1. RE-USE:
Rubber window modification – Rod Mill section
2. RE-THINK:
Linking process water and fire fighting pipelines –Lubrication Section
3. RE-ENGINEER:
Belt feeder 41 – Hammer Crusher Section
RE-USE
Rod Mill Window
Modification
Rods
Rod Mill Window Modification
The Rubber Window:
• Fixed inside the shell cavity at the discharge end of the
Rod Mill along the periphery
COUNTER-SUNK
BOLTS
MODIFIED
RUBBER
WINDOW
REINFORCING
PLATE
DISCHARGE
WINDOW CAVITY
Rod Mill Window Modification
Advantages
• Control over Crack development
• Control over Discharge Window Strip breakage
• Time saving in Maintenance
Shortcomings
• Limited life span
• High manpower consumption
• Limited stock of worn out Shell plates
RE-THINK
Linking fire fighting pipeline
with process water pipeline
Background
• The Hammer Crushers' Oil coolers and Rod Mills’ bearings need
process water for cooling
The Problem
• Repair in Process water pumps/pipeline of Pump house of Machine-
1 results in stoppage of process water to Package-2 and hence
equipment cannot function
Solution
To link the firefighting pipeline and
process water pipeline at site
Linking Pipelines….
Pipeline Modification At Rod Mills : Overview
Linking Pipelines….
Work done
1. Arresting water leakage in the firefighting pipeline/process
water pipeline
Outcome:
Work done
• The gear box and motor were fitted with the belt feeder
structure
Result
• Jamming problem solved
Upcoming Project: