2 Content

 Project details
 Introduction
 Objective
 Scope
 Study of Location
 Bore hole details
 Safe Bearing Capacity Calculation
 Pile Capacity
 Codes
3
Project details
Project :Construction of New High Level Bridge Across River Damanganga
at Gunsa-Bildhari Villages, Nr. Old Jetty, Silvassa.

Consultancy: DELF Consulting Engineers (India) Pvt. Ltd, Ahmedabad.

Name of Client: M/s. DELF Consulting Engineers (India) Pvt. Ltd, Ahmedabad

Project No.:140657

Month: June 2014

Structure: High Level Bridge


4 Introduction
 The area of Bildhari, Gunsa, and Dudhani etc. are
habituated by tribal peoples meeting their lively hood from
the agriculture activities. However people of Bildhari &
Gunsa are dependent on Dudhani for their other
requirements.
 Presently, the connectivity between Bildhari / Gunsa and
Ghodbari is obstructed due to Damanganga River in
between which causes great inconvenience to the people
GUNSA/BILDHARI

particularly in emergency situation creating embarrassing


situation.
 People are facing problems for daily needs, transportation,
education, medical problems etc when the river is full with GHODBARI

dam water or is in flood. The water depth varies 10’ to 60’. It


is very difficult for local people to cross the river.
5 Objective
 The objective of study is to bore hole data & finding out the
Safe Bearing Capacity of soil. Also compute the pile capacity.

 To provide structural layout/arrangement which will meet the


functional requirement abiding the best work practice in most
safe &economical way.
6 PROPOSED LOCATION:
 The probable alignment considering the existing road network,
convenience of people of Gunsa and Bildhari village separately &
jointly the two alternative alignments seems to be possible as shown
in the sketch below.
7 ALIGNMENT CONSIDERED FOR BRIDGE

 ALIGNMENT 1: This alignment is just downstream of the existing ferry


service jetty.

 ALIGNMENT 2: This alignment is just near the abandoned jetty


behind the habitant area.
8 ALIGNMENT 1
 As seen from the survey data the total length to be bridged is about
700m.
 Even if second gorge is to be filled up the height of embankment
will be about 15m and length will be 160m which is problematic &
difficult.
 The road connectivity toward other side is available at short
distance but toward Ghodbari side it is 100m away.
 The total length of bridge will be about 520m with approach length
of 140m towards Ghodbari side and 50m towards other side.
 The approximate cost of the bridge will be about 520 x 10.5x 65000
= 38cr + approaches will be about 215 x 10.5 x 10000 = 2.50 cr.
Hence total cost of the bridge is 40.50Cr.
9 ALIGNMENT 2
 As seen from the survey data the total length to be bridged is about
500m.
 Approach embankment height will comparatively low about 8 to 9
m.
 The road connectivity toward both sides is available at short
distance.
 The total length of bridge will be about 320m with approach length
of 79m towards Ghodbari side and 100m towards other side
 The approximate cost of the bridge will be about 320 x 10.5x 65000
= 22Cr +approaches will be about 186 x 10.5 x 10000 = 2.00 Cr.
Hence total cost of the bridge is 24.00 Cr.
10 Conclusion and Proposition

 From the parameters mentioned above it can be seen that


alignment 2 is best techno economical alignment for this bridge
and hence it is recommended. The further hydraulic calculations
are done for this alignment.
CROSS SECTION DETAILS OF BORE HOLES
11
12
SUMMARY OF FIELD PROGRAMME
Ground Reference Level :- 76.98m Bore No. :- AB-01
13
Type of Boring :- Rotary drilling with mud circulation
Soil sampler used :- Shelby + SPT Dia. of Boring :-100mm
Date of start :- 06/07/14
W. T. from GL :- 7.00m Completion Date:- 07/07/14
Sr. Depth from Type of Type of FDD No. of blows
No. RL (m) Test Sample (kN/m3) 150mm 150mm 150mm ‘N’ per Cor’ted
300mm ‘N’#
1 76.98 to 76.48 D/S D/S

2 75.48 to 75.03 SPT D/S 8 8 11 19 -

3 73.98 to 73.53 SPT D/S 10 13 15 28 -

4 72.98 to 72.53 FDD/FMC UDS 15.82

5 72.48 to 70.98 Core Core CR=9% & RQD= Nil

6 70.98 to 69.48 Core Core CR=15% & RQD= Nil

7 69.48 to 67.98 Core Core CR=14% & RQD= Nil

8 67.98 to 66.98 Core Core CR=38% & RQD= 36%


14 SUMMARY OF GRAIN SIZE ANALYSIS BORE
HOLE NO: AB-01
Gravel Sand Silt+Clay Liquid Plastic Plastic Classifi
Depth RL Sampl >4.75 4.75 mm-0.075mm <0.075 limit Limit Index cation of NMC
mm C M F mm Soil
e
(m) (%) (%) (%) (%) (%) (%) (%) (%) (%)
76.98 to 76.48 D/S 0 1 6 8 84 56 21 35 CH

75.48 to 75.03 S 0 0 0 4 96 63 28 36 CH

73.98 to 73.53 S 0 0 1 8 92 61 30 30 CH

72.98 to 72.53 UDS 35 0 0 1 64 70 29 41 CH 22

72.48 to 70.98 Core CR=9% & RQD= Nil

70.98 to 69.48 Core CR=15% & RQD= Nil

69.48 to 67.98 Core CR=14% & RQD= Nil

67.98 to 66.98 Core CR=38% & RQD= 36%


SUMMARY OF STANDARD PENETRATION
15
TEST & ATTERBERG LIMITS
16 SAFE BEARIN CAPACITYCAL CULATION

 Sample Calculation of SBC(AB-01) (As per IS 6403: 1981)


 Bearing Capacity Based on Shearing Characteristics:-

Shape of Foundation : Strip


Depth of foundation:(DF) : 3m
Length of foundation (L) :150m
Width of foundation (B) :6m
G.W.T. : 0(m)

C f f' FDD (g) Sp.Gr. g'


Case e
(t/m2) (degree) (degree) (gm/cc) (G) (gm/cc)
I 2.13 19 13 1.61 2.55 0.58 0.98
17
Interpolation Values

Nc Nq Ny Nc' Nq' Ny' Nc'' Nq'' Ny''

14.26 6.01 4.93 9.95 3.34 2.05 13.58 5.59 4.47


dq=dy
sc sq sy dc (f>10) W' FOS

1.00 1.00 1.00 1.14 1.07 0.50 3.00

The Ultimate Bearing capacity qn u =c Nc'' sc dc ic + q (Nq''-1) sq dq iq + 0.5 B g' Ny'' sy dy iy W'

The Ultimate Bearing capacity qn u = 58.98 t/m2

With FOS Net SBC =19.66t/m2


Sr. Foundation Details Laboratory Data Net Soil Bearing Capacity
No SBC Factor
18 .
Type Dept Width Lengt W / T
(m)
C
(t/m
f g
2 (deg) (gm/c
G Sub. e W' sc sq sy dc dq=d Values
y Nc" Nq" Ny" FOS
Net
SBC
(Strip/S h (m) (m) h ) c) FDD (t/m2)
q (m) (f>10)
1 Strip 3.00 4.00 150.0 0.00 2.13 19 1.61 2.55 0.98 0.58 0.5 1.00 1.00 1.00 1.21 1.11 13.58 5.59 4.47 3.00 19.30
0
2 Strip 3.00 5.00 150.0 0.00 2.13 19 1.61 2.55 0.98 0.58 0.5 1.00 1.00 1.00 1.17 1.09 13.58 5.59 4.47 3.00 19.39
0
3 Strip 3.00 6.00 150.0 0.00 2.13 19 1.61 2.55 0.98 0.58 0.5 1.00 1.00 1.00 1.14 1.07 13.58 5.59 4.47 3.00 19.66
0
4 Strip 3.00 7.00 150.0 0.00 2.13 19 1.61 2.55 0.98 0.58 0.5 1.00 1.00 1.00 1.12 1.06 13.58 5.59 4.47 3.00 20.02
0
5 Strip 3.50 4.00 150.0 0.00 2.13 19 1.61 2.55 0.98 0.58 0.5 1.00 1.00 1.00 1.25 1.12 13.58 5.59 4.47 3.00 20.60
0
6 Strip 3.50 5.00 150.0 0.00 2.13 19 1.61 2.55 0.98 0.58 0.5 1.00 1.00 1.00 1.20 1.10 13.58 5.59 4.47 3.00 20.60
0
7 Strip 3.50 6.00 150.0 0.00 2.13 19 1.61 2.55 0.98 0.58 0.5 1.00 1.00 1.00 1.17 1.08 13.58 5.59 4.47 3.00 20.80
0
8 Strip 3.50 7.00 150.0 0.00 2.13 19 1.61 2.55 0.98 0.58 0.5 1.00 1.00 1.00 1.14 1.07 13.58 5.59 4.47 3.00 21.11
0
9 Strip 4.00 4.00 150.0 0.00 2.13 19 1.61 2.55 0.98 0.58 0.5 1.00 1.00 1.00 1.28 1.14 13.58 5.59 4.47 3.00 21.93
0
10 Strip 4.00 5.00 150.0 0.00 2.13 19 1.61 2.55 0.98 0.58 0.5 1.00 1.00 1.00 1.23 1.11 13.58 5.59 4.47 3.00 21.82
0
11 Strip 4.00 6.00 150.0 0.00 2.13 19 1.61 2.55 0.98 0.58 0.5 1.00 1.00 1.00 1.19 1.09 13.58 5.59 4.47 3.00 21.94
0
12 Strip 4.00 7.00 150.0 0.00 2.13 19 1.61 2.55 0.98 0.58 0.5 1.00 1.00 1.00 1.16 1.08 13.58 5.59 4.47 3.00 22.21
0
13 Strip 4.50 4.00 150.0 0.00 2.13 19 1.61 2.55 0.98 0.58 0.5 1.00 1.00 1.00 1.32 1.16 13.58 5.59 4.47 3.00 23.29
0
14 Strip 4.50 5.00 150.0 0.00 2.13 19 1.61 2.55 0.98 0.58 0.5 1.00 1.00 1.00 1.25 1.13 13.58 5.59 4.47 3.00 23.06
0
15 Strip 4.50 6.00 150.0 0.00 2.13 19 1.61 2.55 0.98 0.58 0.5 1.00 1.00 1.00 1.21 1.11 13.58 5.59 4.47 3.00 23.12
0
16 Strip 4.50 7.00 150.0 0.00 2.13 19 1.61 2.55 0.98 0.58 0.5 1.00 1.00 1.00 1.18 1.09 13.58 5.59 4.47 3.00 23.32
0
17 Strip 5.00 4.00 150.0 0.00 2.13 19 1.61 2.55 0.98 0.58 0.5 1.00 1.00 1.00 1.35 1.18 13.58 5.59 4.47 3.00 24.67
0
18 Strip 5.00 5.00 150.0 0.00 2.13 19 1.61 2.55 0.98 0.58 0.5 1.00 1.00 1.00 1.28 1.14 13.58 5.59 4.47 3.00 24.33
0
19 Strip 5.00 6.00 150.0 0.00 2.13 19 1.61 2.55 0.98 0.58 0.5 1.00 1.00 1.00 1.24 1.12 13.58 5.59 4.47 3.00 24.30
0
20 Strip 5.00 7.00 150.0 0.00 2.13 19 1.61 2.55 0.98 0.58 0.5 1.00 1.00 1.00 1.20 1.10 13.58 5.59 4.47 3.00 24.46
0
Foundation Details SBC based on shear strength parameters (t/m2)
L (m) B (m) D (m) AB-01 P5 P6
19 150 4 3 19.30 22.29 35.04
150 5 3 19.39 23.04 38.23
150 6 3 19.66 23.84 41.29
150 7 3 20.02 24.69 44.62
150 4 3.5 20.60 24.25 38.97
150 5 3.5 20.60 24.65 41.79
150 6 3.5 20.80 25.45 44.83
150 7 3.5 21.11 26.31 48.17
150 4 4 21.93 25.99 42.65
150 5 4 21.82 26.52 45.83
150 6 4 21.94 27.17 48.87
150 7 4 22.21 27.77 51.77
150 4 4.5 23.29 27.84 46.78
150 5 4.5 23.06 28.28 58.31
150 6 4.5 23.12 28.58 52.54
150 7 4.5 23.32 29.43 55.44
Co-
Bore Hole
ordinates Diameter (mm) Qu (kN) Qu (t)
No
20 of BH (m)

1200 1500 D1200 D1500 D1200 D1500

AB-01 1200 1200 1500 6379 9969 650 1016

1500
P-01 80 1200 8200 12812 836 1306
1500
P-02 40 1200 7601 11876 775 1211
7801
P-03 0 1200 1500 12189 795 1243
1500
P-04 40 1200 7979 12467 813 1271
1500
P-05 80 1200 8528 13325 869 1358
1500
P-06 120 1200 8006 12509 816 1275
1500
P-07 160 1200 7952 12425 811 1267
1500
AB-02 200 1200 8004 12507 816 1275
21 CONCLUTION
 For Abutment Retaining walls, the soil bearing capacity is to be considered
as various variant of depth & size of foundation. This calculation is based on
the properties of soil as FDD=15.82kN/m3, water content ≈22% & shear
parameters c=20.86kN/m2 & ϕ = 19o & the load will be govern by shear
failure only, the net safe bearing capacity (SBC) for the foundation is
recommended as 20.00t/m2 (196.00 kN/m2) with a factor of safety 3.

 Pile diameter with 1500mm gave batter pile capacity as compare to


1200mm diameter.

 Foundation depth should be taken minimum 1.00m below firm rock surface.

 As the depth of foundation is in the firm rock surface, there will be less
effect of scour.
22 Codes
INDIAN STANDARDS DESCRIPTION
IS 8763 – 1978 Guide for Undisturbed Sampling of Sand
IS 2131 – 1981 Method for Standard Penetration Test (SPT) for soils
IS 10042 – 1981 Code of Practice for Site Investigation for Foundation in
Gravel Boulder Deposit

IS 1892-1979 Code of Practice for Subsurface Investigation


Foundation
IS 2720 Various Method of Test for Soils
IS 2809-1972 Glossary of Terms and Symbols relating to Soil
Engineering
IS 1498 – 1970 Classification and Identification of Soils for General
Engineering
IS 1904 – 1986 Code for Practice for Design and Construction of
Foundation in Soils: General Requirements
23 Codes
INDIAN STANDARDS DESCRIPTION

IS 10785-1983 Method of determination of Compressive & Tensile


strength for Point Load Test on Rock Lumps

IS 11315-1987 Part 01 to12 Method for the Constitutive description of


discontinuities in Rock

IS 7422-1974 Part 01 to 05 Symbols & Abbreviations for use in Geological


Map, Section & Sub Surface Exploration.

IS 9179-1979 Method for the preparation of Rock Sample for


Laboratory Test

IS 11358-1987 Glossary of Terms & Symbols applicable to Rock


Machines.
24 BOOKS

 Dr. N. V. Nayak Foundation Design Manual.


 Dr. B.C. Punamia Soil Mechanics & Foundations.