Академический Документы
Профессиональный Документы
Культура Документы
ENGINEERING
COLLEGE , BHUJ
ANALYSIS OF G + 3 BUILDING
PRESENTING BY
OTHER PROVISION
Apart from the space requirements and sound
treatment, for resistance has also to be considered daily
through its does not significantly affect the layout or design.
INTRODUCTION TO LIMIT STATE
Since this method of design is adopted
widely in recent practice. We have followed this method and
all the design works are carried out in accordance to IS 456-
2000
The object of the design is to produce a
structure which is in all respects satisfactory for which is
required, having the economy as the primary objective
SPECIFICATION
EARTH WORK EXCAVATION
Excavation- foundation trenches shall be drought
to the exact width of foundation concrete and the side should be
vertical. If the soil is not good and does not permit vertical sides.
The sides should be slopped back are protected with timber
shoring excavated earth shall not be placed within one meter of
the trench reinforcement cement concrete RCC.
BASEMENT
The basement with RR masonry in CM 1:5 using first
class blue granite metal with 450mm width, 600 mm height are
proposed the clear dry river sand in purpose of filling the basement.
The base concrete is also made with CC 1:4:8 to over sand filling.
``
SUPER STRUCTURE
The super structure of the building with brick in CM
1:5 mix using first class bricks of size 19*19*9cm of 230mm width and
height up to 3mm with parapet at the height of 600mm is provided.
ROOFING
The roofing of the structure will be RCC slab of
1:1.5:3 mix using 20mm IS gauge hard broken granite chips
weathering course with jelly with lime concrete and top finished with
pressed tiles of 20*20*2cm size.
FLOORING
The top is finished smooth with trowel floor finish with
marbles.
SPECIFICATION OF G+3 APARTMENT
BUILDINGD:
Specification:
Ground floor - car parking:110.49m^2
First floor
2^nd floor
Third floor
Specified with 2-
portion:
Living room:3.81X4.03m
Kitchen:2.87X3m
Two bed room with bath room attachment:2.41X2.5 ;3X5m
Elevator lift:1.46X1m
Stair case:
rise=150mm
tread=300mm
Components size specification use of G+3
apartment
building:
column size=0.35X0.35m
beam size=0.35X0.3m
slab size (1-panel) 4.5X3m=0.165m
Main door=1.18X2m
Window=1X1.5m
Door=1X2m
Partition external wall thickness =350mm
internal wall thickness=250 to 100mm
ventilator =0.25X0.32m
DESIGN OF G+3 APARTMENT
BUILDING
COMPONENTS
GROUND FLOOR COLUMN DESIGN
C1,C2,C3,C4,C5,C6,C7,C8,C9,C10,C12,C13,C14,C15,C16,
C17,C18,C19,C20,C21
Design of column in G+3 apartment
building
B=350mm
D =350mm
Pu=1150KN
MuX=MuY=40KN.m
Fck=20N/MM^2
Fy=415N/MM^2
Assume d’=40mm
d’/D=0.112
Equivalent moment:
Longitudinal reinforcement:
ref chart -44 of SP-16
P/fck
=0.07
P=20X0.07=1.4
asc=(pbd/100)
=1715mm^2
Provided 4 bars of 20mm diameter and 4bars of 16mm diameters
spacing =180mm c/c
p=100Xast/bd
=100x1715/350X350
=1.4
p/fck=0.07
Ref chart -44 of SP-16 and read out (Mux1/fckbd^2) corresponding to
The value of (pu/fckbd)=0.46
MuX1=(0.07 X20X350X350^2)X10^6
MuX1=Muy1=60.025KN.m
Puz=(0.45fckac+0.75fyas)
=0.45X20X((350X350)-1840)+(0.75X415X1840)
=1085940+572700
=1658KN
(pu/puz)=1150/1658
=0.693
The co-efficient αn corresponding to (pu/puz)
=0.69
αn=1.72
Check for satisfied under biaxial bendings
((Mux/Mux1)^(αn)+(Muy/Muy1)^(αn))=1
0.49+0.49=1
0.98=1
Hence the section is safe under biaxial bending.
Reinforcement detail:
provided 4-bars of 12,16,20, diameter as longitudinal reinforcement and
8MM lateral ties at 180mm c/c =(300mm c/c)
DESIGN OF = C1,C7,C13
DESIGN 0F =C2,C8,C14
`
DESIGN OF =C3,C9,C15
DESIGN OF = C16 ,C21
DESIGN OF =C5,C11,C18
DESIGN OF=C6,12,19
DESIGN OF 2ND FLOOR COLUMN
C1,C7,C13
C2,C8,C14
C2,C9,C15
C16,C21
C4,C5,C6,C10,C11,C12,C17,C18,C19
DESIGN OF 3RD FLOOR COLUMN
C1,C7,C13
C2,C8,C14
C3,C9,C15,C20
C16,C21
C4,C10,C17
C5,C6,C11,C12,C18,C19
Design of beam :
A reinforcement concrete beam is to be design
over a effective span 1.25 m
Given :
effective span =1.25m
width of beam =350mm
overall depth =300mm
service load =40KN/m
effective cover=50mm
material=M20 grade concrete
fe-415 HYSD bars
Sv >0.75d
=0.75X250
=187.5mm
=provided 6mm diameter stirrups of at 190mm shear supports
Solution:
ultimate moment and shear force :
Mu=(0.125X1.5X40X1.5^2)
=16.875KN.m
vu=0.5X1.5X40X1.5
=45KN
Moment reinforcement:
Mulim=0.138fckbd^2
=0.138X20X350X250^2X10^-6
=60.375KN.m
Mu<mulim
Hence single reinforced beam.
Mu=0.87fyastd(1-(astfy/bdfck))
16.875X10^6=0.87X415XastX250X(1-(ast415/350X250X20)
ast=196.069mm^2
Provided 4 bars @ 12mm diameter as tension reinforcement 2 bars of 10mm
Diameter hanger bars are compression sides
Sol:
Main reinforcement:
Mulim=0.138fckbd^2
=0.138X20X350X250^2
=60.375KN.m
Mu>Mulim design a doubly reinforced section.
(Mu-Mulim)=7.125KN.m
fsc=(0.0035(Xumax-d’)/xumax)es
=408.333N/mm^2
But fsc >0.87 , Fy=0.87X415
=361N/mm^2
asc=Mu-Mulim/fsc(d-d’)
=7.125X10^6/361X(250-50)
=98.6842mm^2
Provided 2-bars @ 16mm diameter
Ast2= ascfsc/0.87fy
=99X361/0.87fy
=98.98mm^2
Ast1=0.36fckbxulim/0.87fy
=837.557mm^2
Total tension reinforcement
ast=(ast1+ast2)
=837.557+98.98
=936.537mm^2
Provided 2bars @ 25mm diameter (ast=981.16mm^2)
Shear reinforcement:
Ɩv=vu/bd
=90X10^3/350X250
=1.02N/mm^2
pt=100ast/bd
=100X981.16/350X250
=1.12
Ɩc=0.585N/mm^2
Since Ɩv>Ɩc shear reinforcement are requared
Vus=(Vu-(Ɩcbd))
=(90X10^3-(0.585X350X250)
=38812.5X10^-3
=38.8125KN
Using 8mm diameter 2-legged stirrups
Sv=0.87fyasvd/vus
=0.87X415X2X250X50/38.8125X10^3
=232.56mm
Sv>0.75d
0.75x250
=187.5mm
Kt=0.8
Kc=0.94
Kf=0.86
(l/d)max=20X0.8x0.94X0.86
=12.9344=13
(l/d)actual<(l/d)max
Hence deflection control is satisfied.
DESIGN OF BEAM
Sol:
ultimate moment and shear force:
Mu=0.125X1.5X40X4.5^2
=151.875KN.m
vu=0.5X1.5X40X4.5
=135KN
Main reinforcement:
Mulim=0.138fckbd^2
=0.138X20X350X250^2
=60.375KN.m
Mu>Mulim
hence design a doubly reinforced beam sections
Mu-Mulim=151.875-60.375
=91.5KN.m
fsc=(0.0035(xumax-d’)/xumax)Xes
=0.0035(0.48x250)-50/0.48x250xEs
=408.33N/mm^2
But fsc=361N/mm^2
asc=Mu-Mulim/fsc(d-d’)
=91.5X10^6/361(250-50)
=1267.31mm^2
provided 6 bars @ 16mm diameters
ast2=ascXfsc/0.87fy
=1267.31X361/0.87X415
=1267.134mm^2
Ast1=0.36fckbxulim/0.87fy
=0.36X20X350X0.48X250/0.87X415
=837.557mm^2
Shear reinforcement:
Ɩv=(vu/bd)
=135X10^3/350X350
=1.54N/mm^2
pt=100ast/bd
=100X2104.691/350X250
pt=2.40
Ɩc=1.255N/mm^2
Ɩv>Ɩc shear reinforcement is required
vus=(vu-(Ɩcbd))
=135-(1.255X350X250)
=109.67KN
Using 8mm diameter 2-legged stirrups
Sv= 0.87fyasvd/vus
=0.87X415X2X250/109.67X10^3
Sv=82.303mm
Sv>0.75
0.75X250
=187.5mm
(l/d)actual =4500/250
=18mm
pt=2.40
Kt=1.1716
Kc=1
Kf=1.8
(l/d)max=20X1.716X2.303X1.8
=61.776
(l/d)max>(l/d)actual
Solution:
Size of footing:
Dead load + imposed load = 1007KN
Wu=1007 KN
= 1.83m =2m
Adopt square footing of size = 1.83X1.83m
Factored soil pressure at the base:
=1007/(1.83)^2
251<300KN/m^2
Hence footing area is adequate
Mu =0.138fckbd^2
d=(Mu/0.138fckb)^(1/2)
=(108.375X10^6/0.138X20X1000)^(1/2)
d=198.157mm
=251((2000/2)-(300/2)-d)n
Ɩc = 0.36N/mm^2
For m20 grade concrete with nominal percentage of reinforcement
P=0.25
Ɩc=vu/bd
0.36=251X(850-d)/1000d
360d=213350-251d
611d=213350
d=350mm
D=350+50
=400mm
Reinforcement:
Mu=0.87XfyXastXdX(1-(astXfy/bdfck)
108.375X10^6=0.87X415XastX350X(1-5.92X10^-5ast)
Ast=906.22mm^2
p=100ast/bd
P=0.407
from tabel19 of IS456 -2000 the permissible shear
Stress
ksƖc=1X0.609=0.61N/mm^2
Nominal shear stress =Ɩv=Vu/bd
Ɩv=0.709N/mm^2
Ɩv<ksƖc shear stress within safe permissible limit.
DESIGN OF R.C SLAB FOR A G+3
APARTMENT BUILDINGS
GIVEN:
Roof size=4.5X3m
LX=3m
LY=4.5m
LY/LX=1.5m
fck=25N/mm^2
fy=415N/mm^2
SOLUTION:
Depth of slab:
As the ratio of long to short span 1.5 which is
<2 the slab has to be designed as a 2-way slab.
As the loading condition exceed 3KN/mm^2
Adopt a span/effective depth ratio of 25
d=4500/25
=180mm
D=180+25
=205mm
Effective span:
clear span + effective depth
=3+0.18
=3.18m
Loads:
self wt=0.205X1X25=5.125KN/m^2
live load=3KN/m^2
floor finishes= 1KN/m^2
service load=9.33KN/m^2
wu=1.5X9.33=13.995KN/m^2
Long span:
provided 10mm diameter bar
520mm spacing on both direction
Ɩv=vu/bd
=22.85X10^3/10^3X180
=0.1269N/mm^2
pt=100ast/bd
=0.080
Ɩc=0.135N/mm^2
kƖc=0.175N/mm^2
Which is greater than Ɩc=0.12N/mm^2
Hence the shear stress are within safe permissble limit
check for deflection control:
(l/d)basic=25
for pt=0.17;kt=1
25X1X1=25
(L/D)actual=17.67
17.65<25
Deflection control is satisfied
Effective span:
L=7X300 +300
=2400mm
=2.4m
Thickness of waist slab =(span/20)
=2400/20
=120mm
Effective depth =d=95mm
Loads:
Dead loads of slab on slope = ws=( 0.12X1X25)
=3KN/m
Dead load of slab on horizontal span is
W=(ws(r^2+t^2)^(1/2)/t)
W=3.35KN/m
Dead load of one step =(0.5X0.15X0.3X25)
=0.56KN/m
Load of steps per meter length =(0.56X10^3/300)
=1.86KN/m
Finishes etc =0.53KN/m
Total dead load =(3.35+1.86+0.53)
=5.74KN/m
Service live load =5KN/m
Total service load =5.74+5
=10.74KN/m
Factored load =1.5X10.74
=16.11KN/m
Bending moment:
Maximum bending moment at center of span is :
M=0.125wul^2
=0.125X16.11X2.4^2
=32.22KN/m
Main reinforcement:
Mu=0.87X415XastXd(1-(415ast/bdfck))
32.22X10^6=0.87X415astX95(1-(415ast/1000X95X20))
ast=1319.64mm^2
Provided 12mm diameter bars at 200mm centers
Distribution reinforcement :
=0.12percentX1000X120
=0.0012X1000X120
=144mm^2/m
Provided 8mm diameter bars at 200mm centers
ast =(pbd/100)
=0.669 X1000X120/100
=802.8mm^2/m
The reinforcement quantity is the same as that obtained by analytical
Method.
LOAD DISPLACEMENT DETAILS FOR
STRUCTURAL WORKS:
SELF WT=2.25KN
BENDING REACTIONS FOR DEADLOAD
LIVE LOAD = 20KN\m
BENDING REACTION FOR LIVE LOAD
LOAD DISPLACEMENT OF SUPER IMPOSED
LOAD
=44KN/m
CONCLUSION :
The planning and designing of the AN APARTMENT
BUILDING has been completed effectively in our project. if this is
constructed in the proposed site, it will be very help full to our
people.
we all the members of our team have learned to
plan a building with referring to NATIONAL BUILDING OF
INDIA 2005. this project is a very useful to learn about the
design of the structural elements like beams , column and slabs by
using IS 456-2000.
the important think that we done were referring to
lot of books for designing, and we are very much satisfied with
exposing to field design.
THANK YOU