Type : PWR
Power Level : 1,050MWe
2 Loops, 2 S/Gs, 4 RCPs
177 Fuel Assy’s, 16 × 16 tubes
S/G : Vertical U-tube with
Economizer
Condenser Heat Sink : Sea water
Ⅱ. Brief Overview of Radiation protection
□ Statutory Exposure Dose limit
Effective Dose Limit 100mSv per 5 years 12mSv per year 1mSv per year
Effective Dose Limit 16 mSv per year 10 mSv per year 1 mSv per year
Ⅱ. Brief Overview of Radiation protection [cont’d]
Year
Ⅲ. Description of CCTV system
□ Purpose
Radiation Exposure Reduction
Efficient Radiation Safety Control in RCA
Continuous Check-up for important works and
facilities integrity
□ Characteristics
Real-time information by LAN
Movable Cameras can support important or high
radiation work anywhere
Ⅲ. Description of CCTV system [cont’d]
□ Composition
Item #5 #6 RWB
Monitoring System 1 Set 1 Set -
Announcement System 1 Set 1 Set -
Fixed 7 Sets 7 Sets 4 Sets
Camera
Movable 2 Sets 2 Sets -
Data Cable 3.3 Km 3.3 Km 1.1 Km
Ⅲ. Description of CCTV system [cont’d]
□ Network
LAN LAN
Movable or
Fixed HP Room
Console Lack
Office
Lobby Monitor
Ⅲ. Description of CCTV system [cont’d]
Number of
Building Elevation Main Function
jacks
Installation and removal of SG Nozzle dam
100 2 Installation and removal of SG man-way
ECT (Eddy current test)
MONITOR MONITOR
ACB 100’
LOCKER AREA ROOM
MATRIX MONITORING
ACB 100’ SWITCHER SERVER(DVR)
Entrance of RCA
11SET
SAB 100’
GEN ACCESS AREA
SAB 77’
GEN ACCESS AREA
KEYBOARD KEYBOARD
FHB 100’
TRUCK BAY AREA
4SET
PAB 144’
LINK FACILITY
FHB 142’
STORAGE AREA
PAB 144’
PERSONAL AIRLOCK AREA
LINK FACILITY
to RWB
Ⅲ. Description of CCTV system [cont’d]
Case 2
□ Maintenance of leak Valve (SI-V522) in SI System
Date : ’07. 7.17(unit 6 fourth outage)
Work Description
• At the time of NOT/NOP, SI- check Valve 522 of High Presser
Safety injection Header leaked
• Piping was isolated throughout Ice plugging and Valve was
Maintained
• CCTV System was used to monitor the maintenance work
and ALARA Control
Ⅳ. Cases for use of CCTV system [cont’d]
Number of workers : 16
Total working time : 6 hrs
Ⅴ. Effects
Plan & Admin Div. Power Gen. Div. Project Div. Radwaste Project Div.
Under Total
Site In Operation Const/Planed Unit (MW)
2 (2,000),
Kori 4 (3,137) 8 (7,937)
2 (2,800)/ -
2 (2,000)/
Wolsong 4 (2,779) 6 (4,779)
-
Yonggwang 6 (5,900) - 6 (5,900)
- /
Ulchin 6 (5,900) 8 (8,700)
2(2,800)
◎ Seoul Total 20 (17,716) 8 (9,600) 24 (21,716)
Ulchin #1,2,3,4,5,6
(Shin-Ulchin #1,2)
Wolsong #1,2,3,4
(Shin-Wolsong #1,2)
Yonggwang
#1,2,3,4,5,6 Kori #1,2,3,4
(Shin-Kori #1,2,3,4)
KHNP Overview [cont’d]
□ Nuclear Power Plants in Operation 20 units (17,716 MW)
Reactor Capacity NSSS
Project Unit A/E COD
Type (Mwe) Supplier
#1 PWR 950 W/H Bechtel/KOPEC Aug. 1986
#2 PWR 950 W/H Bechtel/KOPEC Jun. 1987
#3 PWR 1,000 DOOSAN KOPEC Mar. 1995
Yonggwang #4 PWR 1,000 DOOSAN KOPEC Jan. 1996
#5 PWR 1,000 DOOSAN KOPEC May 2002
#6 PWR 1,000 DOOSAN KOPEC Dec. 2002
#1 PWR 587 W/H Gilbert Apr. 1978
#2 PWR 650 W/H Gilbert July 1983
Kori #3 PWR 950 W/H Bechtel/KOPEC Sep. 1985
#4 PWR 950 W/H Bechtel/KOPEC Apr. 1986
#1 PHWR 679 AECL AECL Apr. 1983
#2 PHWR 700 AECL AECL/KOPEC Jun. 1997
Wolsong #3 PHWR 700 AECL AECL/KOPEC Jun. 1998
#4 PHWR 700 AECL AECL/KOPEC Sep. 1999
#1 PWR 950 Framatome Framatome Sep.1988
#2 PWR 950 Framatome Framatome Sep. 1989
#3 PWR 1,000 DOOSAN KOPEC Aug. 1998
Ulchin #4 PWR 1,000 DOOSAN KOPEC Dec. 1999
#5 PWR 1,000 DOOSAN KOPEC July 2004
#6 PWR 1,000 DOOSAN KOPEC Apr. 2005
KHNP Overview [cont’d]
□ NPP planned or under Construction 8 units (9,600 MW)