MVD Exchanges: Examples with MVD Scenario
V1.0, 24.8.2010
EXEMPLE OF MVD SCENARIO

This document gives an example of


SOMA exchanges
For this example, we consider two TSO A and B with
the following configuration:
 TIE Line Accounting points:

 Metering Point :Main and Back up meter in both


substations

April 27, 2018 3


EXEMPLE OF MVD SCENARIO

Metering data: Metering Point Metering Point


A B
From 00:00 to 3:00, the following
data are recorded by the different Back- Back-
Main Main
meters: up up
0:00 to 1:00 200 201 195 196
Line 1 1:00 to 2:00 NA 201 195 196
2:00 to 3:00 NA NA 195 196
0:00 to 1:00 100 101 95 96
Line 2 1:00 to 2:00 100 NA 85 96
2:00 to 3:00 NA 101 95 96
0:00 to 1:00 50 51 45 46
Line 3 1:00 to 2:00 50 NA 45 NA
2:00 to 3:00 NA 51 NA 46

Issues:
Line 1, SO A, 2:00 to 3:00: No data availlable
Line 2, 1:00 to 3:00: data out of tolerence threshold
April 27, 2018 4
EXEMPLE OF MVD SCENARIO

OPTION 1: Only send Accounting Point Relevant Data


Accounting Relavant Data Mandatory

 First exchange of SOMA documents between SOA and B:


SO A to SO B: SO B to SO A:

Line 1 Line 3 Line 1: Line 2 Line 3


SO A: NA
T-CODE T-CODE T-CODE T-CODE
ARD ARD ARD ARD
Pos 1 1 Pos 1 1 Line 2:
Qty 200 50 Qty 95 45 SO A: 100
Qual Qual SO B: 85
Pos 2 2 Pos 2 2 > 5%
Qty 201 50 Qty 85 45
Qual Qual
Pos 3 3 Pos 3 3
Qty NA 51 Qty 96 46
Qual A02 Qual

ACK A to B: NEG ACK B to A: NEG


Line 2: Pos 2: out of Line 1: Pos 3: Accounting
tolerance Relevant Data not available

April 27, 2018 5


EXEMPLE OF MVD SCENARIO

OPTION 1:
 Second exchange of SOMA documents:

SO A to SO B: SO B to SO A:

Line 1 Line 3 Line 1: Line 2 Line 3


T-CODE T-CODE SO A use T-CODE T-CODE
ARD ARD estimated ARD ARD
value Line 2:
Pos 1 1 Pos 1 1 SO B use the
Qty 200 50 Qty 95 45 Back up Meter
Qual Qual
Pos 2 2 Pos 2 2
Qty 201 50 Qty 96 45
Qual Qual
Pos 3 3 Pos 3 3
Qty 200 51 Qty 95 46
Qual A03 Qual

ACK A to B: POS ACK B to A: POS


SO A use an estimated SO B use Back-up meter
value for Line 1 : Pos 3 for for Line 2: Pos 2 End of SOMA process

April 27, 2018 6


EXEMPLE OF MVD SCENARIO

OPTION 2: Send Accounting Point Relevant Data and Main Meter


Measurement
Accounting Relavant Data (ARD) Mandatory
Main Meter Measurement Data (MMM) Mandatory

 First exchange of SOMA documents between SOA and B:


SO A to SO B: SO B to SO A:

Line 1 Line 2 Line 3 Line 1: Line 1 Line 2 Line 3


Local Local Local SO A: NA Local Local
T-CODE T-CODE T-CODE Z-CODE T-CODE
CODE CODE CODE CODE CODE
ARD ARD ARD MMM ARD
MMM MMM MMM MMM MMM
Pos 1 1 1 1 1 Pos 1 1 1 1 1
Qty 200 200 100 50 50 Qty 195 95 95 45 45
Qual Qual
Pos 2 2 2 2 2 Pos 2 2 2 2 2
Qty 201 NA 100 50 50 Qty 195 85 85 45 45
Qual Qual
Pos 3 3 3 3 3 Pos 3 3 3 3 3
Qty NA NA NA 51 NA Qty 195 95 95 46 NA
Qual A02 A02 A02 Qual A02

Line 2:
SO A: 100
ACK A to B: NEG ACK B to A: NEG
SO B: 85
Line 2: Pos 2: out of Line 1: Pos 3: Accounting
> 5%
tolerance Relevant Data not available
April 27, 2018 7
EXEMPLE OF MVD SCENARIO

OPTION 2:
 Second exchange of SOMA documents:

SO A to SO B: SO B to SO A:

Line 1 Line 2 Line 3 Line 1: Line 1 Line 2 Line 3


Local Local Local SO A use Local Local
T-CODE T-CODE SO B value T-CODE Z-CODE T-CODE
CODE CODE CODE CODE CODE
ARD ARD ARD MMM ARD
MMM MMM MMM MMM MMM
Pos 1 1 1 1 1 Pos 1 1 1 1 1
Qty 200 200 100 50 50 Qty 195 95 95 45 45
Qual Qual
Pos 2 2 2 2 2 Pos 2 2 2 2 2
Qty 201 NA 100 50 50 Qty 195 96 85 45 45
Qual Qual
Pos 3 3 3 3 3 Pos 3 3 3 3 3
Qty 195 NA NA 51 NA Qty 195 95 95 46 NA
Qual A02 A02 A02 Qual A02

Line 2:
SO B use the
ACK A to B: POS ACK B to A: POS Back up Meter
SO A use SO B value for SO B use back-up meter
Line 1 : Pos 3 for line 2 Pos 2

April 27, 2018 End of SOMA process


8
EXEMPLE OF MVD SCENARIO

Send Accounting Point Relevant Data, Main and Back-Up Meter


OPTION 3: Measurement
Accounting Relavant Data (ARD) Mandatory
Main Meter Measurement Data (MMM) Mandatory
Back-Up Meter Measurement Data (BMM) Mandatory

 First exchange of SOMA documents between SOA and B:


SO A to SO B: SO B to SO A:

Line 1 Line 2 Line 3 Line 1 Line 2 Line 3


T- Local Local Local Local T- Local Local Local Local T- Local Local T- Local Local
CODE CODE CODE CODE CODE CODE CODE CODE CODE CODE CODE CODE CODE CODE CODE CODE
ARD MMM BMM MMM BMM ARD MMM BMM MMM BMM ARD MMM BMM ARD MMM BMM
Pos 1 1 1 1 1 1 1 1 Pos 1 1 1 1 1 1 1 1
Qty 200 200 201 100 101 50 50 50 Qty 195 196 95 95 96 45 45 46
Qual Qual
Pos 2 2 2 2 2 2 2 2 Pos 2 2 2 2 2 2 2 2
Qty 201 NA 201 100 NA 50 50 NA Qty 195 196 85 85 96 45 45 NA
Qual A02 A02 Qual A02
Pos 3 3 3 3 3 3 3 3 Pos 3 3 3 3 3 3 3 3
Qty NA NA NA NA 101 51 NA 51 Qty 195 196 95 95 96 46 NA 46
Qual A02 A02 A02 A02 Qual A02

Line 2:
Line 1: SO A: 100
ACK A to B: NEG ACK B to A: NEG
SO A: SO B: 85
Line 2: Pos 2: out of NA Line 1: Pos 3: Accounting
tolerance Relevant Data not available > 5%

April 27, 2018 9


EXEMPLE OF MVD SCENARIO

OPTION 3:
 Second exchange of SOMA documents:

SO A to SO B: SO B to SO A:
Line 1 Line 2 Line 3 Line 1 Line 2 Line 3
T- Local Local Local Local T- Local Local Local Local T- Local Local T- Local Local
CODE CODE CODE CODE CODE CODE CODE CODE CODE CODE CODE CODE CODE CODE CODE CODE
ARD MMM BMM MMM BMM ARD MMM MMM MMM BMM ARD MMM BMM ARD MMM MMM
Pos 1 1 1 1 1 1 1 1 Pos 1 1 1 1 1 1 1 1
Qty 200 200 201 100 101 50 50 50 Qty 195 196 95 95 96 45 45 46
Qual Qual
Pos 2 2 2 2 2 2 2 2 Pos 2 2 2 2 2 2 2 2
Qty 201 NA 201 100 NA 50 50 NA Qty 195 196 96 85 96 45 45 NA
Qual A02 A02 Qual A02
Pos 3 3 3 3 3 3 3 3 Pos 3 3 3 3 3 3 3 3
Qty 195 NA NA NA 101 51 NA 51 Qty 195 196 95 95 96 46 NA 46
Qual A02 A02 A02 Qual A02

Line 1: Line 2:
ACK A to B: POS SO A use SO ACK B to A: POS SO B use
SO A use SO B value B value SO B use the back- the Back up
for Line 1 : Pos 3 up meter Meter

April 27, 2018 End of SOMA process


10