Construction Training
Mechanical Work
I. Mechanical Construction
IX. Question
Main Activities
6. Alignment work
7. Grouting work
Pump Compressor
Procedure
Foundation
acceptance and
handling
Lift to Levelling Fixed the rivet
Testing
location &alignment bucker, grouting
Equipment
acceptance Cleaning & Inner part
Check Insulation
closing assembling
Point
1. Foundation Acceptance : There should be inspection record and vertically and horizontally central line and
coordinate.
Procedure
Second grouting
Final inspection
Before Installation
▪ Heavy Equipment Transportation Route Survey
During Installation
▪ Chipping check
▪ Location, length and erection method of Anchor bolt should follow the Manual
During Installation
Before Installation
▪ Check the Foundation & Anchor Bolt (Size, Location)
During Installation
▪ Final Alignment (Centering, Vertical, Bolt torque Check / Welding spot NDE)
Plot Plan
Engineering Drawing
Installation/Preservation Procedure
• Dimensions and
estimated erection
weights shall be specified
in major equipment list.
• Auxiliary structures for
skids and equipment to
be purchased together
with the item.