Вы находитесь на странице: 1из 18

PREPARED BY:

MUEEN HNIEDY
SALEH ABU ASSAF
YOUSSEF CHALABI
BASHAR IBRAHIM
Acknowledgment

We acknowledge all the people that helped us in performing this


presentation specially:

Who gave us a lot of their time and gave us the great support
Agenda
 The purpose of the well services

 The main operations in well services

 Some problems & recommended solutions


The purposes of the well services

 Gathering data for:


1- reservoir engineers
2- production technologist
(P,T, Q, reservoir properties , well properties , …..)
 Execute activities to:
1- optimize the flow rate
2- maintain the well integrity
 Manage the well integrity
The main operations
 Wireline:

-Perforation

-Running down and pulling up some equipment

-Logging

-Tests
Coil Tubing:

-Acid washing

-Acid stimulation

-Nitrogen bull heading

-Nitrogen lift

-Remedial cementing
Surface Maintenance

-Maintenance of the Xmass tree

-Flush flow line

There are some contractors which help us to

perform these operations , like: Sapesco,

Schlumberger, Gharib, Superior, PPS, …


Well services problems

Technical Non-technical

Simple Complex

Corrosion Leaking Attrition


Mechanical
failure
1- Leaking:

We face this problem in many parts of the


well:
• The tubing
• The packer
• Sliding side door (SSD)
• Cement
• Casing
• Xmass tree

Leaking
2- Corrosion
We may have corrosion in the equipment (tubing, production
casing, the plugs,…) because of:
1- H2S
2- CO2
3- Chloride
4- Oxygen
5- Bacteria
How do we handle these problems?
1- Leaking:

We usually monitor the pressure inside the tubing and the annulus
For every envelope we have an allowable range of pressure changes
As shown in this table:

conventional cemented conventional cemented conventional cemented

A <2000 psi >500 psi 2000-2500 psi 500-1000 psi >2500 psi <1000 psi

B >2000 psi >150 psi 2000-2500 psi 150-300 psi <2500 psi >300 psi

C >150 psi 150-300 psi <300 psi

Monitored monthly Monitored weekly Monitored daily


No.of wells in
Normal Close to danger Serious
AFPC

633 620 10 3

Our wells in AFPC

3
10

wells in green area


wells in orange area
wells in red area

634
Oxygen separation
& Biocide
Oxygen scavenger

O2 Bacteria

Corrosion

H2S Chloride

CO2

Special equipment
In AFPC we identified Safety Critical Equipment which we always monitor,
test and maintain

These components are:


 Subsurface Safety Valve (SSSV)
 Xmass tree valves
 Wellhead seals
 Annuli (and associated tubing, liner and casing)
 Well conductor

In well services section we do inspection on the normal wells Twice a year,


and we receive reports from the production technologists during the life of
the well
Well services problems

Technical Non-technical

Simple Complex

Corrosion Leaking Attrition


Mechanical
failure
Attrition
One of the main problems that we have in the section is the loss off the
members whose experience are 4-6 years as shown in this histogram:

Staff movement

9 Number of national
8 staff lost from field
7
6
No of National staff recruited
5
4 No of National staff lost from
field
3
2
1
0
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
To limit this problem:
 Increase the rewards and compensations by:
• Giving more courses (overseas , in-house )
• Participation in conferences and workshops
 Give them a chance to work out for some time and go back again
with more experience
 Modify on the punishment policy to be stronger
 Communicate with other companies to prevent any of AFPC staff
from working with them without a clear approval from AFPC