PROJECT PREPARATION
PUNJAB IRRIGATED AGRICULTURE INVESTMENT
PROGRAMME (PIAIP)

presentation for Chief Bahawalpur

NESPAK-AAB-DMC JOINT VENTURE (PIAIP CONSULTANTS)

2
Reclaiming Agricultural Land Affected by Water
Logging in Bahawalpur Zone

3
Reclaiming Agricultural Land Affected by Water Logging in
Irrigation Zone Bahawalpur

Waterlogging Locations:
Maps

I. In Command Area of Hakra Branch Canal in District Bahawalnagar;


Area Map Causes

II. In Command Area of Abbasia Canal System and along Panjnad Main
Line; Area Map Causes

III. In Command Area of Sadiq Branch Canal (Tarinda and Gullan Disty);
in Tehsil Sadiqabad, District Rahimyar Khan
Area Map Causes
4
In Command Area of Hakra Branch Canal in District Bahawalnagar

Approach For Evaluation: BWN BWP RYK

• Data Collection & Review of Previous Studies ✓ ✓ ✓

• Meetings with concerned Department (PID) & Stakeholders ✓ ✓ ✓

• Analysis of the Data ✓ ✓ ✓

• Site Visit and Condition Survey ✓ ✓ ✓

• Hydraulic & Topographic Survey ✓ ✓ ✓

• Groundwater Investigations ✓ ✓ ✓

• Geotechnical Investigations ✓ ✓ ✓

• Numerical Modelling by MODFLOW,SEEP/W & HEC-RAS ✓ ✓ ✓


• Social & Environment Studies ✓ ✓ ✓

• Agriculture & Economic Studies ✓ ✓ ✓

5
In Command Area of Hakra Branch Canal in District Bahawalnagar

Option-1 : Concrete Lining of Hakra Branch Canal From RD. 185+000


up to Tail RD 285+920

Option 2 : Parallel Seepage Interceptor Surface Drains

Option 3 : Parallel Seepage Interceptor Surface Drains + Drains in


Command Area + L/R Outfall

Option 4 : Side Seepage Drains on Both Sides of Hakra Branch Canal &
in command area + Tubewells (Recommended)

(Cost Estimate)

6
Reclaiming Agricultural Land Affected by Water Logging in Irrigation Zone Bahawalpur
SUMMARY OF WORKS FOR RECLAMATION OF WATERLOGGED AGRICULTURE LAND IN DISTRICT BAHAWALNAGAR
DESCRIPTION OF Proposed List of
Sr. Working TOTAL T/W Prop.
CONSTRUCTION WORKS Syphon/RD OUTFALL DRAIN / RD CHAK NO Capacity Structures REMARKS
No. Head LENGTH (2 Cs Each)
(New Drains) (Q cfs) (No.s)

1. Hassan Chowki Drain 26+770(Hakra Branch Canal) 245+475(Haroonabad Drain) 1.04 kot Abdulhaq,Bakhu shah 4+860 6 1

2. kot Abdulhaq Drain 0+474 (Hassan chowki Drain) 0.25 kot Abdulhaq,Bakhu shah 4+973 6 1

3. Bakhu Shah Drain 0+474 (Hassan chowki Drain) 0.25 kot Abdulhaq,Bakhu shah 2+765 4 1

4. korianwali Main Drain 42+660(Hakra Branch Canal) 227+470(Haroonabad Drain) 1.08 Korianwali 12+778 16 3

5. korianwali sub Drain 3+270(Korianwali Drain) 0.25 Korianwali 3+736 5 1


150,151/1L,152/2L,154/3L
6. Hakra Left Main Drain Ghagra River 1.75
,155/3L
140+161 205
62+673 (Hakra left Main
7. Hakra left sub Drain Drain)
0.83 195/HB,196 48+140 30 20
31+743(Hakra left Main
8. Hakra Right Drain 275+000(Hakra Branch Canal)
Drain)
1.58 197,156/3L,204/9R 75+385 97

9. 7-R Drain 44+078(Hakra Right Drain) 0.98 193,156/3L 17+533 15 8

10. 8-R Drain 36+385(Hakra Right Drain) 0.76 3+058 10 3


lift
11. 9-R Main Drain 01+575(Hakra Right Drain) 200/9R,204/9R 36+593 25 18
required
12. D-sub Drain 66+000(Existing D-drain) 0.28 162/7R,159 18+098 15
56
Box Culverts 76
Aqueducts 6
Water Course Crossing 93
Inlets 149
Tube Well Room 56
Construction of New Quarter for Tube well Operator (56 Nos) 56
Out Fall Structures 2
Linning of 3-L & 4-L Distys 2
Drainge Crossing 3
In Command Area of Abbasia Canal System and along Panjnad
Main Line
Options:
Command Area of Abbasia Link Canal
I. Lining of Abbasia Link Canal and surface drains in command area
II. Tubewells along Abbasia Link canal and Surface drains in command area
III. Parallel Seepage drains and surface drains in command area (Recommended)
Command Area of Panjnad Main Line Canal
I. Lining of Panjnad Main Line Canal
II. Tubewells along Panjnad Main Line Canal
III. Side Seepage Drains and R&U of Existing Drains (Recommended)
IV. Due to Non-Perennial Function of Panjnad Main Line(PML) there is no need of
the Study. PML act as a drainage channel during Rabi Season
(Cost Estimate)
8
Reclaiming Agricultural Land Affected by Water Logging in
Irrigation Zone Bahawalpur
Proposed drains in Abbasia and Punjnad Canal Commands

Name of Drain Length (ft) Discharge (cfs) Outfall


Abbasia Right Drain 1 44,720 59 Abbasia Link Canal
Abbasia Right Drain 2 75,000 90 Abbasia Link Canal
2R/1L 94,722 94 Abehayat Drain
7R Drain 60,000 70 Turkuria Drain
5R drain 32,950 30 3R Main Drain
PML Right drain 1 37,162 37 Punjnad Main Line
PML Right drain 2 44,226 32 Punjnad Main Line
PML Right drain 3 29,981 39.3 Punjnad Main Line
PML left drain 1 36,923 55 Punjnad Main Line
PML left drain 2 17,467 23.8 Punjnad Main Line
PML left drain 3 15,467 20 Punjnad Main Line
488,618 ft (97.7 canal miles)

List of Struc. 9
Command Area of Sadiq Branch Canal (Tarinda and Gullan Disty);
in Tehsil Sadiqabad, District Rahimyar Khan

Options:

I. Tile Drains
II. Surface Drains With Tubewells
III. Surface Drains with outfall into Manthar & Pattan Munara drain(Recommended)

(Cost Estimate)

10
Reclaiming Agricultural Land Affected by Water Logging in
Irrigation Zone Bahawalpur
Proposed & Existing drains in Water logged area in Tehsil Sadiqabad of District Rahimyar Khan

Name of Drain Length (ft) Discharge (cfs) Outfall


D1 Sub Drain 13,031 15 D1 Drain
D1 Drain 35,879 56 Pattan Minara Drain
D2 Drain 32,435 37 Manthar Drain
Pattan Minara Drain 34,000 266 Khanpur Drain
2L Drain 31,568 42 Manthar Drain
3L Drain 18,007 24 Manthar Drain
4L Drain 17,700 24 Manthar Drain
Manthar Drain 188,800 321 Evaporation Pond
363,302 ft (72.7 canal miles)

X-Sections

List of Struc. 11
Reclaiming Agriculture Land Affected by Water Logging in
Irrigation Zone Bahawalpur

PROJECT COST

SUB PROJECT COST


CONSTUCTION PERIOD
(Million Rs.)
Drainage Project for waterlogged
irrigated land around Manthar area of 2 Years
District Rahimyar Khan 1,305 (FY 2017-18 & 18-19)

Drainage Project for waterlogged


irrigated land in the command areas of 2 Years
Hakra Branch canal in District 1,642 (FY 2017-18 & 18-19)
Bahawalnagar

Drainage Project for waterlogged


irrigated land in the command areas of 2 Years
Abbasia canal and Abbasia Link canal 2,001 (FY 2017-18 & 18-19)
in District Bahawalpur/Rahimyar Khan
12
13
Meeting with Chief Engineer Bahawalpur Zone

14
Condition Survey in Command Area of Hakra Canal with S.E Bahawalpur

15
Condition Survey in Command Area of Hakra Canal with S.E Bahawalpur

16
Condition Survey in Command Area of Hakra Canal with S.E Bahawalpur

17
Field Visit of 3R Drainage System With S.E Bahawalpur

Syphon @ Trukari Drain


18
Condition Survey

19
Waterlogging Along Hakra Canal at RD 25+500

20
Site Visit / Condition Survey – District BWN

Haroonabad Drain RD 0+000 21


Site Visit / Condition Survey – District BWN

Outfall of 3L Drain at RD 143+000 of Haroonabad Drain 22


Site Visit / Condition Survey – District BWN

Old Ghagra River


Escape – Abbasia Feeder

24
Escape – Abbasia Feeder

25
RD 157-158 of 3R Drain

26
Syphon – Trukari Drain

27
Outfall of 3R Drain into Trukari Drain (RD 0+000 of 3R Drain)

28
Outfall of Basit Drain at RD 41+000 of 3R Drain

3R Drain

29
Pumping Station-3 (RD 0+000 of Manthar Drain)

30
Pumping Station-3 (RD 0+000 of Manthar Drain)

31
3L Drain Outfall (RD 0+000)

32
Hydraulic Survey

33
Hydraulic Survey – District RYK

Measuring Discharge of Hakra Canal using AA Current Meter


34
Hydraulic Survey – District RYK

Measuring the Discharge of of Outlet using Pygmy Current Meter


35
Hydraulic Survey – Command Area of Abbasia Link Canal

Flow Measurement at Abbasia Link Canal 36


Hydraulic Survey – District RYK

Flow Measurement at Manthar Drain PS-III (U/S)


37
Hydraulic Survey – District RYK

Flow Measurement at Manthar Drain PS-III (D/S)


38
Hydraulic Survey at outfalls – District RYK

X-Sectional Area Avg. Velocity Observed Design Discharge


Sr. No. Location Date
(sft) (ft/sec) Discharge (cusec) (cusec)

1 Khanpur Drain 24-09-2016 180.45 1.05 189

2 Pattan Munara Drain 24-09-2016 57.8 0.65 37.6 156

D/S Confluence of
3 Khanpur and Pattan 24-09-2016 164.5 1.37 225.8
Munara Drain

U/S of Manthar Drain


4 26-09-2016 115.22 0.64 73.7 212
Pump Station

D/S of Manthar Drain


5 26-09-2016 65.5 1.07 70.43 212
Pump Station

39
Reclaiming Agricultural Land Affected by Water Logging in
Irrigation Zone Bahawalpur

Analysis Results

• Cross Sections of Abbasia canal with proposed Drains


• Depth to Water Table of Area Adjacent to Abbasia
• Depth to water table along Abbasia link canal in different years
• Water Quality Along Abbasia
• Water Table in Bahawalpur zone
• Seep-w Analysis to check the seepage of canal
• Mod-flow Analysis to Check the ground water condition with proposal

40
Water logging in Tehsil Sadiqabad of District Rahimyar Khan

Waterlogging - Causes
Broadly reasons for water logging are:
1. Sandy soils of the area
2. Sowing of sugarcane, a high delta crop
3. Excessive Dewatering in upper part, increased in level of
evaporation pond (No monitoring of Tubewells operation)
4. Exceptionally high flood of 2010 followed with heavy
rainfalls in August 2011
5. Energy Crisis (Low Voltage)
6. Low Lying Area
7. Adjacent to Evaporation Ponds
8. Water Level of Evaporation Ponds
41
Water logging in Hakra Branch Canal Command

Waterlogging – Causes
• Sandy soils
• Unlined Hakra Branch (Cut /Fill Section)
• Low Lying Area
• Seepage from across the Border
• Field Irrigation

42
Water logging in Abbasia and Punjnad Canal Commands

Waterlogging – Causes
• Seepage from Abbasia Link Canal

• Low Lying Area


• Cut/Fill Section of Abbasia Link Canal
• Changed Cropping Pattern (Sugarcane)
• 3R Drain not Functional
• Soil Strata

43
Waterlogged Irrigated Land in Tehsil Sadiqabad of
District Rahimyar Khan

44
Waterlogged Irrigated Land in in command area of
Hakra Branch canal in District Bahawalnagar

45
Waterlogged Irrigated Land in command area of
Abbassia canal system & along Panjnad Main Line

46
Proposed & Existing Drains in Water logged area
in Tehsil Sadiqabad of District Rahimyar Khan

47
Proposed & Existing Drains in Hakra Branch Canal
Command

48
Proposed Drains in Abbasia and Panjnad Canal
Commands

49
Command area of Hakra Branch canal in District
Bahawalnagar

50
Command area of Hakra Branch canal in District
Bahawalnagar

51
Command area of Hakra Branch canal in District
Bahawalnagar

52
Command area of Hakra Branch canal in District
Bahawalnagar

53
Command area of Hakra Branch canal in District
Bahawalnagar

54
Command area of Hakra Branch canal in District
Bahawalnagar

55
Command area of Hakra Branch canal in District
Bahawalnagar

56
Command area of Hakra Branch canal in District
Bahawalnagar

57
Proposed Drains in Abbasia Link Canal Command

58
Proposed Drains in Abbasia Link Canal Command

59
Proposed Drains in Abbasia Link Canal Command

60
Proposed Drains in Panjnad Canal Command

61
Proposed Drains in Panjnad Canal Command

62
Proposed Drains in Panjnad Canal Command

63
Groundwater Investigations In Command Area of Hakra Canal

64
Groundwater Investigations In Command Area of Hakra Canal

65
Groundwater Investigations In Command Area of Hakra Canal

66
Groundwater Investigations In Command Area of Hakra Canal

67
Groundwater Investigations In Command Area of
Hakra Canal

68
Groundwater Investigations In Command Area of Hakra Canal

Chak No.

Depth to W/T from RD 22+000 to 47+000 along Hakra Canal

69
Groundwater Investigations In Command Area of
Hakra Canal

70
Depth to W/T

0.0

-45.0
-40.0
-35.0
-30.0
-25.0
-20.0
-15.0
-10.0
-5.0
Chak No.
156/3L
195/3L
196/HB
204/9R
158/7R
157/7R
155/3L
154/3L
152/2L
151/1L
147/6R
160/7R
193/7R
197/8R
194/8R
239/9R
236/9R
239/HB
240/HB
241/HB
242/FC
Depth to ground W/T along HAKRA Canal

258/HL
233/9R
201/8R
199/7R
199/8R
168/7R
166/7R
Groundwater Investigations In Command Area of Hakra Canal

71
W/T
Groundwater Investigations In Command Area of Hakra Canal

Comparison of PIAP & DLR Data


Chak No. 241/HB 242/FC 239/9R 258/HL 233/9R 201/8R 199/8R 168/7R 166/7R
0.0

-5.0

-10.0

-15.0

-20.0
PIAP
Depth to W/T

DLR
-25.0

-30.0

-35.0

-40.0

-45.0

72
Groundwater Investigations In Command Area of Abbasia Link Canal

73
Groundwater Investigations In Command Area of Abbasia Link Canal

74
Groundwater Investigations In Command Area of
Abbasia Link Canal

75
Depth to W/T (ft)

-12
-10
-8
-4
-2

-6
Chak No.
85/A

313A

HQ

317/A

87/A

143/A

141/5R

158/DNB

33/A

38/A

144/5R

146/A

315/A

RD 226+000

150/7R

149/7R

179/7R

180/7R

174/7R

152/7R

147/A

141/5R

RD 160+000
Average Depth to ground W/T along Abbasia Link Canal

144/A

28/A

46/A
76
Groundwater Investigations In Command Area of Abbasia Link Canal
Water Table Elevation Contour Map (Pre-2014) – District RYK

77
Water Table Elevation Contour Map (Post-2014) – District RYK

78
Depth to Water table Map (Pre-2015) - District RYK

79
Depth to Water table Map (Post-2015) - District RYK

80
Assessment of Water Logging along Abbasia Link Canal
using Visual Mod Flow

Model is developed with two options

 Option - I : 3-R drainage system in working Condition


• Model results indicate that 3-R main drain lowers the water table
in the adjacent areas of the drain upto 2m.
• Effect of the drain reduces gradually away from the drain and
become 0 after 200 – 300ft.

 Option – II : 3 Parallel drains along Abbasia Link Canal with


three additional drains
• Seepage from canals will be intercepted by parallel drains
• 50 to 60% of the total water logged area will get relief and the
root zone will be cleared upto 5-6ft after 10 to 12 months.
RECLAIMING AGRICULTURE LAND AFFECTED DUE TO WATER
LOGGING IN RAHIMYAR KHAN DISTRICT

SEEP/W ANALYSIS RESULTS


Seepage Intercepted by Drain

Saturated Permeability Depth Average


Drain At RD At RD At RD At Source
Conductivity Ratio to GWT Seepage
0+500 10+000 20+000 RD 35+000

(ft/s) (Ky/Kx) (ft) (cusec/RD) (cusec/RD)

0 0.630 0.385 0.440 0.320 0.444

1 0.556 0.324 0.382 0.283 0.386

D1 2 0.482 0.256 0.319 0.244 0.325


0.000162 0.25
Drain 3 0.408 0.184 0.249 0.202 0.261

4 0.335 0.112 0.177 0.153 0.194

5 0.261 0.040 0.105 0.092 0.125

84
RECLAIMING AGRICULTURE LAND AFFECTED DUE TO WATER
LOGGING IN RAHIMYAR KHAN DISTRICT

SEEP/W ANALYSIS RESULTS

85
SUMMARY OF WORKS FOR RECLAMATION OF WATERLOGGED
AGRICULTURE LAND IN DISTRICT RAHIMYARKHAN
T/W
ORIGINAL T/W Exist. Proposed
Sr. LENGTH TO BE Prop.
DESCRIPTION OF WORK OUTFALL DRAIN / RD CHAK NO TOTAL LENGTH Capacity (2 Cs Capacity REMARKS
No. REHABILITATED (2 Cs
(Q cfs) Each) (Q cfs)
Each)
L-Section
1. Remodelling of 2/L Drain 123+882 (Manthar Drain) 31+568 31+568 20 9 7 42
revised
L-Section
2. Remodeling of 3/L Drain 138+579 (Manthar Drain) 18+007 18+007 9 5 4 24
revised
L-Section
3. Rehabilitation of 4/L Drain 180+652 (Manthar Drain) 17+700 17+700 17 6 3 24
revised
Rehabilitation of Manthar L-Section
4. Pond Area (Main Drain) 188+800 138+579 212 10 321
Drain revised
Rehabilitation of Pattan L-Section
5. 5+000 (Khanpur Drain) 34+000 22+000 156 266
Munara Drain revised

New
6. D-1 20+750 (Pattan Munara) 94P,95P,96P,98P, 35+879 - - 56
construction
136P,138P & 139P,
246P, 247/P, 249/P,
New
7. D-1 sub New Drain D-1 RD 24+400 250/P, and 251/P 13+031 - - 15
construction

132P,141P,142P & New


8. D-2 120+000 (Manthar Drain) 32+435 - - 37
143P construction
Rehabilitation of Khnapur L-Section
9. Pond Area (Main Drain) 40+855
Drain revised
400 Increase in
Upgradation of Pumps at 260cusecs
10. 07 No. cusecs discharge
Pump Station-3 (13 x 20)
(10 x 40) capacity
Construction of Pumping 60 cusecs New
11.
Station on Drain D-1 (3 x 20 cfs) construction
Construction of Pumping 40 cusecs New
12.
Station on Drain D-2 (2 x 20 cfs) construction
Providing & Installing
New
13. Tubewells on Khnpur & 10
construction
Jaraywala Drain
86
Cost Estimate
RECLAIMING AGRICULTURE LAND AFFECTED DUE TO WATER LOGGING IN
DISTRICT RAHIMYARKHAN.
Sr.
Description of Components Amount (Rs.) Amount(Rs. Million)
No.
A CIVIL WORKS AND MECHNICAL COST
Rehabilitation and Upgrading of Existing Drains
1 2-L Drain 48,519,360 48.519
2 3-L Drain 49,585,658 49.586
3 4-L Drain 23,766,209 23.766
4 Pattan Munara Drain 51,861,361 51.861
5 Manthar Main Drain 629,638,549 629.639
6 Khanpur Drain 65,055,040 65.055
Proposed Drains
7 D-1 Main Drain 72,775,147 72.775
8 D-1 Sub Drain 21,122,529 21.123
9 D-2 Main Drain 75,397,401 75.397
Total Cost - A 1,037,721,254 1,037.721
10 Physical Contingencies @ 2% 20,754,425 20.754
11 Total Cost with physical contingencies 1,058,475,679 1,058.476
B SOCIAL AND ENVIRONMENTAL MANAGEMENT COST
12 Land Acquisition 113,111,639 113.112
13 Environmental Management Plan 9,350,000 9.350
14 Tree Plantation @ 1% 10,377,213 10.377
Total Cost - B 132,838,852 132.839
C PROJECT MANAGEMENT SUPPORT
15 Construction Supervision Consultants Cost @ 4.5% 46,697,456 46.697
16 Price Contingencies @ 6.5% 67,451,882 67.452
17 Total Cost - C 114,149,338 114.149
Total Cost A, B, and C 1,305,463,869 1,305.464
87
Reclaiming Agricultural Land Affected by Water Logging in
Irrigation Zone Bahawalpur

STRUCTURES ON PROPOSED DRAINS IN TEHSIL SADIQABAD OF DISTRICT


RAHIMYAR KHAN

Structures Nos.

Box Culverts 34

Water Course Crossings 88

Inlets 74

Tube well Rooms 90

Village Road Bridges 24

88
Cost Estimate
RECLAMATION OF WATER LOGGED AGRICULTURE LAND IN DISTRICT BAHAWALNAGAR
Option 4: Providing Interceptor Drains along both sides of HB canal. (RD 185+000 to RD 285+920) as well as surface drains in command area of HB Canal.
(Left & Right Side) + Tubewells (Phase-II of the project)
Sr. No. Description of Components Amount (Rs.) Amount (Rs. Million)
A CIVIL WORKS
1 Earthwork of Drainage System 519,951,036 519.951
2 Box Culverts (76 Nos) Detail Attached 23,499,166 23.499
3 Aqueducts (6 Nos) Detail Attached 64,521,304 64.521
4 Water Course Crossing (93 Nos) Detail Attached 41,975,378 41.975
5 Inlets (149 Nos) Detail Attached 57,391,969 57.392
6 Tube Well Room (56 Nos) Detail Attached 17,022,320 17.022
7 Construction of New Quarter for Tube well Operator (56 Nos) 27,860,952 27.861
8 Out Fall Structures (1 Nos) 5,247,288 5.247
9 Linning of 3-L & 4-L Distys 148,621,978 148.622
10 Drainge Crossing (2 Nos) 14,259,357 14.259
Total Cost - A 920,350,748 920.351
B MECHANICAL AND ELECTRICAL WORKS
11 Installation of Tube Wells along Drains (56 Nos) 140,302,512 140.303
12 Installation of HT/LT network for operation of Tube Wells 200,000,000 200.000
Total Cost - B 340,302,512 340.303
Total Cost A and B 1,260,653,260 1,260.654
Physical Contingencies @ 2% 25,213,065 25.213
C Total Cost with physical contingencies 1,285,866,325 1,285.867
D SOCIAL AND ENVIRONMENTAL
13 Environmental Management Plan 7,300,000 7.300
14 Land Acquisition 191,097,903 191.098
15 Tree Plantation @ 1% 12,606,533 12.607
Total Cost - D 211,004,436 211.005
E PROJECT CONSTRUCTION MANAGEMENT
16 Construction Supervision Consultants Cost @ 5% 63,032,663 63.033
17 Price Contingencies @ 6.5% 81,942,462 81.942
Total Cost - E 144,975,125 144.975
Total Cost C, D, and E 1,641,845,885 1,641.847
89
Reclaiming Agricultural Land Affected by Water Logging in
Irrigation Zone Bahawalpur

STRUCTURES ON PROPOSED DRAINS IN HAKRA COMMAND

Structures No's
Box Culverts 76
Aqueducts 6
Water Course Crossings 93
Inlets 149
Tube Well Rooms 90
Out Fall Structures 2
Drainage Crossings 3

90
Reclaiming Agricultural Land Affected by Water Logging in
Irrigation Zone Bahawalpur
RECLAMATION OF WATER LOGGED AGRICULTURE LAND IN BAHAWALPUR IRRIGATION ZONE
ABBASIA LINK CANAL & PML
Sr. No. Description of Components Amount (Rs.) Amount (Rs. Million)
A CIVIL WORKS
1 Construction of Abbasia Right Drain RD. 0+000-45+000 73,777,310 73.777
2 Construction of Abbasia Right Drain RD. 0+000-75+000 148,769,215 148.769
3 Construction of Abbasia Left Drain RD. 0+000-45+000 73,777,310 73.777
4 Construction of 5R Drain 81,378,144 81.378
5 Construction of 7R Drain 180,519,927 180.520
6 Construction of 2R-1L Drain 368,565,053 368.565
7 PML Right Drain I 61,991,757 61.992
8 PML Right Drain II 92,250,590 92.251
9 PML Right Drain III 58,681,299 58.681
10 PML Left Drain I 43,633,083 43.633
11 PML Left Drain II 74,906,290 74.906
12 PML Left Drain III 38,643,661 38.644
Total Cost - A 1,296,893,640 1,296.894

B Electrical Works 16,260,000 16.260


C Mechanical Works 49,565,551 49.566
Total Cost - B 65,825,551 66
Total Cost A and B 1,362,719,191 1,362.719
Physical Contingencies @ 2% 27,254,384 27.254
C Total Cost with physical contingencies 1,389,973,574 1,389.974
D SOCIAL AND ENVIRONMENTAL
8 Environmental Management Plan 8,770,000 8.770
9 Land Acquisition 432,299,454 432.299
10 Tree Plantation @ 1% 13,627,192 13.627
Total Cost - D 454,696,646 454.697
E PROJECT CONSTRUCTION MANAGEMENT
11 Construction Supervision Consultants Cost @ 5% 68,135,960 68.136
12 Price Contingencies @ 6.5% 88,576,747 88.577
Total Cost - E 156,712,707 156.713
Total Cost C, D, and E 2,001,382,927 2,001.383
91
Reclaiming Agricultural Land Affected by Water Logging in
Irrigation Zone Bahawalpur

STRUCTURES ON PROPOSED DRAINS IN ABBASIA LINK CANAL COMMAND

Structures No's
Box Culverts 24
Village Road Bridges 1
Water Course Crossings 45
STRUCTURES ON PROPOSED DRAINS IN PUNJNAD CANAL COMMAND

Structures No's
Box Culverts 33
Village Road Bridges 6
Water Course Crossings 0

92
EXTENT OF WATER LOGGING IN PANJNAD COMMAND AREA

1988
EXTENT OF WATER LOGGING IN PANJNAD COMMAND AREA

1998
EXTENT OF WATER LOGGING IN PANJNAD COMMAND AREA

2008
EXTENT OF WATER LOGGING IN PANJNAD COMMAND AREA

2015
HISTORICAL VARIATION IN EXTENT WATER LOGGING
IN PANJNAD COMMAND AREA
Input Parameters & Results of Seepage Analysis for Proposed Surface Drains
Seepage
Soil Conductivity Depth to Seepage From Percentage
Case intercepted by Effectiveness
Conductivity Ratio GWT Hakra Canal Drain

Kx (Ky/Kx) (ft) Cusec/RD (ft^3/sec) (%)


Left Right
Drain Drain
Drains @ 50ft from
0.00032 0.25 0 1.318 0.616 0.449 80.8
Canal Bank

Drains @ 100ft from


0.00032 0.25 0 1.241 0.464 0.341 64.9
Canal Bank

Input Parameters & Results of Seepage Analysis for Proposed Interceptor Drains

Seepage Percentage
Soil Conductivity Depth to
Case Seepage From intercepted by Effectiveness
Conductivity Ratio GWT
Hakra Canal Drain
Kx (Ky/Kx) (ft) Cusec/RD (ft^3/sec) (%)
Left Right
Drain Drain
Drains @ 50ft from
0.00032 0.25 0 1.735 0.846 0.776 90
Canal Bank
98
MODFLOW

99
SEEP\W Analysis

100
Seepage Analysis of Hakra Canal

Hakra Canal

101
Hakra Canal with Proposed Surface Drains (Drains @50ft from Canal Bank Toe)

102
Hakra Canal with Proposed Surface Drains (Drains @100ft from Canal Bank Toe)

103
Model area with proposed drains

104
Elevations and Hydraulic properties assigned to the Model
(Source; FESS report)

105
Initial heads and location of observation wells

106
Drains and canals assigned to the model

107
Model results at Piezometers after 90 days of simulation

108
Water table Contours in option-II after 90 Days of Simulation

109
Depth to water table (meters) decline after 90 days along drains

110
Abbasia Link Canal

111
Abbasia Link Canal

112
Table 1-1 Input Parameters & Results of Seepage Analysis for Proposed Surface Drain Along
Abbasia Link Canal
Percentage
Seepage From Intercepted
Soil Conductivity Depth to Seepage intercepted
Case Abbasia Link Canal Seepage on one
Conductivity Ratio GWT by Drain
side

Kx (Ky/Kx) (ft) Cusec/RD (ft^3/sec) (%)


Left Right
Drain Drain
Drains @ 50ft from Canal
0.000162 0.25 0 1.573 - 0.473 30
Bank
Drains @ 100ft from
0.000162 0.25 0 1.549 - 0.432 27.8
Canal Bank

113
RECLAIMING AGRICULTURE LAND AFFECTED DUE TO WATER
LOGGING IN RAHIMYAR KHAN DISTRICT

SEEP/W ANALYSIS RESULTS

Seepage Analysis of D1 Drain at RD 0+500 (Depth to GWT = 0ft)

Seepage Analysis of D1 Drain at RD 0+500 (Depth to GWT = 2ft)


114
COMMAND AREA OF SADIQ BRANCH CANAL (TARINDA & GULLAN DISTY)-Distict RYK

COMMAND AREA OF SADIQ


BRANCH CANAL (TARINDA &
GULLAN DISTY)
COMMAND AREA OF ABBASIA CANAL SYSTEM-District RYK

COMMAND AREA OF ABBASIA FOCUSED AREA

CANAL SYSTEM
COMMAND AREA OF PANJNAD MAIN CANAL- Distict RYK

COMMAND AREA OF PANJNAD


MAIN CANAL
COMMAND AREA OF HAKRA BRANCH CANAL-Distict BWN

COMMAND AREA OF HAKRA


BRANCH CANAL
Geotechnical Investigations in Tehsil Sadiqabad of District Rahimyar Khan
Geotechnical Investigations in Command Area of Hakra Branch Canal – District BWN

GIP-03 GIP-04

GIP-05 GIP-06
Geotechnical Investigations in Command Area of Hakra Branch Canal – District BWN

GIP-07 GIP-08

Soil Samples For Laboratory Testing


Geotechnical Investigations in Command Area of Hakra Branch Canal – District BWN
Geotechnical Investigations in Command Area of Hakra Branch Canal – District BWN

GIP-01 GIP-02

GIP-03 GIP-04
Geotechnical Investigations in Command Area of Hakra Branch Canal – District BWN

GIP-05 GIP-06

GIP-07 GIP-08
Soil Samples For Laboratory Testing – District BWN
Geotechnical Investigations in Command Area of Abbasia Link & Panjand Main Line Canal
Meeting with Affectees - Waterlogging in Command Area of Abbasia Link Canal

127
Meeting with Affectees - Waterlogging in Command Area of Abbasia Link Canal

128
Meeting with Affectees - Waterlogging in Command Area of Abbasia Link Canal

129
Meeting with Affectees - Waterlogging in Command Area of Hakra Canal

130
Meeting with Affectees - Waterlogging in Command Area of Hakra Canal

131
Meeting with Affectees - Waterlogging in Command Area of Hakra Canal

132
Meeting with Affectees - Waterlogging in Command Area of Hakra Canal

133
Meeting with Affectees - Waterlogging in Command Area of Sadiq Branch Canal; in Tehsil
Sadiqabad, District Rahimyar Khan

134
Meeting with Affectees - Waterlogging in Command Area of Sadiq Branch Canal; in Tehsil
Sadiqabad, District Rahimyar Khan

135
X-Sections

136
X-Sections of Existing Drains

137
X-Sections of Existing Drains

138
X-Sections of Existing Drains

139
X-Sections of Existing Drains

140
X-Sections of Proposed Drains

141
X-Sections of Proposed Drains

142
X-Sections of Proposed Drains

143

Вам также может понравиться