PROJECT PREPARATION
PUNJAB IRRIGATED AGRICULTURE INVESTMENT
PROGRAMME (PIAIP)
2
Reclaiming Agricultural Land Affected by Water
Logging in Bahawalpur Zone
3
Reclaiming Agricultural Land Affected by Water Logging in
Irrigation Zone Bahawalpur
Waterlogging Locations:
Maps
II. In Command Area of Abbasia Canal System and along Panjnad Main
Line; Area Map Causes
III. In Command Area of Sadiq Branch Canal (Tarinda and Gullan Disty);
in Tehsil Sadiqabad, District Rahimyar Khan
Area Map Causes
4
In Command Area of Hakra Branch Canal in District Bahawalnagar
• Groundwater Investigations ✓ ✓ ✓
• Geotechnical Investigations ✓ ✓ ✓
5
In Command Area of Hakra Branch Canal in District Bahawalnagar
Option 4 : Side Seepage Drains on Both Sides of Hakra Branch Canal &
in command area + Tubewells (Recommended)
(Cost Estimate)
6
Reclaiming Agricultural Land Affected by Water Logging in Irrigation Zone Bahawalpur
SUMMARY OF WORKS FOR RECLAMATION OF WATERLOGGED AGRICULTURE LAND IN DISTRICT BAHAWALNAGAR
DESCRIPTION OF Proposed List of
Sr. Working TOTAL T/W Prop.
CONSTRUCTION WORKS Syphon/RD OUTFALL DRAIN / RD CHAK NO Capacity Structures REMARKS
No. Head LENGTH (2 Cs Each)
(New Drains) (Q cfs) (No.s)
1. Hassan Chowki Drain 26+770(Hakra Branch Canal) 245+475(Haroonabad Drain) 1.04 kot Abdulhaq,Bakhu shah 4+860 6 1
2. kot Abdulhaq Drain 0+474 (Hassan chowki Drain) 0.25 kot Abdulhaq,Bakhu shah 4+973 6 1
3. Bakhu Shah Drain 0+474 (Hassan chowki Drain) 0.25 kot Abdulhaq,Bakhu shah 2+765 4 1
4. korianwali Main Drain 42+660(Hakra Branch Canal) 227+470(Haroonabad Drain) 1.08 Korianwali 12+778 16 3
List of Struc. 9
Command Area of Sadiq Branch Canal (Tarinda and Gullan Disty);
in Tehsil Sadiqabad, District Rahimyar Khan
Options:
I. Tile Drains
II. Surface Drains With Tubewells
III. Surface Drains with outfall into Manthar & Pattan Munara drain(Recommended)
(Cost Estimate)
10
Reclaiming Agricultural Land Affected by Water Logging in
Irrigation Zone Bahawalpur
Proposed & Existing drains in Water logged area in Tehsil Sadiqabad of District Rahimyar Khan
X-Sections
List of Struc. 11
Reclaiming Agriculture Land Affected by Water Logging in
Irrigation Zone Bahawalpur
PROJECT COST
14
Condition Survey in Command Area of Hakra Canal with S.E Bahawalpur
15
Condition Survey in Command Area of Hakra Canal with S.E Bahawalpur
16
Condition Survey in Command Area of Hakra Canal with S.E Bahawalpur
17
Field Visit of 3R Drainage System With S.E Bahawalpur
19
Waterlogging Along Hakra Canal at RD 25+500
20
Site Visit / Condition Survey – District BWN
24
Escape – Abbasia Feeder
25
RD 157-158 of 3R Drain
26
Syphon – Trukari Drain
27
Outfall of 3R Drain into Trukari Drain (RD 0+000 of 3R Drain)
28
Outfall of Basit Drain at RD 41+000 of 3R Drain
3R Drain
29
Pumping Station-3 (RD 0+000 of Manthar Drain)
30
Pumping Station-3 (RD 0+000 of Manthar Drain)
31
3L Drain Outfall (RD 0+000)
32
Hydraulic Survey
33
Hydraulic Survey – District RYK
D/S Confluence of
3 Khanpur and Pattan 24-09-2016 164.5 1.37 225.8
Munara Drain
39
Reclaiming Agricultural Land Affected by Water Logging in
Irrigation Zone Bahawalpur
Analysis Results
40
Water logging in Tehsil Sadiqabad of District Rahimyar Khan
Waterlogging - Causes
Broadly reasons for water logging are:
1. Sandy soils of the area
2. Sowing of sugarcane, a high delta crop
3. Excessive Dewatering in upper part, increased in level of
evaporation pond (No monitoring of Tubewells operation)
4. Exceptionally high flood of 2010 followed with heavy
rainfalls in August 2011
5. Energy Crisis (Low Voltage)
6. Low Lying Area
7. Adjacent to Evaporation Ponds
8. Water Level of Evaporation Ponds
41
Water logging in Hakra Branch Canal Command
Waterlogging – Causes
• Sandy soils
• Unlined Hakra Branch (Cut /Fill Section)
• Low Lying Area
• Seepage from across the Border
• Field Irrigation
42
Water logging in Abbasia and Punjnad Canal Commands
Waterlogging – Causes
• Seepage from Abbasia Link Canal
43
Waterlogged Irrigated Land in Tehsil Sadiqabad of
District Rahimyar Khan
44
Waterlogged Irrigated Land in in command area of
Hakra Branch canal in District Bahawalnagar
45
Waterlogged Irrigated Land in command area of
Abbassia canal system & along Panjnad Main Line
46
Proposed & Existing Drains in Water logged area
in Tehsil Sadiqabad of District Rahimyar Khan
47
Proposed & Existing Drains in Hakra Branch Canal
Command
48
Proposed Drains in Abbasia and Panjnad Canal
Commands
49
Command area of Hakra Branch canal in District
Bahawalnagar
50
Command area of Hakra Branch canal in District
Bahawalnagar
51
Command area of Hakra Branch canal in District
Bahawalnagar
52
Command area of Hakra Branch canal in District
Bahawalnagar
53
Command area of Hakra Branch canal in District
Bahawalnagar
54
Command area of Hakra Branch canal in District
Bahawalnagar
55
Command area of Hakra Branch canal in District
Bahawalnagar
56
Command area of Hakra Branch canal in District
Bahawalnagar
57
Proposed Drains in Abbasia Link Canal Command
58
Proposed Drains in Abbasia Link Canal Command
59
Proposed Drains in Abbasia Link Canal Command
60
Proposed Drains in Panjnad Canal Command
61
Proposed Drains in Panjnad Canal Command
62
Proposed Drains in Panjnad Canal Command
63
Groundwater Investigations In Command Area of Hakra Canal
64
Groundwater Investigations In Command Area of Hakra Canal
65
Groundwater Investigations In Command Area of Hakra Canal
66
Groundwater Investigations In Command Area of Hakra Canal
67
Groundwater Investigations In Command Area of
Hakra Canal
68
Groundwater Investigations In Command Area of Hakra Canal
Chak No.
69
Groundwater Investigations In Command Area of
Hakra Canal
70
Depth to W/T
0.0
-45.0
-40.0
-35.0
-30.0
-25.0
-20.0
-15.0
-10.0
-5.0
Chak No.
156/3L
195/3L
196/HB
204/9R
158/7R
157/7R
155/3L
154/3L
152/2L
151/1L
147/6R
160/7R
193/7R
197/8R
194/8R
239/9R
236/9R
239/HB
240/HB
241/HB
242/FC
Depth to ground W/T along HAKRA Canal
258/HL
233/9R
201/8R
199/7R
199/8R
168/7R
166/7R
Groundwater Investigations In Command Area of Hakra Canal
71
W/T
Groundwater Investigations In Command Area of Hakra Canal
-5.0
-10.0
-15.0
-20.0
PIAP
Depth to W/T
DLR
-25.0
-30.0
-35.0
-40.0
-45.0
72
Groundwater Investigations In Command Area of Abbasia Link Canal
73
Groundwater Investigations In Command Area of Abbasia Link Canal
74
Groundwater Investigations In Command Area of
Abbasia Link Canal
75
Depth to W/T (ft)
-12
-10
-8
-4
-2
-6
Chak No.
85/A
313A
HQ
317/A
87/A
143/A
141/5R
158/DNB
33/A
38/A
144/5R
146/A
315/A
RD 226+000
150/7R
149/7R
179/7R
180/7R
174/7R
152/7R
147/A
141/5R
RD 160+000
Average Depth to ground W/T along Abbasia Link Canal
144/A
28/A
46/A
76
Groundwater Investigations In Command Area of Abbasia Link Canal
Water Table Elevation Contour Map (Pre-2014) – District RYK
77
Water Table Elevation Contour Map (Post-2014) – District RYK
78
Depth to Water table Map (Pre-2015) - District RYK
79
Depth to Water table Map (Post-2015) - District RYK
80
Assessment of Water Logging along Abbasia Link Canal
using Visual Mod Flow
84
RECLAIMING AGRICULTURE LAND AFFECTED DUE TO WATER
LOGGING IN RAHIMYAR KHAN DISTRICT
85
SUMMARY OF WORKS FOR RECLAMATION OF WATERLOGGED
AGRICULTURE LAND IN DISTRICT RAHIMYARKHAN
T/W
ORIGINAL T/W Exist. Proposed
Sr. LENGTH TO BE Prop.
DESCRIPTION OF WORK OUTFALL DRAIN / RD CHAK NO TOTAL LENGTH Capacity (2 Cs Capacity REMARKS
No. REHABILITATED (2 Cs
(Q cfs) Each) (Q cfs)
Each)
L-Section
1. Remodelling of 2/L Drain 123+882 (Manthar Drain) 31+568 31+568 20 9 7 42
revised
L-Section
2. Remodeling of 3/L Drain 138+579 (Manthar Drain) 18+007 18+007 9 5 4 24
revised
L-Section
3. Rehabilitation of 4/L Drain 180+652 (Manthar Drain) 17+700 17+700 17 6 3 24
revised
Rehabilitation of Manthar L-Section
4. Pond Area (Main Drain) 188+800 138+579 212 10 321
Drain revised
Rehabilitation of Pattan L-Section
5. 5+000 (Khanpur Drain) 34+000 22+000 156 266
Munara Drain revised
New
6. D-1 20+750 (Pattan Munara) 94P,95P,96P,98P, 35+879 - - 56
construction
136P,138P & 139P,
246P, 247/P, 249/P,
New
7. D-1 sub New Drain D-1 RD 24+400 250/P, and 251/P 13+031 - - 15
construction
Structures Nos.
Box Culverts 34
Inlets 74
88
Cost Estimate
RECLAMATION OF WATER LOGGED AGRICULTURE LAND IN DISTRICT BAHAWALNAGAR
Option 4: Providing Interceptor Drains along both sides of HB canal. (RD 185+000 to RD 285+920) as well as surface drains in command area of HB Canal.
(Left & Right Side) + Tubewells (Phase-II of the project)
Sr. No. Description of Components Amount (Rs.) Amount (Rs. Million)
A CIVIL WORKS
1 Earthwork of Drainage System 519,951,036 519.951
2 Box Culverts (76 Nos) Detail Attached 23,499,166 23.499
3 Aqueducts (6 Nos) Detail Attached 64,521,304 64.521
4 Water Course Crossing (93 Nos) Detail Attached 41,975,378 41.975
5 Inlets (149 Nos) Detail Attached 57,391,969 57.392
6 Tube Well Room (56 Nos) Detail Attached 17,022,320 17.022
7 Construction of New Quarter for Tube well Operator (56 Nos) 27,860,952 27.861
8 Out Fall Structures (1 Nos) 5,247,288 5.247
9 Linning of 3-L & 4-L Distys 148,621,978 148.622
10 Drainge Crossing (2 Nos) 14,259,357 14.259
Total Cost - A 920,350,748 920.351
B MECHANICAL AND ELECTRICAL WORKS
11 Installation of Tube Wells along Drains (56 Nos) 140,302,512 140.303
12 Installation of HT/LT network for operation of Tube Wells 200,000,000 200.000
Total Cost - B 340,302,512 340.303
Total Cost A and B 1,260,653,260 1,260.654
Physical Contingencies @ 2% 25,213,065 25.213
C Total Cost with physical contingencies 1,285,866,325 1,285.867
D SOCIAL AND ENVIRONMENTAL
13 Environmental Management Plan 7,300,000 7.300
14 Land Acquisition 191,097,903 191.098
15 Tree Plantation @ 1% 12,606,533 12.607
Total Cost - D 211,004,436 211.005
E PROJECT CONSTRUCTION MANAGEMENT
16 Construction Supervision Consultants Cost @ 5% 63,032,663 63.033
17 Price Contingencies @ 6.5% 81,942,462 81.942
Total Cost - E 144,975,125 144.975
Total Cost C, D, and E 1,641,845,885 1,641.847
89
Reclaiming Agricultural Land Affected by Water Logging in
Irrigation Zone Bahawalpur
Structures No's
Box Culverts 76
Aqueducts 6
Water Course Crossings 93
Inlets 149
Tube Well Rooms 90
Out Fall Structures 2
Drainage Crossings 3
90
Reclaiming Agricultural Land Affected by Water Logging in
Irrigation Zone Bahawalpur
RECLAMATION OF WATER LOGGED AGRICULTURE LAND IN BAHAWALPUR IRRIGATION ZONE
ABBASIA LINK CANAL & PML
Sr. No. Description of Components Amount (Rs.) Amount (Rs. Million)
A CIVIL WORKS
1 Construction of Abbasia Right Drain RD. 0+000-45+000 73,777,310 73.777
2 Construction of Abbasia Right Drain RD. 0+000-75+000 148,769,215 148.769
3 Construction of Abbasia Left Drain RD. 0+000-45+000 73,777,310 73.777
4 Construction of 5R Drain 81,378,144 81.378
5 Construction of 7R Drain 180,519,927 180.520
6 Construction of 2R-1L Drain 368,565,053 368.565
7 PML Right Drain I 61,991,757 61.992
8 PML Right Drain II 92,250,590 92.251
9 PML Right Drain III 58,681,299 58.681
10 PML Left Drain I 43,633,083 43.633
11 PML Left Drain II 74,906,290 74.906
12 PML Left Drain III 38,643,661 38.644
Total Cost - A 1,296,893,640 1,296.894
Structures No's
Box Culverts 24
Village Road Bridges 1
Water Course Crossings 45
STRUCTURES ON PROPOSED DRAINS IN PUNJNAD CANAL COMMAND
Structures No's
Box Culverts 33
Village Road Bridges 6
Water Course Crossings 0
92
EXTENT OF WATER LOGGING IN PANJNAD COMMAND AREA
1988
EXTENT OF WATER LOGGING IN PANJNAD COMMAND AREA
1998
EXTENT OF WATER LOGGING IN PANJNAD COMMAND AREA
2008
EXTENT OF WATER LOGGING IN PANJNAD COMMAND AREA
2015
HISTORICAL VARIATION IN EXTENT WATER LOGGING
IN PANJNAD COMMAND AREA
Input Parameters & Results of Seepage Analysis for Proposed Surface Drains
Seepage
Soil Conductivity Depth to Seepage From Percentage
Case intercepted by Effectiveness
Conductivity Ratio GWT Hakra Canal Drain
Input Parameters & Results of Seepage Analysis for Proposed Interceptor Drains
Seepage Percentage
Soil Conductivity Depth to
Case Seepage From intercepted by Effectiveness
Conductivity Ratio GWT
Hakra Canal Drain
Kx (Ky/Kx) (ft) Cusec/RD (ft^3/sec) (%)
Left Right
Drain Drain
Drains @ 50ft from
0.00032 0.25 0 1.735 0.846 0.776 90
Canal Bank
98
MODFLOW
99
SEEP\W Analysis
100
Seepage Analysis of Hakra Canal
Hakra Canal
101
Hakra Canal with Proposed Surface Drains (Drains @50ft from Canal Bank Toe)
102
Hakra Canal with Proposed Surface Drains (Drains @100ft from Canal Bank Toe)
103
Model area with proposed drains
104
Elevations and Hydraulic properties assigned to the Model
(Source; FESS report)
105
Initial heads and location of observation wells
106
Drains and canals assigned to the model
107
Model results at Piezometers after 90 days of simulation
108
Water table Contours in option-II after 90 Days of Simulation
109
Depth to water table (meters) decline after 90 days along drains
110
Abbasia Link Canal
111
Abbasia Link Canal
112
Table 1-1 Input Parameters & Results of Seepage Analysis for Proposed Surface Drain Along
Abbasia Link Canal
Percentage
Seepage From Intercepted
Soil Conductivity Depth to Seepage intercepted
Case Abbasia Link Canal Seepage on one
Conductivity Ratio GWT by Drain
side
113
RECLAIMING AGRICULTURE LAND AFFECTED DUE TO WATER
LOGGING IN RAHIMYAR KHAN DISTRICT
CANAL SYSTEM
COMMAND AREA OF PANJNAD MAIN CANAL- Distict RYK
GIP-03 GIP-04
GIP-05 GIP-06
Geotechnical Investigations in Command Area of Hakra Branch Canal – District BWN
GIP-07 GIP-08
GIP-01 GIP-02
GIP-03 GIP-04
Geotechnical Investigations in Command Area of Hakra Branch Canal – District BWN
GIP-05 GIP-06
GIP-07 GIP-08
Soil Samples For Laboratory Testing – District BWN
Geotechnical Investigations in Command Area of Abbasia Link & Panjand Main Line Canal
Meeting with Affectees - Waterlogging in Command Area of Abbasia Link Canal
127
Meeting with Affectees - Waterlogging in Command Area of Abbasia Link Canal
128
Meeting with Affectees - Waterlogging in Command Area of Abbasia Link Canal
129
Meeting with Affectees - Waterlogging in Command Area of Hakra Canal
130
Meeting with Affectees - Waterlogging in Command Area of Hakra Canal
131
Meeting with Affectees - Waterlogging in Command Area of Hakra Canal
132
Meeting with Affectees - Waterlogging in Command Area of Hakra Canal
133
Meeting with Affectees - Waterlogging in Command Area of Sadiq Branch Canal; in Tehsil
Sadiqabad, District Rahimyar Khan
134
Meeting with Affectees - Waterlogging in Command Area of Sadiq Branch Canal; in Tehsil
Sadiqabad, District Rahimyar Khan
135
X-Sections
136
X-Sections of Existing Drains
137
X-Sections of Existing Drains
138
X-Sections of Existing Drains
139
X-Sections of Existing Drains
140
X-Sections of Proposed Drains
141
X-Sections of Proposed Drains
142
X-Sections of Proposed Drains
143