Operation Strategy
Outline
Control Algorithms
Operation Strategy
Alarm Analysis
1xx Yaw System
2xx Hydraulic Group
4xx Gearbox
5xx Generator
7xx Communications
8xx Pitch
Alarms that trip switch gear
Simplified Control Scheme
Additional text
Control Algorithms
Additional text
Control Algorithms
Start up:
Without wind
Turbine awaiting wind without orienting y blades at 40º
With increase in wind pitch angle descreases (with respect to tower) y rotor
increases speed.
At cut in speed, turbine couples to grid.
With wind
With increase in wind pitch descreases y rotor revolutions increase.
At cut in speed turbine couples to grid.
The condition necessary is that the wind velocity is below the value necessary to rearm the
turbine after the high wind alarm. In case of the contrary, the turbine waits for the wind
speed to lower before restarting.
The other condition is the the turbine components are in their required temperature ranges
for normal function.
Operation Strategy
Stop:
Slow stop: (when going to pause) Blades feather slowly and power
decreases slowly.
Emergency to Stop
Emergency procedure ended.
No alarms that require emergency state.
Generator rotor in position test (Ingeteam)
Stop to Pause
No alarms that require stop state.
Pressure correct in hydraulic group.
Hub emergency procedure ended.
Pause to Run
No alarms that require pause state.
Turbine aligned to wind.
Wind under a certain value.
Generator rotor in position test (Ingeteam)
Operation Strategy – Connection to the
Grid
Ingeteam converters need initial rotor position with respect to stator before
grid coupling.
Turbine is stopped and CCU injects a current into the rotor and the current
output is measured in the stator terminals.