• Observations
• Conclusion
• References
3
POWER
GENERATION
SOURCES OF POWER
CAPTIVE POWER PLANT
• INSTALLED CAPACITY = 536.6MW
RM
HP ISB
H CC
CC 63
62
JUNCTION
HOUSE 14
CC
66
JUNCTI
ON
TPP BUNKER CC
HOUSE
FLOOR CC 68 67 13
CC
69
BUNKERS
PROCESS FLOW CHART PROCESS STEAM
WATER
MAIN STEAM
TURBINE GENERATOR POWER
CHEMICAL WATER DM WATER
TREATMENT PLANT
COLD BLAST
TURBINE BLOWER
DEAERAT- 140°C 4.75 KSCA, 135°C
OR 6067 NM3/hr
110 Ksca
BOILER DRUM SUPER HEATER 17Kg/Cm2
440°C 10°C
COAL HANDLING
PLANT 1.0196 KSCA
BFP LP
FLUE GAS
HEATER CONDEN-
1035 °C,422 t/hr CER AIR
BOILER AIR PRE -
148Ksca 140°C
FURNACE COOLER
530°C
PULVERI-
SER 54°C CEP
112.5 Ksca 230°C 8°C
ECONOMI- HP
283°C SER HEATER 860 M3/hr
PA FAN
VOLUME 2300
m3
RC PUMP CHILLED
CO GAS 200 mmWC,
HOUSE WATER
40°C 367°C PLANT
AIR FROM
BF GAS 300 mmWC AIR
FD FAN ATMOSPHERE
HEATER
40°C
COOLING
150°C MAKEUP TOWER
FUEL OIL STATION HSD
450 t/hr WATER
CHIMNEY
ELECTRO
ID FLUE GAS
STATIC
PRECIPITA- FAN
TOR
FLY ASH
BOTTOM ASH ASH HANDLING
PLANT TO ASH POND
BOILERS
• Boilers: 6 (5 working + 1 Standby)
• Temperature: 540o C
• Fuels: 1. Pulverised Coal
2. BF Gas
3. CO Gas
4. Furnace oil / LSHS
Thermal Power Plant
OIL
0.07%
BFG 23%
COAL 46.8%
COG
30%
Main Features :
• Electro Hydraulic Turbine Governing System.
220KV GIS
Generator
Transformer
(GT) 160MVA
220/15.75 KV
IPBD Busduct
Unit Auxiliary
G Transformer
CB (UAT-2) 25MVA
15.75/6.6 KV
USG-1 USG-2
28
2. In VSP, the power generation is for the utilization by the plant
itself and not for economic purpose, such a generating plant is
called Captive Power Plant.
TPP-1 utilizes multiple fuels such as:
• Coke at elevation stage 1
• Oil at elevation stage 2
• BF Gas at elevation stage 3
• CO Gas at elevation stage 4 for the process.
• These are fired tangentially into the boiler furnace.
29
3.TPP-2 utilizes only gas based fuels such as:
• BF Gas
• CO Gas
• These are fired axially into the boiler furnace.
• The main advantages of TPP-2 are it is dust-free because the
fuels used do not contain
• coal and hence no ESPs are required. Moreover, this plant
uses the by-product gases of
• the other departments such as blast furnace and coke oven
which are available for free of
• cost to TPP-2. So this plant is an added asset to VSP.
30