must be longer than the time needed to make the person to evacuate the building. Blocked cooling vents. Overloaded electrical systems. Fuel storage areas with high oxygen concentration. Incorrectly installed wiring. Misuse of electrical appliances. Terrorist Attacks. Spalling of concrete in high temperature. Reduction of strength. Makes the Steel more ductile due to maximum temperature. It causes thermal expansion and initiates crack formation in reinforced area. Steel attain super plasticity stage due to maximum fire ( which occurs rarely ). Building having more than 18m height or basement having 10m below needs fire fighting shaft. Prohibiting highly inflammable materials inside the facility. Periodical inspection for fire safety. Placing fire extinguishers in easily accessible places. Maintaining fire alarm systems for detection and warning of fire. All construction materials must be non- combustible. The interior finish materials should not be inflammable. The internal wall of staircase should be in brick or RC with minimum 2 hrs fire rating. Proper ventilation should be provided in every landing of staircase. Electrical distribution cables are laid in a separate duct. The ducts are sealed with non-combustible materials. Emergency lights are provided in staircases and corridors. All wires and other accessories used for emergency lightings shall have fire retardant property. FIRE LIFT FIRE DAMPERS FIRE ALARM FIRE CONTROL ROOM SPRINKLERS One fire lift for 1200m2 . Loading capacity of 545kg (8Persons). Automatic closing doors of minimum width of 0.8m.
Separate electrical supply mains.
Lightings and fans are protected inside sheet steel panelling. The word “FIRE LIFT” is displayed in fluorescent paint.
Frequency of the lift to reach the top from ground floor
within a minute.
Lift doors having a fire resistance up to ½ hr.
Assembly Point. Shall be provided in 15m2 Situated outside the building. The area should not be aggrandized. It should be used if the height of the building is more than 24m.
It should be located
At the fire separation wall.
Where the ducts pass through
floors.
Where ducts/passages enter the
central vertical shaft.
It should be operate automatically and
simultaneously switch off in the air handling fans. It should be placed if the height of building is more than 15m. Two types Manually operated and Automatically operated If the buildings having 30m height fire control room is necessary. Placed in entrance of building with communication system for all floors. Displayed all floor plans with fire fighting equipments. Effective method. It will resist all structures from the effect of fire. In that pipe, water is in high pressure. Sin Q
Cos Q Tan Q Prevention is better than cure .......