Вы находитесь на странице: 1из 6

Bus Rapid Transit (BRT)

Project

Tangerang City
Urban Transportation
INDONESIA Tangerang City
City Profile
Vision of the city: To create the Tangerang City
that is advanced, autonomous, dynamic, and
prosperous, together with the society having
akhlaqul karimah (high ethical behaviour).

• Consist of 13 Distict,
104 Sub-District
• Area : 184,4 km2
(Including Soekarno Hatta
International Airport: 19,7 km2)
• Population:
1,9 million inhabitant
• Average density:
10,340 people/km2
• Population growth rate:
7,83%

Source: Indonesian Statistic Central Bureau, 2013


Integrated Terminal (Terminal Terpadu)
Compeleted View of
Revitalization Integrated Terminal Project
Radial and Loop Line Plan for BRT
Urban Challenge Project
Classification Description

Title : Bus Rapid Transit Project


Type of Project : Transportation Project
Issues :• congestion problems getting worse;
• high population growth as urbanization destination;
• high growth of vehicle ownership;
• Title : Kota Lama Revitalization Project
• shifting tranposrtation mode, from public to private;
• Type • inadequacy
of Project : Urban Renewal
of public transport;
• limmited capacity and space of road infrastructure.
Objectives : • to alleviate road congestion problems;
• to incerase mobility and connectivity;
• to provide appropriate public transportation.
Plans : • establishing new radial and loop lines for local BRT
system;
• integrating proposed local BRT line with existing
intercity BRT line;
• Revitalizing Integrated Terminal (Terminal Terpadu)
• Establising organisazation to run local BRT system

Вам также может понравиться