Академический Документы
Профессиональный Документы
Культура Документы
ENGINEERING
(MITE)
PRESENTATION ON TOPIC
“SLAB TRACK”
Under the guidance of
JAYANTH KS
Asst. Professor
dept. of civil engineering MITE
presented by
SUNIL KUMAR BS
4MT14CV419
Contents
• Sleepers
• Rails
3
Problems in ballast track
5
History of slab track
• Subsoil conditions
• Concrete bearing layer
• Asphalt bearing layer
• Hydraulically bonded bearing layer
• Frost protective layer (Sub structure)
8
Comparison between slab track and
ballasted track
9
Components of Slab Track
10
Construction of Slab Track
13
Disadvantages of Slab Track
• High initial cost.
• Installation time.
• Future updates.
• Repair concepts.
14
Refferences
[1] Karthiga p et al. “Analysis and design of ballastless track slab” IJETAE, vol-4, June 2014.
[2] Xiaoyan lei 1 and bin zhang, analysis of dynamic behavior for slab track of high- speed
railway based on vehicle and track element, journal of transportation engineering,
ASCE/April 2011/227
[3] Georgious michas, “slab track systems for high speed railways” royal institute of
technology SE-100 44 stock holm, Sweden 2012
[4] M.J.M.M. steenbergen, A.V. metrikine, Cesveld, assessment of design parameter of a
slab track railway system, journal of sound and vibration 306 (2007) 361-371.
[5] https://en.wikipedia.org/wiki/Railroad_tie#Ballastless_track
15
Thank you for your attention
16