earth fill embankment dam on the Bhagirathi river near Tehri in Uttarakhand,India.
The dam construction began in the
year 1978.It started working from 2006. TECHNICAL DETAILS:
Type of dam : Earth and Rock fill dam
River : Bhagirathi Height : 260.5m Length : 575m Construction began : 1978 Opened : 2006 Surface area : 52 sq.m Costruction cost : 1Billion USD Gross storage : 3540 million cumec Live storage : 2615 millio cumec Zone seismic : zone-IV It is constructed for the generation of electricity,and the dam has a capacity for generation of 1000 megawatts of hydroelectricity.
Flood moderation during monsoon by storing exess water.
It provides irrigation to an area of 270,000 hectares and irrigation stabilization to an area of 600,000 hectares.
To supply drinking water.It supplies 270 million imperial
gallons of drinking water per day to industrial areas of Delhi,Uttar Pradesh and uttarakand. TEHRI HYDRO POWER COMPLEX
1. Tehri dam hydro power plant(1000MW).
2. Koteshwar hydro electric project(400MW):
It is 97m high. It is 14 miles downstream of tehri. under construction and completely or partially submerge 16 villages.
3. Tehri pumped storage plant(PSP)1000MW.
Likely to impact on biodiversity i.e,flora and fauna of the area. Obstruction of movements of migrating fishes.
Rivers carry lot of sediment which will be locked up by the
construction of dam and eats away storage capacity. Water accumulation on u/s causes inundation of land.
There is a problem of water-logging and salinity of the land in
the command area. SAFETY MEASURES TAKEN:
Afforestation in an area of 4586.07hactares.
Development of fish farms Green belt along the rim of the reservoir. DUE TO THE CONSTRUCTION OF DAM 23 villages were fully submerged and 73 villages were partly submerged along with tehri.
14349 families were effected.
2.582 th.ha of forest land,1.6 th.ha of cuturable land,2.883
th.ha of other lands were effected.
The total land effected due to the construction of dam was
7.065 th.ha. Sundarlal Bahuguna,Veerendhra datt saklani and local people opposed the construction because it rests in an area prone to earthquake. The possible earthquake could crack the dam,which results in disaster unknown in human history. The downstream population in the holy cities of Devaprayaga,Rishikesh and Haridwar would be wiped off,thousands of people would be killed. Tehri dam is situated in highly active central himalayan seismic zone,a major geological fault zone.
It is designed to withstand earthquake of upto 7.2 on the
Ritcher scale but experts predict that earthquake of magnitude 8.5 or more could strike this region.
A major landslide could cause a huge wave which could
overtop the dam and many places like Haridwar,Meerut etc., CONCLUSION
Tehri is “an enormous squandering of public money”.
It is the 5th tallest dam in the world.
It is described as “one of the most dangerous dams in the
world”.
AWARDS:
International milestone project award in 2009.
Power line award in 2012. India’s best project award in 2011. QUESTIONS
1. What is the type of the dam and on which river it is