Crushing Process

Trainer: Mr. SEM Kosal


Trainee: SOCHEA Ros
Content

28/03/2019 2
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
28/03/2019 3
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
Raw Material Preparation

Limestone Crusher Auxiliary Crusher

• Jaw Crusher: Primary • Double roller crusher


• Cone Crusher: Secondary • Hammer crusher

28/03/2019 4
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
Pile method

High Grade

• Windrow method for premix 10


• Conical shell for high grade 9
8
limestone 5 6 7
• Pile 1 & 2: 2,5000T 1 2 3 4
• Pile 3 & 4: 2500T
28/03/2019 5
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
Chute Blockage

Part Failure

Chute
Material Design
Blockage

28/03/2019 6
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
Chute Blockage

28/03/2019 7
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
Chute Damage

• Spillage from chute due to leakage


• Wasting time for housekeeping
• Effect to the production rate (feed rate)

28/03/2019 8
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
28/03/2019 9
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
Production Rate Low

Over size of rock from quarry

Production
Screening
Rate Low

Secondary Crusher

Decreased feed from Dump truck

28/03/2019 10
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
28/03/2019 11
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
Identify chute blockage

• Liner fail
Part • Belt Skirt loose
Failure • Other part damage

Chute Wrong
Material Design
Blockage
• Big piece of Clay • Small dimension
from Quarry chute
• Sticky Soil • Wrong Curve
• Big output from design
Crusher
28/03/2019 12