Академический Документы
Профессиональный Документы
Культура Документы
28/03/2019 2
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
28/03/2019 3
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
Raw Material Preparation
28/03/2019 4
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
Pile method
High Grade
Part Failure
Chute
Material Design
Blockage
28/03/2019 6
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
Chute Blockage
28/03/2019 7
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
Chute Damage
28/03/2019 8
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
28/03/2019 9
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
Production Rate Low
Production
Screening
Rate Low
Secondary Crusher
28/03/2019 10
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
28/03/2019 11
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.
Identify chute blockage
• Liner fail
Part • Belt Skirt loose
Failure • Other part damage
Chute Wrong
Material Design
Blockage
• Big piece of Clay • Small dimension
from Quarry chute
• Sticky Soil • Wrong Curve
• Big output from design
Crusher
28/03/2019 12
CHIP MONG INSEE CEMENT CORPORATION © | All Rights Reserved.