ProTrack Training for Operations Team

Venugopal R
10-Oct-11

© 2009
2008 MindTree Consulting
Agenda

 Training Objective
 ProTrack – An Overview
 Fitment with OTC Cycle
 Project Life Cycle
 Authorization Matrix – Access Control
 ProTrack – Highlights
 ProTrack – Operations Activities
 ProTrack – Custom Enhancements

© 2008 MindTree Consulting Slide 2


Training Objective

 The Objective of this training is to provide the detailed Training on


the ProTrack (cProjects 4.5) for Operations team activities.

© 2008 MindTree Consulting Slide 3


ProTrack Fitment into OTC Cycle

© 2008 MindTree Consulting Slide 4


Project Life Cycle
PIN
mPower id
Close Project
Baseline metrics PROJECT
PLANNING
CYCLE
1. Project Level
Monitoring &
Control-> Details (Ops)
Re-planning

2. Project WBS
Project
Execution Holder using
template (Ops)

9. Baseline and Release


Plan 3. Create Project and
WBS in PS (Ops)

8. Run reports and


verify plan 4. Create Tasks &
Milestones

7. Assign tasks to 5. Dependencies &


people Scheduling
6. Add Project
roles & staff
people (Ops)

© 2008 MindTree Consulting Slide 5


ProTrack - High Level Authorization Matrix

Role Access Remarks

1.Project creation
2.Assign project template Project mPower id is non-editable.
Operations 3.Project Level authorization All projects are editable by Ops. There is no hierarchy built for
4.Role creation, updation, deletion Ops.
5.Staffing - creation, updation,

1.Include project template Access mentioned here is applicable to people who are
2.Task creation, updation, deletion assigned as PMs for project.
3.Task assignment People having mPower PM access will get read only access
Project Manager 4.Version control to all projects.
5.Reports Deletion of task is possible only if time is not booked and
6.Project Level authorization project is not in Transfer state.
7.Create roles in simulation mode PM can give access to the project to anyone.

1.DM has read only access to all projects


Delivery Manager/Qcat 2.For Qcat access has to be provided by the PM Refers to delivery manager access in mPower.
3.Reports

1.Template creation
OPG 2.Version Management Currently this role does not exist in mPower.
3.Task Type and COQ management

1.Read only access for the project staffed in. Team members will not have any access for projects in which
Team member
2.Edit task if access is given by the PM. they are not staffed in.

All others 1.PM can give access to the project to anyone.

© 2008 MindTree Consulting Slide 6


ProTrack - Highlights

 Restricted Authorization control


 Classification of Project Types based on Business Units
 BP Number is same as Employee ID
 No Project End Date Maintenance
 Do not release the ProTrack Project
 OPS to Create PS Project, Maintain Start Date and End Date, Release PS Project
 Billing Template in PS is limited to milestones without any Life Cycle activities
 Manual Linking of ProTrack Project with PS Project
 PM will release the ProTrack project for Time Sheet Entry
 Project Resources have tight Integration with Time Sheet

© 2008 MindTree Consulting Slide 7


ProTrack in OTC cycle
New Role Staffing
Request Extension/Rel
ProTrack–
PM PM
New UI

PIN Project Creation GME GME Approval Staffing


ORDER
DH/IGH OPS PM DM OPS

SO Creation Billing Template


Sales Support OPS
CASH
TBR Task Planning
Sales Support PM

Invoice Milestone
Generation Confirmation Timesheet Entry
Team Member
Finance D2-3 System D2

Timesheet
System driven Transfer Timesheet
Process driven GMA Approval
Potential bottleneck PM System PM
© 2008 MindTree Consulting Slide 8
ProTrack in OTC cycle contd….
New Role Staffing
Request Extension/Rel
PM PM

PIN Project Creation GME GME Approval Staffing


ORDER
DH/IGH OPS PM DM OPS

SO Creation Billing Template


Sales Support OPS
CASH
TBR Task Planning
Sales Support PM

Invoice Milestone
Generation Confirmation Timesheet Entry
Team Member
Finance D2-3 System D2

Timesheet
System driven Transfer Timesheet
Process driven GMA Approval
Potential bottleneck PM System PM
© 2008 MindTree Consulting Slide 9
ProTrack – OPS Activities

 ProTrack – cProjects 4.5


 Project Creation
 Select the Project Type
 Copy Project Template
 Maintain start date of the project
 Maintain Service Offerings
 Authorize/Assign Project Manager

 Project Role Creation


 Select the Project Role Type
 Maintain the start date and end date for project role
 Maintain Allocation %

 Project Role Staffing


 Assign Mind to Project Role
 Check the start date and end date with capacity allocation

 Project System – ECC


 Create PS Project, Project Start and End Date Maintenance, Release PS Project
 Maintain Billing Template for TnM, FPC and FMC Projects.
 Manual Linking of ProTrack Project with PS Project
 Execute ZROLES for ProTrack Project Roles and Staffing Synch with ECC

© 2008 MindTree Consulting Slide 10


ProTrack Demo

ProTrack
Demonstration

© 2008 MindTree Consulting Slide 11


ProTrack Demo

Step 1: Create
ProTrack
Project

© 2008 MindTree Consulting Slide 12


Step 1: Project Creation

1 2

For Service
Offerings,
Reference is PIN
Details
3

DO NOT
CHANGE
THE STATUS
© 2008 MindTree Consulting Slide 13
ProTrack Demo

Step 2: Create
PS Project

© 2008 MindTree Consulting Slide 14


Step 2: Create PS Project in ECC System

PS Project ID and
NAME = ProTrack
2 Project ID and
NAME

Transaction Code – CJ20N

3 CHECKLIST:
• PS Project ID = ProTrack Project ID
• PS Project Name = ProTrack Project Name
• Project Profile = CPR0001
• Project Structure Contains – Project
Definition and Project Root WBS (Both
Should Have the Same ID and Name )
• Add Billing Template (TnM, FPC, FMC)
© 2008 MindTree Consulting Slide 15
Step 3: Release
PS Project

© 2008 MindTree Consulting Slide 16


Step 3: Release the PS Project

Select the Project Definition


-> Then Click on EDIT MENU -
> STATUS -> RELEASE

Save The Project After


Release

© 2008 MindTree Consulting Slide 17


Step 4: Manual
Linking Of ProTrack
Project with PS
Project

© 2008 MindTree Consulting Slide 18


Step 4: Link the ProTrack Project with PS Project (1)

STEP 1: Change the Status


“SET TO ASSIGN”

STEP 2: Click on the


“ACCOUNTING” TAB

STEP 3: Click on “ACCOUNT


ASSIGNMENT” BUTTON
2
3
© 2008 MindTree Consulting Slide 19
Step 4: Link the ProTrack Project with PS Project (2)

STEP 1: Change the Status


“SET TO ASSIGN”
2
STEP 2: Click on the
“ACCOUNTING” TAB

STEP 3: Click on “ACCOUNT


ASSIGNMENT” BUTTON

© 2008 MindTree Consulting Slide 20


Step 4: Link the ProTrack Project with PS Project (3)

1 2

ProTrack Project ID =
PS Project ID

STEP 1: Select the ProTrack Project.

3 STEP 2: Select the PS Project

STEP 3: Click on “ASSIGN” BUTTON

© 2008 MindTree Consulting Slide 21


Step 4: Link the ProTrack Project with PS Project (4)

CHECKLIST BEFORE SAVE:

• PS Project ID = ProTrack Project ID


• PS Project Name = ProTrack Project Name

© 2008 MindTree Consulting Slide 22


Step 5: Maintain
the PS Project Start
& End Dates

© 2008 MindTree Consulting Slide 23


Step 6: Maintain the Start date and End Date of the PS Project

© 2008 MindTree Consulting Slide 24


Step 6: Maintain
Billing Templates
for PS Project

© 2008 MindTree Consulting Slide 25


Step 7: Maintain the billing templates in PS Project (1)

© 2008 MindTree Consulting Slide 26


Step 7: Maintain the billing templates in PS Project (2)

© 2008 MindTree Consulting Slide 27


Step 7: Maintain the billing templates in PS Project (3)

© 2008 MindTree Consulting Slide 28


Step 7: Maintain the billing templates in PS Project (4)

© 2008 MindTree Consulting Slide 29


Step 7: Maintain the billing templates in PS Project (5)

© 2008 MindTree Consulting Slide 30


Step 7: Assign
Authorization

© 2008 MindTree Consulting Slide 31


Assign Authorization to Project Manager Without Staffing

Step 1

Step 2

© 2008 MindTree Consulting Slide 32


Step 8: Create
Project Role

© 2008 MindTree Consulting Slide 33


Project Role Creation

In Step 2, Maintain the mandatory


fields
• Project Role Type
• Start Date, Finish Date
Step 1 • Allocation %

Step 2

© 2008 MindTree Consulting Slide 34


Step 9: Create
Project Role
Staffing

© 2008 MindTree Consulting Slide 35


Project Role Staffing

• BP Number is same as Employee ID


• After Staffing, verify the following
• Start Date, End Date, Required Capacity
• Any Changes to the Project Role, Recheck the Staffing Details and if
required redo the staffing with updated details.

© 2008 MindTree Consulting Slide 36


Step 10: Run
ZROLES

© 2008 MindTree Consulting Slide 37


Run ZROLES for Staffing Synch - 1

Transaction Code – ZROLES


Input – Project ID

© 2008 MindTree Consulting Slide 38


Run ZROLES for Staffing Synch - 2

Save the ZROLES data.

© 2008 MindTree Consulting Slide 39


ProTrack – Custom Enhancements

 Role based Filtering on staffing dates.


 Filter on completed and not completed tasks in Task Assignment tab
 Show only non completed/cancelled task in the Task assignment.
 Filter on Active and Inactive role in Resource assignment tab
 Show only the Active roles in the Resource assignment tab.
 Including the WBS/tasks from the existing Projects
 Move cancelled tasks to “Cancelled Task History”

© 2008 MindTree Consulting Slide 40


© 2008 MindTree Consulting Slide 41
Imagination Action Joy

Venugopal R
Manager – Information systems.

© 2008
2009 MindTree Consulting