Jackpot Question

Final Round
SMART COMPETITION
1 2 3 4

5 6 7 8
1
1
1 2

This is called “Chan Plott” which plotted by WOR & WOR’ on Y-axis and
Time(days) in X-axis.

Based on the pictures 1 & 2. What is the name of water problem production
number 1 and and the name of water problem production number 2?
Jawaban SUMBER : materi KP ku di cirebon
Coba dipastiin lagi ke dosen
• No 1 = water coning produksi kampus ke pak suwardi
krn itu materi komprenya anak
• No 2 = near wellbore breakthrough minyak tntg chan plot.
2
1
A well that is producing from a reservoir
having an average pressure of 2085 psig
produced at a rate of 282 stb/day when
bottomhole flowing pressure was 1765 psig.
Calculate the Absolute Open Flow Potential (AOFP) in stb/day !
Jawaban
Sumber :
Beggs, D. – Production
Optimizing Using Nodal
Analysis page 13

Toleransi : ±50stb/day
3
Arrange these sedimentary process from the oldest to
the youngest
Answer : C, B, A, D, E
4
Consider the following illustration. Please determine the shale volume!
Answer : 0.5 or 50%
Vshale = [GRlog – GRmin] / [GRmax – GRmin]
= [50 – 0] / [100-0]
= 0.5
5
Calculate mud cake thickness :
Bit size = 12 inch
Caliper = 10 inch
Answer : 1 inch
Mud cake thickness = [bit size - caliper] / 2
= [12 - 10] / 2
= 1 inch
6
This is the Semilog plot of pressure
drawdown. Region A, B and C is named as…
• Answer :
A = Wellbore Storage region
B = Transient Flow Region
C = Pseudosteady-state region
(ahmed Tarek, 446)
7
In 1962, J.J. Arps published one of the more complete
classification systems for petroleum reserves as depicted
in the below figure!
D
Developed
Proved E
C
Primary A
Reserve
Secondary B

Named reserve classification A, B, C, D, E !


Answer:
A : Probable
B : Possible
C : Undevelopment
D : Producing
E : Non Producing
8
Calculate the initial oil in place in STB , data are also available:

• Reservoir area = 780 acres


• Average thickness = 23 ft
• Connate water saturation = 0.27
• Effective porosity = 13%
• Boi (Factor Volume Formation) = 1,28 bbl/stb
• API gravity = 47o

Calculate the initial oil in place in STB.


Answer : (TAREK)
Pore volume = 7758 x Reservoir area x Average thickness x
Porositas = 7758 (780) (23) (0.13)
= 18,093,207.6 bbl

Initial Oil In Place = 18,093,207.6 x (1-0,27) / 1,28


= 10,318,782.46 STB