WIP Training

Oracle Training for work in process

Ben Rogerson
Contents
• Definitions

• What is a discrete job?

• Discrete job life cyle and associated transactions

• Discrete job features

• Scheduling of operations and job dates

• Outside Processing (OSP)


Definitions
• WIP = Work In Process • PIA = Produkt i arbete

• Discrete Job = production order • Tillverkningsorder

• Routing = sequence of operations • Operationslista

• OSP = outside processing (operations • Legooperationer, köp av tjänster inom en


conducted at suppliers) produktionsflöde

• WIP Move Transaction = method of advancing • Transaktionen som flyttar ett antal av produkt
a quantity of product through the routing from genom operationslistan från operation till
one operation to the next (labour cost operation (arbetskostnaden slå på jobbet)
incurred)

• WIP Assembly Complete = the transaction • Transaktionen som levererar in produkter från
that delivers finsihed products from WIP into PIA till lagret
inventory

• PUSH = material supply type where material • Material måste tas ut manuellt till jobbet
must be manually issued to the job

• Operation Pull = a form of back flush where • Material tas ut till jobbet vid rapportering av
material is issued to a job on completion of an operation då WIP Move transaktionen görs
operation (invoked by WIP Move Transaction)
What is a discrete job?
• An instruction to produce something

• A control mechanism for material, labour, resources, capacity and cost

• A record of production activities


Discrete Job Life Cycle
When assembly is finished
Usually by releasing a planned the job is delivered into
order from BAS-MFG The job is kitted and produced stock via WIP Assembly
Operations are reported and complete
NB: This status is material is issued during this
skipped by BAS for stage
OSP jobs

Creation Unreleased Released Complete Closed

The job becomes


Operation
COMPLETE if the entire
scheduling is
quantity has been
performed at The job is released
delivered into stock
this point by when it is time to start
Jobs are closed weekly
Oracle production. At this
Variances are posted
point transactions can
Capacity planning and at this time
begin and OSP
scheduling is performed
requisitions are
during this status
created
Transactions through a
job’s life
UNRELEASED! RELEASED! COMPLETE!

30 30 30
PULL PULL PULL WIP Assembly
PUSH
Complete
JOB
30 10
WIP Move WIP Move WIP Move

Q Operation 10 TM Q Operation 20 TM Q Operation 30 TM

Resource 10 Resource 20 Resource 30


UNRELEASED! RELEASED! COMPLETE!
64 64 64 WIP
Assembly
PULL PULL PULL
PUSH Complete
JOB
30 10
WIP Move WIP Move WIP Move

Q Operation 10 TM Q Operation 20 TM Q Operation 30 TM

Resource 10 Resource 20 Resource 30


WIP

Purchasing
Req 10 Req 20 Req 30

PO 10 PO 20 PO 30

Receiving Receipt Receipt Receipt


10 20 30

Inspection Inspection Inspection

Deliver to Deliver to Deliver to


shopfloor shopfloor shopfloor
Discrete Job Features
Job Number

Description of the
Item to be produced item

Status
Quantities Unreleased
Released
StartType
is the
of job Complete
quantity
(used for be
to follow up Closed
produced
purposes) Cancelled
Start and End dates
MRP Net is=the
BAS_BAHA Baha devices for the job
quantity
BAS_ACC the=plan
Accessories
should consider
BAS_TRANSD =
Transducers
BAS_PACK = Pack
(logistics)
BAS_OSP = Outside
processing

Revision number of
Bill of Materials
Revision number of
Routing

Default subinventory to Default locator to deliver


deliver finished product finished product into
into (from the Routing)
(from the Routing)
Summary of
quantities

Completed means
delivered into stock

Dates for important


status changes
Click here to show
the operations on
the job
Department

PRODUCTION = Internal
resources

Operation sequence OSP = External


resources
Scrapped
Rejected
Quantity scrapped
Quantity not
In Queue Running To Move approved for
Not used by BAS
completion Completed
Quantity waiting to In processRead to move to (rework)
be processed by the the next operation Quantity that has
operation or to inventory
Not used by BAS been completed by
the operation
The start date for The finish date for the
the operation operation
Click here to see the
resources attached
to the operation
Click here to see the
material on the job
How are jobs scheduled?
Two dimensions to scheduling
• Resource usage • Resource Capacity
– How long it takes to perform the operation – As defined and managed by planning
– Represents effort required – Expressed in hours and units
– Expressed in resource units – hours

• Work • 5,75 hrs per shft * 2 shifts = 11,5 hrs


– 0,67 hours/pc * 90 pcs = 60,3 hours – 0700 – 1000
– 1030 – 1315
• Use 5 resource units
– 1315 – 1600
– 60,3 hrs / 5 = 12,06 hrs from start to end
– 12 hrs 3 minutes – 1630 – 1930

12hrs 3min – 11hrs 30min = 33 min

This job is 33 minutes longer than one working day so the


scheduling result is:
Scheduling result

12hrs 3min of working time between Start and Completion


Scheduling with multiple
operations

• Forwards from start

• Backwards from end